- The Forest Service sends a notice of noncompliance to Montana Snowbowl over the Snow Park lift incident and response.
- Crystal Mountain’s President departs and Alterra reevaluates the announced Reimagine Crystal plan.
- Lutsen Mountains to retire the 10th Mountain triple.
- Hoodoo reports a Riblet clip ejection of a misloaded chair on the Hodag quad with no injuries to the rider(s).
- Mad River Glen’s Sunnyside double may get a mid-station.
- Le Massif completes a four hour rope evacuation of the Massif Express gondola, now closed for the season due to a gearbox issue.
- Mont-Sainte-Anne’s gondola will reopen tomorrow, four months after a cabin fell off.
- Board members resign from the Antelope Butte board of directors citing lift safety concerns.
- The Balsams says now is not the time to go to market.
- Woods Valley eyes installation of two used CTEC quads over the next few years.
- Big Sky shares photos of new tram cabins being fabricated in Switzerland.
- Two studies see the ropeway market growing around 10 percent annually over the next decade with the North American share growing to near 20 percent of the global total.
- Belleayre announces replacement of Lift 7 with a Doppelmayr quad.
Month: April 2023
Sun Peaks Announces West Bowl Express
Construction has already begun on Sun Peaks Resort’s third new chairlift in six years, the West Bowl Express. The CA$12 million Doppelmayr detachable quad will replace the retired West Bowl T-Bar in a much longer alignment and open in late 2024. West Bowl Express will service approximately 1,000 vertical feet with nearly a mile of slope length in the high alpine. “Sun Peaks continues to evolve and this significant new lift infrastructure will diversify the experience in an important pod of terrain in the resort,” noted Darcy Alexander, Sun Peaks Resort Vice President and General Manager. “Guests will have additional trails and vertical to explore with the convenience and efficiency of detachable lift technology.”
Preliminary site work is already finalized and foundations will follow this summer with steel installation commencing in 2024. When the project is complete next November, Sun Peaks will operate a 100 percent Doppelmayr fleet with eight quad chairlifts and two surface platters.
Instagram Tuesday: Art
Every Tuesday, I feature my favorite Instagram photos from around the lift world.


