
New York’s state-owned Olympic Regional Development Authority plans to spend a whopping $147 million to upgrade its facilities during 2020 and 2021. Those venues include Belleayre, Gore Mountain, the Olympic Ski Jumping Complex and Whiteface, which together saw three new lifts over the last three years. On Friday, the agency issued a formal request for proposal for three more fixed-grip quad chairlifts to be built over two years.
This summer, both Gore and Whiteface would see new lifts replacing Riblet models. Gore proposes replacing the Sunway double with a fixed quad capable of moving 2,400 guests per hour. The previous lift dates back to 1986. The new alignment would end slightly higher than the current lift, with a 566 foot vertical rise and 3,102 foot slope length. This machine would be bottom drive, bottom tension with a loading carpet.
Also in 2020, Whiteface plans to replace the Bunny Hutch triple with a quad. The current lift opened in 1997 with used Riblet equipment. The new lift would be about 450 feet longer with a vertical rise of 364 feet. This quad would also be bottom drive/bottom tension and may include a loading conveyor.
Following in 2021, Gore would see a replacement for the High Peaks double. The existing lift is a quirky Riblet-CTEC hybrid that experiences long lines during peak times. The new lift would be a bottom drive fixed-grip quad with a design capacity of 2,400 skiers per hour.
No new lifts are planned for Belleayre, understandable considering the Catskills mountain got two of the last three projects. There’s no guarantee ORDA will follow through on these specific plans but the RFP gives us a pretty good idea of the authority’s wish list. Potential suppliers have until March 5th to bid and, if funded and approved, construction would be complete by November 15th of 2020 and 2021.








