Twenty Years of New Lifts at Crystal Mountain

There aren’t many ski areas in this country with as modern a lift system as Crystal Mountain in the Washington Cascades.  When I learned to ski at Crystal in the early ’90s, it was owned by a co-operative and featured a bunch of double chairs dating back to the ’60s and ’70s.  In 1997, the co-op sold itself to Boyne Resorts in hopes of bringing desperately-needed capital improvements to Washington’s largest ski area.

CrystalMountainWA

Modernize Boyne did.  In the first two years of ownership, the Kircher family brought Crystal the northwest’s first two six-packs.  Two years later the Green Valley double was replaced by a Doppelmayr high speed quad, the mountain’s fourth detachable.  In 2007, the Northway lift opened up 1,000 acres of new off-piste terrain.  Perhaps the biggest project of all was the addition of the 8-passenger, top-to-bottom Mt. Rainier Gondola in 2010.  Last summer, Crystal replaced its final remaining Riblet and Hall doubles with new fixed-grip lifts (one had been destroyed by an avalanche, leaving the mountain with no choice but to replace the only way to the summit.)  Now almost 20 years since Boyne arrived on scene, the average lift here is less than 15 years old.  It’s a far cry from many of Crystal’s northwest neighbors. Snoqualmie, for example, still operates 11 Riblet double chairs dating as far back as 1967.

CrystalMap
Today, Crystal Mountain operates a gondola, two six-pack detachables, two high speed quads and five fixed-grip chairs.
By now Crystal has implemented much of its 2004 master plan but a handful of lift projects remain on the horizon.  Two aging lifts still need to be replaced.  Rainier Express was Crystal’s first detachable, opened in 1988, and is nearing the end of its useful life. The plan is to replace it eventually, possibly with a six-pack.  The Discovery beginner lift is also slated to be replaced with a more learning-friendly and extended high speed quad.

Continue reading →

Sun Peaks Plans to Double in Size Again

Sun Peaks is Canada’s second largest mountain resort with 4,270 acres and 360-degrees of ski terrain spread over three mountains.  The biggest of those is Tod Mountain, which was also the original name of the ski area in 1961.  Nippon Cable of Japan purchased the resort in 1992 and doubled its size, adding eight new lifts in nine years and expanding onto Sundance and Morrisey mountains.  Nippon Cable should be a familiar name; the company licenses and sells Doppelmayr technology throughout Japan. Thus Sun Peaks is North America’s largest 100% Doppelmayr mountain.

2015-16-Alpine-Map
Today Sun Peaks operates 9 lifts, all but one of which were built since 1993.

Ecosign Mountain Resort Planners updated the master plan for Sun Peaks Resort in 2013 that aims to expand lift service into new areas and make significant changes to the current lift system.  Many of the proposed changes center around the Top of the World, the ski area’s 6,824-foot summit.  The two lifts that currently end here will be shortened or removed and three new ones added.  The Burfield quad (the world’s longest fixed-grip lift) will be shortened to just above its current mid-station. Primary access to Top of the World will become the Crystal Express, a six-pack replacement of the Crystal triple chair in a new and extended alignment.  A 30-passenger aerial tram is proposed from the top of the Sunburst Express to Top of the World for sightseeing.  A new high speed quad called Sunnyside Express would come from the west and top out near the two other summit lifts.

The West Bowl T-Bar would be replaced with a new, longer version while two of Sun Peaks’ three detachable quads – Sunburst and Sundance – would be replaced with six packs.  The missing link between the village and Mt. Morrisey would finally be added with a new West Morrisey quad chair.

2013masterplanmap

Continue reading →

Whistler Blackcomb’s Next 20 Years

Whistler Blackcomb is the greatest resort success story on our continent – from humble beginnings in 1966 to a resort municipality with 53,000 beds, Olympic host and the first to draw two million skiers in a season.  While Whistler and Blackcomb mountains were developed independently, they are now linked by one of the most iconic ropeways ever built.  Today, the mountains have a fleet of thirty lifts including seven gondolas and 14 detachable chairs over 8,200 sprawling acres.  Despite being the largest ski resort in the US or Canada, W-B still gets crowded and has opportunities for continued improvement and expansion.  The resort’s master plan prescribes replacing nine lifts and adding eleven more, primarily on Whistler Mountain. Many of the lifts add new out-of-base capacity with the goal of “staging” both mountains with 32,000 skiers in 2.5 hours or less.

Winter-Dual-Mountain-Evening-Lights-Snowy-Trees-Village-DavidMcColm

On the Whistler side, the plan includes a major expansion to the south, creatively dubbed Whistler South.  It would include an 8-passenger gondola from a new “Cheakamus” parking area and another base facility part way up.  At just 2,000 feet above sea level, The lower base would have no trails to it, just the gondola to the upper base area.  A second gondola would connect to here from Whistler Creekside.  Trail pods above would include a beginner area and three detachable chairlifts including one in Bagel Bowl.

Whistler's Master Plan includes removing 5 lifts and adding 14.
Whistler’s Master Plan includes removing 5 lifts and adding 14.

The Creekside base would also get a fourth gondola direct to Whistler’s Chic Pea, bypassing the Creekside Gondola/Big Red choke point.  Higher up, Franz’s chair and Whistler’s two original T-bars would be replaced by a single detachable quad from the bottom of the former to the top of the latter.  At the heart of Whistler Mountain, Emerald Express is slated to be swapped with a six-pack.  The quad would move to a parallel alignment ending slightly higher.  Talk about an increase in capacity!

If you’ve ever been in Symphony Bowl, you know the high speed quad built in 2006 serves an area larger than most ski resorts.  As such, Whistler Blackcomb plans two more lifts starting at the Symphony base fanning out in opposite directions.  One called Robertson’s goes towards Harmony while the other serves either Flute Peak or Flute Shoulder with a detachable four or six-passenger chair.  Access to the alpine from Whistler Village stays exactly the same; the only change on this side of the mountain is replacement of Magic (a Yan triple) with a 6/8 chondola.

Continue reading →