Sun Valley Plans Two More Six Packs

Two of Bald Mountain’s most popular lifts – Christmas and Seattle Ridge – will be upgraded from quads to larger lifts under a plan up for Forest Service approval. The project follows hot on the heels of two similar upgrade projects taking place this summer at Sun Valley. Construction crews with Doppelmayr are working to replace Greyhawk and Challenger with new four and six seat chairlifts on the Warm Springs side of the mountain. When both projects are complete, Sun Valley Resort will have replaced four of its seven Yan detachable quads built in the late 1980s and early 1990s. The last three up for replacement will be Frenchman’s, Lookout Express and River Run Express in future seasons.

The new Christmas lift will feature both six passenger chairs and enclosed gondola cabins. This will create a base-to-summit gondola route in conjunction with the existing Roundhouse Gondola, which runs from River Run Day Lodge to the mid mountain Roundhouse. Christmas Chondola will load at the Roundhouse and increase capacity from 2,400 guests per hour to 3,000 per hour. The top terminal location will move slightly to provide better connectivity with the Lookout Day Lodge for foot passengers riding the new chondola.

On Seattle Ridge, another new six pack will similarly increase capacity from 2,400 to 3,000 skiers per hour. This new lift will also travel in a slightly modified alignment to accommodate a new ski patrol facility. “Both of the existing lifts are over 35 years old and are nearing the end of their operational lifespans,” the Forest Service wrote in its scoping letter. “Replacement of the lifts would ensure a safe and reliable user experience, and increased lift capacity would help address the long lift lines experienced at both lifts in their existing condition.”

A public meeting about Sun Valley’s latest projects is scheduled for Thursday, August 31st from 4:30 to 6:00 pm at the Ketchum Library. Public comments can also be submitted online to comments-intermtn-sawtooth-ketchum@usda.gov.

News Roundup: Great Causes

Tornado Damages Lifts at Snow Ridge, NY

An large tornado damaged several lifts and other buildings at Snow Ridge Ski Resort late last night. The ski area, located in Turin, New York, posted this morning that all three of its chairlifts sustained damage from extreme wind and falling trees. Photos showed lift buildings overturned, safety bars blown off chairs and towers de-roped.

All of the lifts at Snow Ridge date back the 1950s through 1970s. The Little Mountain and North doubles appeared to sustain the most damage from the storm. “The Ridge got hit pretty hard by last evening’s tornado,” Snow Ridge wrote this morning on Facebook. “Everyone is safe, which is the most important thing but this damage really hurts. We are devastated but will rebuild,” the mountain wrote.

Update: The National Weather Service determined the tornado was an EF-3 with peak wind gusts estimated at 140 mph near Snow Ridge.

News Roundup: Ponderosa

News Roundup: Ahead of Schedule

News Roundup: Repaired