As one of America’s oldest resorts, Loveland Ski Area has welcomed skiers to the Continental Divide continuously since 1937. Although now surrounded by the likes of Keystone, Breckenridge and Winter Park and with I-70 literally cutting through it, Loveland remains a local favorite with plentiful snowfall and varied terrain served by nine fixed-grip chairlifts. The first double chair – a Heron – debuted at Loveland Basin in 1955. A second ski area, Loveland Valley, opened in 1961. A number of Heron, Heron-Poma and later Lift Engineering lifts were added through 1990. The first modern Poma quad chair debuted in 1996, followed by a series of Leitner-Poma triple and quad chairs to modernize the fleet. When Lift 9 opened in 1998, it became the highest-elevation chairlift in North America, a title Loveland held until Breckenridge opened the Imperial SuperChair in 2005.

Loveland generally builds lifts below maximum capacity and skier density is much lower than the industry average, with 1,800 acres of skiable terrain and an hourly lift capacity of over 14,000 skiers. The development plan notes that Loveland’s lift network generally serves the terrain well, but some lifts are approaching the end of a typical 35-year lifespan and a few changes should be made. Just last week, lifts 1 and 6 had to be closed for multi-day repairs but have since re-opened.




