Sugarbush’s New Valley House Quad

IMG_4883
Support structure for the Doppelmayr Tristar drive terminal.

New England ski areas are building three new lifts this summer and all of them happen to be in Vermont.  At Sugarbush, the Valley House double (a 1960 Carlevario-Savio) is out and a Doppelmayr fixed-grip quad is going in.  At some point the old lift got a new Poma Alpha drive terminal and Borvig chairs.  The perfectly good Poma terminal is off to West Mountain on the other side of Lake Champlain in New York.  Sugarbush’s new lift looks like it’s going to have the Tristar-model terminal like many other recent Doppelmayr lifts in New England.  The bottom terminal has been moved downhill to be much closer to the Super Bravo Express than the old lift.  This will be Sugarbush’s 8th quad chair between Lincoln Peak and Mt. Ellen.  Doppelmayr still has a ways to go on this project with just a couple towers and sections of both terminals standing but all the important concrete work is done.

IMG_4886
Loading carpet and gates are already installed.

IMG_4890
Tower 2. The rest of the towers will need a heli.
IMG_4896
Concrete for the top bullwheel.
IMG_4897
Looking down at the last three towers from the top terminal site.

One thought on “Sugarbush’s New Valley House Quad

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s