Forest Service Launches Aspen Mountain Pandora Analysis

pandoramap

The White River National Forest will consider yet another new lift project over the coming months, this time high on Aspen Mountain.  A Notice of Proposed Action released today comes as the most-skied forest in the country simultaneously weighs proposals for two new lifts on Vail Mountain, two in McCoy Park at Beaver Creek and one at Aspen Highlands.  For Ajax, Aspen Skiing Company proposes to build the long-dreamed of Pandora lift to the east of the current Gent’s Ridge lift while adding 148 acres of new terrain.  The 4,191-foot top drive detachable quad would likely meet the Forest and SkiCo’s shared goals of enhancing terrain variety, improving circulation and providing reliable and consistent snow coverage.

pandoraexpansionsatellite

Unlike many of its peers, only 37 percent of Aspen Mountain occupies National Forest lands while the other 63 percent is privately held.  The new lift would traverse some of each and move up to 2,000 skiers per hour to the summit.  Vertical rise would be 1,220′ compared with 1,079′ at the longer and flatter Gent’s Ridge.  Aspen Skiing Company also proposes to add 53 acres of snowmaking coverage on six existing trails nearby.  A 30 day public scoping period runs through June 15th and input is being accepted online.  Project engineer SE Group has prepared an interactive web app to assist the public and there will be an open house as Aspen’s Limelight hotel next Wednesday night.  Aspen Snowmass hopes to win approval around the new year and build as early as 2019.

Building a Better Lift One in Aspen

IMG_8222
The third time may be the charm as the Aspen community is set to weigh the future of the Shadow Mountain lift over the coming months.

Come November 6th, Aspen residents will vote for Governor, U.S. House, and likely whether a ski lift should return to the original base of Aspen Mountain.  SE Group and the City of Aspen today posted 61 pages of study on the new Lift One with a focus on where to site the bottom terminal, a question which has lingered since 1972.  Goals include retaining the historic structures of the first Lift One, threading the needle between two new developments, and improving skier flow.  An aggressive proposed timeline begins Tuesday with review by the City Council that could culminate with a new gondola-chair combination lift spinning by late 2019.  That would be 48 years after a shortened SLI-Riblet double dubbed 1A eliminated easy access for much of the town to Shadow Mountain.

img_8196
This is the primary lift for one of the few World Cup courses in America.

The current lift starts about four towers higher than the 1946 single chair did and, like its predecessor, has reached the end of its useful life following decades of service.  The International Ski Federation makes no secret the obsolete machine is a big reason why Aspen does not host World Cup skiing as often as some of its peers.

option1

But things are finally looking up – or actually down.  SE Group analyzed nine chondola, chairlift, surface lift and funicular options and ones dubbed Option 1 and Option 7 were identified for detailed study that commenced in February.  An A and B variation were added to alternative number 7, leaving four scenarios in play to bring the lift back into town.  Option 1, shown above, would put the bottom terminal level with Gilbert Street between the old Lift 1 terminal and the “new” one.  Because of space constraints with Aspen Skiing Company’s preferred Telemix (chondola in Poma parlance), the lift would likely be a straight gondola or possibly a detachable chairlift.  Skier access from above would be excellent but the public would have a 40-foot vertical climb to get to the load point from town.  Furthermore, the developer of the proposed Lift One Lodge would have to give up an entire building worth of units.  The historic lift terminal and remaining towers from the first Lift One could be retained, which is an important community objective.  This is deemed a viable, but not best option.

Continue reading

News Roundup: Last Call

  • No ticket, no card.  You can now ride lifts using only your phone at Sunshine Village.
  • Berkshire East owners buy Catamount with summer business and upgrading aging infrastructure on the agenda.
  • U.S. skier visits decline 2.8 percent for 2017-18 with the Midwest and Southeast up year-over-year, the Northeast flat and the Rockies, Pacific Northwest and Southwest regions down.
  • New lift construction is nonetheless pacing 25 percent ahead of last year and 43 points above this date in 2016.
  • Quebec area Val Neigette closes for good with its Doppelmayr quad chairlift headed to an unknown Ontario mountain to cover outstanding debt.
  • Mi Teleférico is apparently in talks to build dozens more urban gondolas in La Paz between 2020 and 2030.
  • The Balsams project faces a key state vote on May 21st.
  • Add Nashville to the list of US cities considering public transport gondolas.
  • Boyne Resorts closes on its purchase of seven mountain resorts, bringing its owned and operated portfolio to ten across North America.
  • Jackson, Wyoming stakeholders mostly agree to site a new gondola in a public park at the base of Snow King Mountain.
  • Loveland will hold a lottery for season passholders to win purchase rights for Lift 1 chairs.
  • The final last chair for the Norway lift at A-Basin is Sunday.

Two New Lifts Are Coming to Magic Mountain

They call it “the road less traveled,” a classic Vermont mountain situated about half way between Stratton and Okemo.  Now in its second year of new ownership, Magic Mountain has carved a successful niche offering top quality, affordable skiing despite a competitive landscape.  Ski Magic LLC added a new carpet lift and restarted work on a new double chair to service intermediate terrain soon after taking over operations in late 2016.  Fresh off a successful 2017-18 season with increased skier visits, investors plan to spend an impressive $1.6 million on key infrastructure this summer including two important new chairlifts.

In addition to completing the Green Chair project by early summer, Magic announced today that a Poma quad chair will replace the Black lift, which dates back to the middle of last century.  The 1962 Pohlig double was once converted to a triple with Yan chairs before being turned back into a double in recent years.  Today it sports towers from Pohlig, Hall and possibly Poma and the time has finally come to retire it.

The new Black Line quad is a 1986 Poma Alpha model which is being removed from Stratton this month to make way for the Snow Bowl ExpressThe predecessor will find a new home less than 15 miles away, becoming the workhorse base-to-summit machine at Magic.  The incoming Green Chair is also from Stratton, a Borvig removed in 1995 called Betwixed.  “When we heard Stratton was replacing their Snow Bowl lift with a new high-speed detachable, four-passenger lift, our investor group jumped on the opportunity to try and purchase their Poma fixed-grip quad”, said Geoff Hatheway, President of Ski Magic. “For our ski community, this lift is a huge upgrade that meets and manages our current and future growth expectations, better fulfills customer desires for quality, reliable lift service at Magic, and sustains our reputation as an area with both minimal lift lines and low on-slope skier density.”  He went on to thank Stratton President and COO Bill Nupp for his help securing the lift’s future in Southern Vermont.

8d4d8a_cb60e03522b14c839faf26f3c12c7600_mv2_d_5000_3618_s_4_2

Black Line capacity will more than triple from 620 skiers per hour to 2,000 with the new lift unloading slightly higher to service all of Magic’s trails.  The 148 chair lift will be over 5,000 feet long with approximately 1,500 feet of vertical rise.  Magic’s 1971 Heron-Poma double will stay in the rotation and operate at peak times, meaning the Black quad, Red double, and Green double are all slated for service in the 2018/19 season.  With Magic’s plans, at least seven new lifts will debut in Vermont next season, the most since 1995.

Double Turnarounds! Disney Skyliner Advances

Three of the highest capacity lifts America has ever seen continue to take shape this spring at Walt Disney World in preparation for a 2019 opening.  With steel coming together for the first two megastations announced almost a year ago, the Hollywood Studios gondola seems on track to be completed first.

To keep things consistent, I’ll start this month’s update at Epcot, where the longest of three Disney World lifts will terminate.  This zigzagging line will feature two intermediate stations between Epcot’s International Gateway and the south end of the Caribbean Beach Resort.  Foundation work is in progress at all four stations and the second to last tower (number 25 I think) was recently set near the park entrance.  You can see in the bottom left of the above photo that it might be finished in a green shade to blend into its surroundings.

More towers are either standing or soon will be between Epcot and the first turn station near the parking lot for Disney’s BoardWalk Inn.  This section appears to have around seven towers total.  The ride will be very cool with one water crossing, a forest section and Eiffel Tower views.

Continue reading

News Roundup: One Billion

  • Despite competition from the Ikon and Epic passes, Peak Resorts reports sales of its Peak Passes are up 14 percent year over year through 4/30.
  • HTI, the parent company of Leitner, Poma, Aguido, MiniMetro, Prinoth and more reports it built 75 ropeways in 2017 and exceeded $1 billion in revenue.
  • The Hermitage Club opposes its primary lender’s motion to appoint a receiver and says it has found a financial firm willing to loan $26 million in restructuring capital.  A key court hearing is scheduled for one week from today.
  • TransLink’s ten year, $8.8 billion vision includes funding for Burnaby Mountain Gondola planning.
  • Gondola fever spreads in Edmonton.
  • A gondola is being looked at for Idaho Springs, Colorado along I-70.
  • SE Group and the White River National Forest test an interactive storyboard as a public engagement tool for Beaver Creek’s McCoy Park Expansion.  Comments are due May 29th and a decision is expected in September.
  • The Forest Service proposes quickly approving the replacement of Arizona Snowbowl’s Agassiz triple with a 6,100 foot combination lift utilizing gondola cabins between every three or four chairs.  Capacity would be only 1,200 passengers per hour.
  • Magic Mountain commits to finishing the Green lift and weighs the future of its nearby Pohlig-Hall-Yan contraption.

California Express Draft Environmental Impact Statement Released

Web-Header-CA Express

A 16 minute flight between Squaw Valley and Alpine Meadows took a jump forward this morning as the Truckee National Forest and Placer County released the draft environmental impact statement for the California Express gondola.  The big three stage lift was first proposed by the owner of both mountains, KSL Capital Partners, more than two years ago and is now being championed by Alterra Mountain Co.  At 808 pages, the EIS required under the National Environmental Policy Act outlines three possible alignments which could unite the steeps and village at Squaw Valley with the beginner and intermediate paradise of Alpine Meadows.

Two of the alternatives are new while the other two should be familiar to readers of this site.  Other concepts such as a pulse gondola, expanded shuttle service and even an underground train were eliminated as part of the preliminary review, which was completed by SE Group and Ascent Environmental of Sacramento.  Alternative 1 is the required no-action option, which would keep Squaw Valley and Alpine Meadows separate but equal.  Shuttle buses would continue running every 30 minutes between the two mountains, which already share a common lift ticket.

californiaexpressalternatives

The lift would move 1,400 skiers per hour in 8-passenger cabins painted white to blend in with the winter environment.  It would operate from 8:00 am to 6:00 pm with skiing allowed from the mid-station(s) when conditions permit.  There would be separate drive systems and separate cabin parking facilities at each end so two sides could operate independently.  The middle section of the lift would operate as part of the Alpine Meadows side and approximately 40 percent of the cabins would be stored at Squaw Valley with the remaining 60 percent at Alpine during storm events and the summer.

Continue reading