- An avalanche hits the top of Swift Current 6 pre-opening, resulting in the rope evacuation of seven staff members and damaging several chairs.
- An empty chair falls from Mt. Bohemia’s Riblet double.
- Diamond Peak provides a primer on how lifts are de-iced of rime.
- A guest is injured falling from the new Coach chair at Bogus Basin, Idaho.
- Ditto for a lift at Mt. Holly, Michigan.
- Telluride-area residents seek to have the new gondola election results thrown out.
- British Columbia sues the operator of closed Tabor Mountain, seeks a new operator.
- New Hampshire provides an investigation update on the Attitash chair detachment, Flying Bear to remain closed.
- Wolf Creek forges on independently – selling reasonable walk up tickets, partnering with only one other mountain and building lifts in house.
- Cannon Mountain rope evacuates the Peabody Express due to a bolt failure.
- Pacific Group Resorts transitions from an operating lease to controlling owner of Powderhorn.
- Leitner-Poma is selected to build a new chairlift at Spirit Mountain, Minnesota.
- Middlebury Snowbowl opens Bailey Falls for the first time in two years.
- Whistler Blackcomb nears reopening the Glacier Express after a two week repair.
- Katharina Schmitz to depart as CEO of Doppelmayr USA, be succeeded by current VP, Operations Keith Johns.
Mt. Bohemia
News Roundup: Last Journey
- Indy Pass adds Ragged Mountain, NH; Middlebury Snowbowl, VT; Camden Snowbowl, ME; Mt. Abram, ME; Hatley Pointe, NC and Cape Smokey, NS to its roster.
- The public operator of Belleayre, Gore Mountain and Whiteface reports an annual operating loss in excess of $47 million, not including approximately $80 million in capital spending.
- Grouse Mountain’s only current means of access breaks down, closing the mountain for most of the Canada Day long weekend.
- Five people remain hospitalized from last week’s deadly gondola incident in Colombia, the investigation is focused on an issue with one cabin rather than the entire system.
- The Dodgers Stadium gondola in Los Angeles eyes a 2028 opening.
- Brian Head proposes adding 1,570 acres to its permit area.
- A confirmed Six Shooter sighting near Sugarloaf.
- A woman is killed in Italy falling from a material cableway not designed for people.
- Mt. Bohemia reopens its triple chair with a new Skytrac return terminal.
Mount Bohemia to Replace Frontside Lift
Skytrac will build the first truly new lift at Mount Bohemia over the next three years, replacing a used Riblet triple built in 2000. Bohemia announced a new drive terminal will be installed next summer, a top return terminal in 2024 and new towers and triple chairs will follow in 2025. The phased lift replacement will spread the capital cost of the project out over multiple seasons and bring Bohemia into the era of modern lifts.
“These build outs have been done by Skytrac all over the country,” said Mount Bohemia, using the above example of a Skytrac Monarch drive terminal retrofitted on a 1961 Riblet double at Mt. Spokane, Washington. “In a very short time Bohemia will have a completely brand new triple chairlift that will increase uphill capacity by roughly 50 percent. It will reduce our maintenance season on the new lift to four weeks allowing us to run the new chairlift for scenic lift rides all summer and fall.”


