- Telluride’s ski patrol strike ends after 13 days.
- Le Massif partially reopens with limited hours as a strike drags on.
- More than 500 people spend most of an overnight atop the Palm Springs Tramway following a technical issue, now resolved.
- Nearly 200 are rescued safely from Whitefish’s Big Mountain Express in a multi-hour rope evacuation.
- Sugarloaf’s SuperQuad goes down due to a gearbox issue.
- Leitner-Poma will build the new Canyons Village gondola at Park City.
- Anakeesta’s new LPOA gondola to be called Crystal Express.
- Doppelmayr wins the contract for Killington Snowdon with a total project cost of $7.04 million.
- Doppelmayr also will build the world’s longest urban gondola in Mexico City with 12 stations, 462 cabins and 114 towers over 9.4 miles.
- Wildcat reopens its beginner chair after a year-long closure.
- Castle Mountain’s new map shows lift expansion on Mt. Haig.
- A state evaluation following the Park City gondola mishap last week notes no mechanical malfunction but says “a gondola cabin leaving a terminal with a passenger being suspended by the foot is not acceptable and has the potential for extremely serious injuries.” During a Utah Passenger Ropeway Safety Committee Meeting, Park City’s Director of Mountain Operations Nick Dana notes “we did have a loading incident on Red Pine Gondola last week so we’re continuing to look into that and work with the manufacturer to investigate into our door monitoring switches there at top of Red Pine Gondola.”
- Also from the UPRSC, the Forest Service notes several recent chair detachments on Riblet and Stadeli lifts in Montana.
