- The Forest Service tentatively approves Vail’s Golden Peak T-Bar project.
- US Representative from New York Patrick Maloney dreams up a gondola across the Hudson.
- Red Mountain seeks approval to build the Topping Creek lift.
- Apple Mountain, Michigan is no longer a ski area.
- The first rope evac of the season goes to Super Bee at Copper.
- Gore Mountain solicits bids to replace Sunway and High Peaks with fixed grip quads. That brings the Olympic Regional Development Authority to five potential lift projects for 2019!
- The Aspen City Council considers Aspen Mountain’s Telemix project again.
- The Jackson Town Council rejects Snow King Mountain’s proposed gondola alignment.
- Doppelmayr apologizes for a delay completing the new Blackcomb Gondola. The new Catskinner and Emerald Express lifts open Thursday and the gondola will be finished by December 14th.
- Calgary voters say no to hosting the 2026 Olympic Winter Games.
- The world’s largest urban gondola network now transports 250,000 passengers every weekday with the most popular line doing a million passengers every 19 days.
- Alterra’s Ikon Pass now includes three resorts in New Zealand; Vail adds Les 3 Vallées, France and Skirama Dolomiti in Italy to the Epic Pass.
- Following a lift failure and other struggles, the owners of Timberline, West Virginia seek to recapitalize and restructure the business.
- Remember Gudauri, the Georgian ski resort which made global headlines last winter? It’s fixing the quad that rolled back and adding six more lifts.
- The Hermitage Club receiver will retain a single lift mechanic to maintain five chairlifts in mothballed status over the winter.
- The longest Skytrac to date is ready for winter in Washington State.
- Killington puts new Sigma cabins on the K-1 Gondola a few at a time.
- The Ramcharger 8 haul rope is spliced and chairs are in place at the summit of Andesite Mountain.
- Ski Blandford is officially back in business minus one chairlift.
Snow King
News Roundup: Mother Nature
- Lawsuit filed by man who fell from Seven Springs chairlift in 2015 thrown out.
- CWA joins Instagram and look at how many gondola cabins are waiting to leave the factory this fall!
- Snowbasin now has live streaming webcams at both six-pack terminal construction sites.
- “Time is of the essence,” Snow King GM says seeking approval for Summit Gondola and ski expansion.
- I hit four awesome retro T-Bar–only ski areas in Idaho last weekend.
- Red Bull turns Swedish tramway into a rope swing.
- Two Skytrac quad chairs reaching the highest point on the Dutch side of St. Maarten faced a huge test Tuesday, taking a direct hit from a Category 5 hurricane just ten days before their scheduled grand opening. Skytrac says the lifts were designed to withstand 200 mph winds.
- This was the view from the gondola Monday night as wildfire threatened Crystal Mountain. The fire has already burned much of East Peak, inside the permitted ski area where Crystal sought approval to build a new lift in 2004.

