Amid Growth, Schweitzer Eyes Expansion

IMG_7652
The Cedar Park Express, constructed last year by Leitner-Poma of America, is one of six new lifts built at Schweitzer since 2000.

With four major lift replacements completed over the last 15 years, North Idaho’s Schweitzer Mountain Resort is looking beyond its boundary for the next phase of on-mountain development.  Completed just last summer, phase one of the resort’s 2018 master plan included two key lifts in the North Bowl replacing an outdated double.  The mountain also recently completed a gorgeous summit lodge called Sky House and two more chairlifts above its village.  Looking ahead, Schweitzer’s two longest lifts to date are planned for opposite ends of the resort.

MasterPlanMap1 (1)

Privately-held Schweitzer will proceed carefully as growth makes sense.  The resort does not participate in a multi-resort pass product but skier visits have grown almost 35 percent over the last 15 years.  Current development focuses on the village, including a $35 million boutique hotel under construction.  “We have a pretty conservative approach,” notes President and CEO Tom Chasse. “Our business is growing but we want to make sure that we are financially sound and don’t get ahead of ourselves.  We also want to maintain a razor sharp focus on improving the overall customer experience with everything that we do.”

schweitzer-hotel-arrival-view-2019

Phase three will see the launch of a dedicated day use and ski school portal away from the overnight village.  “Growth has been huge the last few years and we need to find solutions for our parking issues and ease the burden on our existing village,” notes Mountain Operations Director Rob Batchelder.  “I’m very excited about solving those problems with this third phase of development in the Mid-Mountain area.  Physically, we need room to grow and Mid-Mountain does that for us.”  The $50 million project will include a day lodge, three dedicated beginner lifts and 6,400 foot detachable chairlift.  The latter will include a half mid-station with access to six new intermediate trails.  Riders staying on board will gain access to North Bowl without the need to transit the village or ride the busy Great Escape quad.

Continue reading

Atlantic Canada’s First Gondola to Open at Cape Smokey

A modern Leitner-Poma gondola is coming to Nova Scotia’s beautiful Cape Breton Island. The new lift will become the centerpiece of a thousand foot mountain called Cape Smokey, which features views of the Atlantic Ocean.  With summer visitation outpacing winter in this region, the gondola will provide year-round access to skiing, sightseeing, mountain biking and a new tree canopy walk.

https://www.instagram.com/p/B7dRd1tF-RT/

Cape Smokey was recently rescued by a New York-based investor group after falling into disrepair as a nonprofit society.  Developer Joseph Balaz purchased the mountain from the province of Nova Scotia for just CAD$370,000.  The area’s 1995 Blue Mountain quad last operated in 2006, leaving only a Poma platter lift operable in recent seasons.

Removal of the mountain’s quad chair has already begun and the base-to-summit gondola is expected to open in July 2021.

Mt. Rose Gains Expansion Approval

MtROSE-frontside-01.3-02282020

New terrain at Mt. Rose, Nevada could be accompanied by a rare two-stage detachable chairlift under a plan signed last week.  Known as Atoma, the expansion would feature 112 acres of beginner terrain across the Mt. Rose Highway from the existing Wizard quad.  The project would include eleven developed ski trails, a skier bridge and new snowmaking.  A dual purpose detachable chairlift would provide both egress from the new terrain and a connection back to the top of Wizard.  Skiers and riders seeking to lap the new trails would unload at an angle station near the highway while others would remain on board.  Capacity of the lift would be 2,000 skiers per hour, providing a low-density beginner experience away from more advanced terrain.  The plan does not specify a chair size, though Mt. Rose’s two existing detachables both feature six place chairs.

Chairlifts with angle stations are quite rare in the United States, in part due to their high cost.  Garaventa CTEC built the first such lift on Vail’s Golden Peak in 1996.  Nearby Breckenridge debuted the Peak 8 SuperConnect in 2002, allowing mid-line loading.  Utah’s Alta Ski Area completed America’s first chairlift angle station with two separate drive systems in 2004 (Alta once planned to build a second such lift but opted instead for a gradual line turn with no loading or unloading.)  Steamboat’s Christie Peak Express followed in 2007 with unloading for beginners at an angled mid-station.  After a 12 year gap, Alpine Meadows and Leitner-Poma completed the Treeline Cirque quad in 2019 featuring an angle station at a cost of $10 million.  If the angle concept ends up proving too expensive for Mt. Rose, the Forest Service authorized installation of one 3,000 foot beginner lift and a separate 1,650 foot connector chair as an alternative.

atomamap

Mt. Rose has not released a timeline for construction or identified its lift manufacturer partner yet.

Jasper SkyTram Proposes Gondola Replacement

IMG_3369

The operator of Canada’s oldest aerial tramway is looking to the future in the form of a major redevelopment and eight passenger gondola.  The Jasper SkyTram opened in 1964 and currently carries 30 riders at a time up Whistlers Mountain from March through October.  Built by Pohlig-Heckel-Bleichert of Germany, the tram is approaching the end of its operational and economical life with facilities that no longer meet visitor expectations.

redevelopmentmap

A replacement gondola could run in a more environmentally and geologically sound alignment with all new terminal and tower locations.  The bottom station would sit along the Icefields Parkway at significantly lower elevation than the current base.  Shortly after departing the valley, gondolas would make a sweeping turn and eventually reach a top terminal with a modern interpretive center, restaurants, trails and barrier-free views.  The lift would become one of Canada’s largest, rising nearly 4,000 vertical feet over 2.75 miles.  The retired access road, stations and tower locations would be allowed to return to a natural state.  New terminals would be accessible for visitors of all abilities and the project would include additional parking, transit and bicycle facilities.

IMG_3051
The current stations are neither wheelchair accessible nor capable of handling demand on peak days.

I know first hand the limitations of aerial tramways for today’s visitors and Jasper is not the first location to consider alternatives.  Heavenly’s scenic aerial tram was effectively replaced by a gondola in 2000 and Grouse Mountain is considering making a similar move.  Gondolas are both comfortable and efficient, offering guests their own cabins and secure seating.  Under the proposal, lift capacity would increase from 200 per hour to 950 with less waiting and no need for standing in crowded cars.  Gondola technology would also enable year round operation.

googleearthjasper

The concept is just that and no decisions have been made.  The SkyTram Partnership and Parks Canada are seeking public feedback, which can be sent to redevelopment@jasperskytram.com.

Alterra Capital Plan Includes New Lifts and Expansions for 2020-21

North America’s second largest resort operator today announced the purchase of two lifts for Mammoth Mountain, new terrain at Steamboat Resort and a two year project to build new trails and lifts at Tremblant.  Alterra Mountain Company will complete $223 million worth of capital improvements in total for next season, up from $181 million in 2019-20 and $130 million the year before.  Rival Vail Resorts announced back in December spending of $210 to $215 million across 37 mountain resorts, including construction of six new lifts in 2020.

IMG_3385
Mammoth’s Broadway Express #1 and Canyon Express #16, both built by Yan and upgraded by Doppelmayr, will be replaced this summer.

At Mammoth, one of the most utilized lifts in the Alterra system, Broadway Express, will be replaced with a high-speed six place detachable, increasing uphill capacity by 42 percent to 3,200 skiers per hour.  Sister lift Canyon Express will be replaced with a 3,000 people per hour six pack, increasing uphill capacity out of Canyon Lodge by 66 percent.  Both of these lifts are likely to be supplied by Doppelmayr.

IMG_2612
This will be the last season for the Canyon Express, a workhorse lift above the Village at Mammoth.

In Colorado, Steamboat Resort will expand onto 355 acres of Pioneer Ridge, providing skiers and riders with more terrain to explore.  Pioneer Ridge will feature 1,800 vertical feet of advanced and expert gladed terrain accessible via the Pony Express lift.  Twenty five new chairs will be added to the Garaventa CTEC high speed quad, increasing capacity from 1,200 people per hour to 1,800.  The Steamboat master plan calls for Pioneer Ridge to eventually feature its own detachable chairlift.

img_5339
Steamboat will open up hundreds of acres of new terrain beyond Pony Express and become Colorado’s third largest ski area.

This summer, Tremblant will begin a two-year expansion project called Timber.  Quebec’s most popular mountain will open a new beginner zone with a magic carpet on Versant Soleil for 2020-21 to enhance the learning experience for new skiers and riders.  In late 2021, the Timber summit will open with a new high speed quad and eight trails leading to Versant Soleil and the North side.  “This project, which aims at diversifying the ski area, is part of the continued development of Versant Soleil and reaffirms Tremblant’s leader position as the #1 ski resort in Eastern North America,” said the resort.

“Three years ago, when we formed Alterra Mountain Company, an initial priority was to commit to investing a half a billion dollars by 2023 across our family of North American destinations,” said Rusty Gregory, CEO of Alterra Mountain Company.  “To date, we have invested more than $350 million and are committed to exceeding our original plan, spending $575 million by 2020 on lifts and gondolas, snowmaking, summer activities, real estate development, hospitality and technology, all in the name of creating memories for our guests through an elevated mountain experience.”  Privately-held Alterra owns 14 resorts, having recently completed its acquisition of Sugarbush.

Arizona Snowbowl to Install Combination Lift

c0eb5320-9570-44a5-b178-248d62adc966-7972-000001b23d6ae625

Arizona Snowbowl’s fourth new lift in six years will be the largest yet –  a chair/gondola combo lift rising almost 2,000 vertical feet.  The new base-to-summit workhorse will operate year round for skiers, snowboarders and sightseers beginning next winter.  “Since its inception, Agassiz has been the beating heart of Snowbowl,” notes the resort.  “With the replacement of the lift, we’re ushering in a new era.  More than an upgrade, the new Agassiz lift completely redefines the Snowbowl experience.”

Unlike most combination lifts, Agassiz will feature eight passenger gondolas between every two chairs (usually the ratio is more like one in four or five.)  Agassiz reaches an elevation of 11,500 feet and enclosed cabins will offer guests a comfortable option in inclement weather.  The gondolas will also provide improved access for guests with disabilities and ride time will decrease from 15 minutes to seven.  Capacity will remain a modest 1,200 skiers per hour so as not to overwhelm expert trails off the summit.

img_5928
In addition to summer and winter, Agassiz operates all fall for scenic rides.

The Leitner-Poma Telemix will be the third lift in the Agassiz alignment over six decades of history.  The existing Agassiz triple opened in 1986 and is currently inoperable due to a mechanical issue.  The CTEC is expected to be repaired this week and will finish out the remainder of the season.  Once removed, it will be stored for eventual re-installation at a location to be determined.

54881817-80c7-4b9d-a6a6-88db92e2d3f6-7972-000001b24ad2c5ce

Mountain Capital Partners has invested heavily in Arizona Snowbowl since purchasing the resort back in 2014.  Improvements to date include a new lodge, two different fixed-grip quads and a six place called the Grand Canyon Express.  2020’s project will be the largest in resort history and one of the most significant lift additions in North America this year.

Timberline Lodge to Build Pucci High Speed Quad

IMG_7508

Timberline’s quest to become an all-detachable mountain will become closer to reality this fall with the replacement of Pucci by a new quad chair.  Already approved by the Mt. Hood National Forest, the project will see the retirement of Timberline’s oldest operating chairlift, a Poma triple dating back to 1987.  Another Poma fixed grip lift built the same year, Bruno’s, is slated to be replaced with a conveyor in the near future.

Timberline’s sixth high speed quad will re-use most of the existing towers and maintain the same 1,800 passenger hourly capacity.  Ride time will decrease to just 4.5 minutes.  The new lift will enhance the beginner and intermediate experience at the next lift guests progress to after Bruno’s.  Timberline did not announce a manufacturer, though Doppelmayr built the area’s last four new lifts.

Sugarloaf Outlines West Mountain Expansion & Future Lift Upgrades

86384575_10156559049556879_3143727309744242688_o

Boyne Resorts will embark on a major investment campaign at Sugarloaf in the coming years called Sugarloaf 2030, similar to plans revealed recently for Big Sky, Loon Mountain and Sunday River.  The central Maine resort will begin work this summer on a 450 acre expansion of West Mountain with a variety of new trails.  The area will eventually feature a big new lift.  As part of the expansion, the current West Mountain double will be shortened to about half its current length.  The expansion includes a modest new base area with expanded parking, tubing and a small lodge.

West Mtn Hero 3

“This development will expand Sugarloaf’s beginner and intermediate terrain, and will greatly alleviate traffic congestion at the SuperQuad by shifting significant numbers of riders to this new area,” says the Sugarloaf 2030 website. “Several options are being considered for size and type of lift for this location, with lift construction expected to begin in the summer of 2021.”  The lift will be designed with foot passengers in mind as Bullwinkle’s will see expanded use for weddings and conferences.  West Mountain will also be home to a future lift-served mountain bike park.  “This will be the most significant project at Sugarloaf since the SuperQuad was built in the mid 1990s,” noted Sugarloaf General Manager Karl Strand. “We’re thankful for leadership of Boyne Resorts, which, over the past 13 years, has helped us get Sugarloaf to a position of growth that allows for development projects like this.”

Lifts across the mountain will be replaced over the next decade.  Timberline, a Borvig quad serving the summit will be replaced with another new lift supporting varied year round experiences.  A third near term priority is the Double Runner double-double, which is approaching 50 years of age.  A new quad would better serve ski school programs and increase out-of-base capacity.  Carrabassett Valley Academy also plans to partner with Sugarloaf on a new alpine training surface lift servicing race trails above Double Runner.

Further out, Boyne plans to replace two more aging quads.  A new King Pine would run in a modified alignment with better wind resistance and improved reliability.  A future SuperQuad replacement is more about increasing capacity with state-of-the-art equipment.

Between this new plan, Sunday River’s vision announced two weeks ago and the rebirth of Saddleback, the 2020s are already proving to be an exciting time in Maine.  The Pine Tree State is well positioned to be a great place to ski in a changing climate and companies are responding with big investment plans.

Nordic Valley Seeks to Add a Fourth Chairlift

snowmakingconcept

Mountain Capital Partners no longer plans to build nine new chairlifts and one of the world’s longest gondolas in Northern Utah but a scaled back expansion of Nordic Valley is moving forward.  The previous vision hinged on use of Forest Service lands and received chilly public reception.

The resort recently applied for a conditional use permit to add a new lift on 347 acres of entirely private land south of the current ski area.  The updated project includes 50 acres of new snowmaking coverage and an approximately 4,400 foot chairlift dubbed Lift 5.  Photos included with the application depict Skytrac lifts, indicating the new lift would be fixed-grip.

expansionconcept

Back in 2018, Mountain Capital Partners forged an agreement to operate Nordic Valley, becoming the firm’s first property in Utah.  MCP specializes in modernizing historically under-capitalized resorts across the Southwest.   “The proposed project will allow for an improved guest experience for the surrounding communities and will compliment and improve the existing ski operations at Nordic Valley,” said the Colorado-based company.  “With the addition of snowmaking, Nordic Valley will be able to minimize the impact of low natural snowfalls and offer a more consistent product to its customers.”

New York State Ski Areas Plan New Lifts for 2020-21

IMG_6269
As part of a proposed budget, three more lifts similar to Belleayre’s new Lightning quad would be built at ORDA ski resorts in 2020 and 2021.

New York’s state-owned Olympic Regional Development Authority plans to spend a whopping $147 million to upgrade its facilities during 2020 and 2021.  Those venues include Belleayre, Gore Mountain, the Olympic Ski Jumping Complex and Whiteface, which together saw three new lifts over the last three years.  On Friday, the agency issued a formal request for proposal for three more fixed-grip quad chairlifts to be built over two years.

This summer, both Gore and Whiteface would see new lifts replacing Riblet models.  Gore proposes replacing the Sunway double with a fixed quad capable of moving 2,400 guests per hour.  The previous lift dates back to 1986.  The new alignment would end slightly higher than the current lift, with a 566 foot vertical rise and 3,102 foot slope length.  This machine would be bottom drive, bottom tension with a loading carpet.

sunway2020

Also in 2020, Whiteface plans to replace the Bunny Hutch triple with a quad.  The current lift opened in 1997 with used Riblet equipment.  The new lift would be about 450 feet longer with a vertical rise of 364 feet.  This quad would also be bottom drive/bottom tension and may include a loading conveyor.

bunnyhutch2020

Following in 2021, Gore would see a replacement for the High Peaks double.  The existing lift is a quirky Riblet-CTEC hybrid that experiences long lines during peak times.  The new lift would be a bottom drive fixed-grip quad with a design capacity of 2,400 skiers per hour.

highpeaks2021

No new lifts are planned for Belleayre, understandable considering the Catskills mountain got two of the last three projects.  There’s no guarantee ORDA will follow through on these specific plans but the RFP gives us a pretty good idea of the authority’s wish list.  Potential suppliers have until March 5th to bid and, if funded and approved, construction would be complete by November 15th of 2020 and 2021.