- Arizona Snowbowl files paperwork with the Coconino National Forest to replace the Agassiz lift with a combination Telemix/chondola as soon as this summer.
- Bromont in Quebec looks to build a Doppelmayr six place chair in place of its 1985 vintage detachable.
- It’s not every day you read about lifties being caught in an avalanche at the bottom of a high-speed quad. Thankfully no one was injured.
- I’m thinking President Trump’s 25 percent tariff on imported steel (and 10 percent for aluminum) will have negative implications for the ski lift business, though Mexico and Canada are exempted for now.
- Doppelmayr Canada seeks an experienced construction manager for its four lift megaproject at Whistler Blackcomb.
- Triple double Massachusetts mountain Bousquet is on the block.
- Tenney Mountain opened for skiing yesterday for the first time in eight years.
- When a T-Bar turns into a chairlift…
- Doppelmayr pitches a 3S gondola to connect Oakland with Alameda Island in San Francisco Bay.
- Antelope Butte’s two Riblets will see significant work this summer in advance of a possible reopening.
- Another viral video shows a child falling from a lift at Bear Mountain.
- Edmonton gondola idea wins a design competition, beating hundreds of other entries.
- New owner of Mt. Norquay eyes building a gondola from Banff for improved access.
- Vail Resorts posts strong second quarter results with net income up 58 percent and lift revenue up 6.6 percent despite skier visits dropping 4.9 percent. In addition, Vail is raising its corporate minimum wage to $12.25.
- Doppelmayr proclaims Big Sky’s upcoming 8-seater the most technologically advanced lift the company has ever delivered.
Tenney Mountain
News Roundup: Eco-Friendly
- Leitner-Poma flies concrete for Loveland’s new Ptarmigan lift, a triple which will replace two lifts in a new alignment.
- Aerospace Engineer Michael Bouchard is determined to reopen Tenney Mountain after five seasons being closed.
- Season pass sales have been suspended at the troubled Magic Mountain in Londonderry, Vermont. The classic New England ski resort is down to two working chair lifts (in 1990 it had five.)
- Poma has a new brochure about its urban lift projects.
- Mt. Rose is relocating the Ponderosa quad (1993 Garaventa CTEC) to become the Wizard beginner lift. It also looks like their James Niehues trail map is out and a Gary Milliken VistaMap is in.
- One of Garaventa’s retired engineers has written an 834-page book called Ropeway Technology. It can be yours for only 125 Swiss Francs (plus $32 for shipping to the USA.)
- Sugarloaf pours foundations for their new terminal on an old lift.
News Roundup: Fire Season

- The North Resort at Mountain High narrowly escapes one of California’s many wildfires burning out of control.
- Leitner-Poma is about to start 3 1/2 months of construction at Sipapu, New Mexico.
- Next season will not happen at Saddleback, Maine unless the resort can secure $3 million for a new quad lift in the next two weeks. Or so they say.
- In central New Hampshire, Waterville Valley continues clearing for the Green Peak expansion while Tenney Mountain prepares to reopen after a decade being closed.
- Sugarloaf launches their lift safety website that appears it took an intern half an hour to make.
- Leitner gets into the surfing business with DirectDrive.
- Poma’s 2014 Reference Book is now online. Better late than never!
- Snow King Mountain’s very wealthy investors announce phase 2 expansion with a base-to-summit gondola and major skiing expansion.

News Roundup: Small Mountains and Big Cities

- Construction on The Balsams Resort in New Hampshire may begin late this summer. We could see new lifts there next summer.
- A bit further south, Waterville Valley started cutting trees for its Green Peak Expansion. Unfortunately they don’t have funding for a new lift or even a used one.
- Also in New Hampshire, Tenney Mountain plans to reopen next season after being closed since 2010. The mountain has a 1964 Stadeli double and 1987 Borvig triple
- You can own one of Oregon’s ski areas for only $1.25 million. Includes lifts with charming names like “Happy” and “Echo.”
- The Harbour Skylink would be a four-stage gondola in one of the world’s great capitals.
- Poma is currently building five gondolas in Latin America, two for the Metrocable system in Medellin, Colombia and one each in Bolivia, Chile and Mexico. They recently received €1.3 million from the French government to lead a consortium promoting ropeway transportation in cities.
- The world’s tallest observation tower is coming to Brighton, England, courtesy of Poma, who also brought us the London Eye and the High Roller in Las Vegas.
- Sigma takes on CWA with 3S gondola cabins developed by Italian car designer Pininfarina, set to debut in 2018 on the world’s highest 3S in Zermatt.
