- First LST Ropeways detachable set to finally open in March.
- Silver Mountain’s new owner hints at future new lifts.
- Steamboat paper does a two part story on lift and gondola evacuations.
- Pandora’s lift still in the cards for Aspen Mountain but 1A might come first.
- In France, Poma finalizes contracts to build $121 million urban 3S gondola in Toulouse, $15.6 million jigback in Orléans.
- Arlington says no to Georgetown-Rosslyn Gondola.
- Innsbruck to build $12.7 million D-Line gondola.
- Saddleback effort moves forward, but lifts will not spin this season.
- Al Henceroth of A-Basin explains why he chose a fixed-grip quad for The Beavers.
- Town of Gatlinburg to review Boyne’s design for new Sky Lift tomorrow.
- Leitner-Poma presents gondola technology as a potential solution to downtown traffic in Breckenridge.
- Wildfire tears through $24 million Christchurch Adventure Park in New Zealand, where a Doppelmayr high speed quad opened less than two months ago.
- The Skytrac blog has a cool post about the newest Rainforest Adventures park in St. Maarten and its two hurricane-proof fixed-grip quads.
- South Korea prepares for a Doppelmayr Olympics, Poma signs new contract for a 2022 venue in China.
- Whitewater’s Summit double goes up for sale.
- Poma begins hanging 160 Diamond cabins on Santo Domingo’s two new urban gondolas.