- Telluride plans to reopen Lift 1 Monday with non-union workers.
- Here’s some detailed on the ground reporting from the Telluride strike.
- Le Massif, Quebec also shuts down completely due to a strike.
- Mountain High, California temporarily closes due to rain damage.
- Mt. Waterman’s Chair 1 sustains severe damage from the same storm.
- Marquette Mountain, Michigan’s Rocket chair will miss this season due to a gearbox issue.
- Boyne Mountain, Michigan rope evacuates Disciples 8.
- Trollhaugen, Wisconsin rope evacs Chair 4.
- Sasquatch Mountain, BC’s Sasquatch chair remains out of service.
- Black Mountain, New Hampshire loses its only two chairlifts over the holiday period; both are now back in action.
- Mont Farlagne, New Brunswick loses its only chairlift to a gearbox issue, considers buying a T-Bar for future redundancy.
- Burke Mountain’s 1965 J-Bar is back after missing a season.
- Norway Mountain, Michigan revives the Thor double after many years inoperable.
- Asessippi, Manitoba notes several carriers are unusable on the Porcupine triple but the lift will continue to run.
- Seven people are injured in Italy when an aerial tram fails to slow down properly when docking.
- A child dies after becoming entangled in a conveyor lift in Japan.
- A woman is uninjured after dangling upside down from the doors of a gondola cabin at Park City (video).
- Mount Snow shutters Ego Alley and Seasons for different reasons.
- The latest court filing over a delayed lift project at Bluewood, Washington alleges Steelhead Systems’ “experience in the sale and delivery of used chairlifts” has “been marred by disappointing results, delays and unexplained cost overruns.”
Ropera
News Roundup: Ropera
- Deer Valley updates its expansion site to show Lift 6 as two detachable quads (6A and 6B) instead of a six pack with mid-station.
- Vail Mountain seeks permission to replace Orient Express #21 with a six pack, swap Little Eagle #15 for a detachable quad and remove Wapiti #24.
- Leitner-Poma discusses the impact of tariffs on the SAM huddle.
- Burke Mountain emerges from nine years of government receivership with new owners.
- Mount Saint Louis-Moonstone, Ontario teases a new era coming to the Outback side of the mountain.
- Leitner introduces its next generation monocable detachable called Ropera, combining technology from Leitner, Poma and Bartholet. The launch customer will be Speikboden, Italy with a six place chairlift.
- Leitner and Doppelmayr release annual yearbooks.
- Snoqualmie unveils new renderings of the Edelweiss project at Alpental.
- A Colorado man succumbs to injuries sustained in a fall from Keystone’s Ruby Express last December.
- Powder Mountain tells the Utah tram board it’ll install between one and four new lifts this summer.
- A jury declines to award millions to a Mt. Bachelor skier who fell getting off a chairlift.
- Killington to donate and match proceeds from closing day to Whaleback Mountain’s chairlift replacement fund.
- Snow Partners to launch a new multi-mountain pass product offering three total days at six to ten Eastern resorts.
- Mt. Ashland, Oregon looks to replace the Ariel and Windsor doubles with Skytrac triple chairs in 2026.
