- MND raises more money to continue growth plans.
- Palisades Tahoe opens Red Dog, Mount Baldy, Ontario opens the chairlift it worked years to build.
- Vail aims to open Sun Down Express this weekend.
- Sunnyside at Alta will open tomorrow, two months late.
- Cascade Mountain’s delayed lift also spins tomorrow.
- Granite Gorge, New Hampshire reopens after a multi-year closure.
- Loup Loup temporarily closes its lone chairlift to remove hazard trees identified by the Forest Service.
- Children are injured falling from lifts at Boyne Mountain, Bristol Mountain and Mt. Snow.
- Vail Resorts reports a 12.5 percent increase in skier visits but cautions extreme weather and airline disruptions hurt holiday performance.
- Unionized lift mechanics at Park City prepare to negotiate their first contract with Vail Resorts.
- Whitewater’s Silver King lift will be down for up to a month.
- Crystal Mountain, Michigan’s main lift to be down all weekend.
Boyne Mountain
Boyne Mountain to Replace Boyneland and Superbowl Lifts
Even before the first eight place chairlift in the Midwest carries skiers up Boyne Mountain this month, two more lift projects are in the works. Next summer, Doppelmayr will replace both Boyneland and Superbowl, lifts which date back to 1995 and 1987, respectively. Boyneland will go from a fixed triple to a fixed quad and Superbowl from a fixed quad to a fixed triple.

The realigned Boyneland will load closer to the Mountain Express base area and become the gateway to family-friendly Disciples Ridge terrain. A height-adjustable loading conveyor will allow the replacement lift to operate twice as fast as the existing Borvig with a ride time of just four minutes.
Expert-focused Superbowl on the mountain’s south side will debut the fastest fixed grip chairlift in the Midwest. The new triple chair will spin at 2.5 meters per second or 492 feet per minute. Superbowl will also sport a loading carpet and the bottom terminal will shift downward to provide easier loading access. Additional space at the top will create an improved unloading experience.
Lifts are a major part of Renaissance 2030, an aggressive ten year capital improvement plan at Boyne Mountain. “These new lifts bring the latest in technology to Boyne Mountain and provide our guests with the absolute best skiing and riding experience in the Midwest,” said Jason Perl, general manager of Boyne Mountain Resort. “Better, faster lifts mean more time on the slopes, enjoying the exhilaration of the sports, and time with family and friends.” Both new lifts are expected to be complete in advance of the 2023-24 ski season.
Boyne Resorts now plans to build at least seven new lifts next year between Big Sky, Boyne Mountain, The Highlands, Loon Mountain, Sunday River and Sugarloaf. Projects run the gamut from fixed grip chairlifts at Boyne Mountain and Loon to a bubble six place at The Highlands and the all-new Big Sky tram.
News Roundup: Dueling Passes
- Sun Peaks joins the Ikon Pass.
- Alterra settles multiple class action lawsuits over 2020 Covid closures, offering credits toward future purchases.
- Vail Resorts and Telluride renew their multi-year Epic Pass partnership.
- Telluride aims to send a gondola replacement proposal to voters in 2024 and begin construction in 2028.
- Snowbird’s new red tram ships again from Switzerland.
- A group continues efforts to save the Tulsa State Fair Skyride.
- Cuchara remains on track to reopen one of its Riblet chairlifts this winter and is still seeking donations.
- An awesome one hour documentary chronicles the history of Riblet Tramway Company.
- There’s also a new book about Byron Riblet.
- The Salt Lake County Council narrowly passes a non-binding resolution against a Little Cottonwood gondola.
- A Hall double goes up for sale in Connecticut, likely from the closed Woodbury Ski Area.
- Analysis is complete on Lutsen Mountains’ expansion proposal and a new Forest Supervisor expects to make his decision public around the beginning of ski season.
- The head of Whistler Blackcomb offers more details on the decision to move forward Fitzsimmons and Jersey Cream projects with lifts from Park City.
- Cascade Mountain names its new quad chair in memory of two locals who died in a 2014 avalanche.
- The Sugarloaf 2030 timeline is updated to reflect Double Runner being replaced in 2023 or 2024.
News Roundup: Fresh Designs
- Poma introduces new station and tower elements in Europe with an eco-friendly focus.
- Doppelmayr now offers a third D-Line station design.
- Sugarbush proposes replacing Heaven’s Gate with a fixed grip quad.
- Chairs from Big Red and cabins from Creekside will be sold to benefit the Whistler Blackcomb Foundation.
- Doppelmayr to host the second annual Insights virtual event on May 4th.
- Ski Sawmill, Bluewood and Kelly Canyon become the latest resorts to sign on to the Indy Pass; Marmot Basin leaves after just one year.
- Snow King Mountain joins the Powder Alliance.
- Vail reports a season-to-date 12.5 percent increase in skier visits.
- A new Doppelmayr Wir is out with features on Big Sky and Loon Mountain.
- The first urban ropeway trade show will be held in June in Germany.
- Powder Ridge, Minnesota to sell chairs from a retired double chair.
- Two new lifts are approved for Park City.
- A May deadline looms for 100,000 Vail Resorts employees to join or opt out of a class action lawsuit regarding labor practices.
- Boyne Mountain will sell Disciples chairs on May 2nd to benefit a local charity.
- A public hearing is scheduled regarding the Moosehead Lake resort project.
- Eaglecrest staff visit the gondola they bought in Austria; all systems are go for bringing it to Alaska.
- Seventh Heaven at Stevens Pass closes for the season early for “maintenance/evaluation.”
- Icy Strait Point opens its big Mountain Top gondola for the first time.
News Roundup: Even Ten
- Boyne Resorts acquires its tenth ski area: Shawnee Peak, Maine.
- A new trail map shows Loon Mountain’s gondola is now called the White Mountain Express.
- A Bloomberg profile notes visitation has grown 46 percent in five years at Big Sky with major development to continue.
- Snow Partners becomes the new corporate umbrella for Mountain Creek, Big Snow American Dream, Snow Operating and more.
- A new model of the Sigma Diamond EVO cabin will debut first at Austria’s Kaunertaler Gletscher.
- Whiteface proposes a high speed quad with angle station from Bear Den to the new Legacy Lodge and may replace Little Whiteface and Mountain Run with a quad in 2022.
- Boyne Mountain General Manager Ed Grice takes a deep dive on six future lift projects.
- The new Cape Smokey gondola is carrying thousands of riders on peak fall days.
- A conveyor project is delayed a year due to components being stuck on a ship near the Port of Houston.
- Welch Village also says it’s waiting for parts of its new chairlift.
- Le Massif adds a Doppelmayr platter to service the new Club Med Québec-Charlevoix.
- Crystal Mountain President Frank DeBerry says replacing Rainier Express is a top priority. Alterra also wants to swap the Mt. Rainier Gondola for a higher capacity machine and turn the existing gondola into a base area-Campbell Basin link. Bullion Basin Express, an East Peak lift, Kelly’s Gap Express and Northway detachable all remain under consideration.
- Reader Austin S. sent in the below photos from Mt. Shasta, purported to be clearing for a new lift on Gray Butte.



Boyne Mountain to Launch Midwest’s First Eight Seat Chairlift

Boyne Resorts’ commitment to modernizing lift infrastructure across its properties will continue in 2022. The company today announced construction of Disciples 8, an eight place chairlift replacing Disciples Ridge and Disciples II at Boyne Mountain. The Doppelmayr D-Line system will feature a direct drive, auto locking safety bars and a loading conveyor, though no bubbles due to its 3.2 minute ride time. D8 will be Boyne Resorts’ third eight passenger chairlift following installations at Big Sky Resort in 2018 and Loon Mountain this year.
Boyne Mountain has been a center of lift innovation ever since it opened with the Midwest’s first chairlift in 1948. From there, Boyne introduced the world’s first quad in 1964 and installed America’s first high-speed six person chairlift in 1992. “Boyne Mountain started our company’s 75 year journey in the ski and resort business, and we are excited to again build on its incredible foundation of innovative industry firsts with the next generation of attractions and our heritage of elevating the Midwest resort experience,” said Stephen Kircher, CEO and president of Boyne Resorts. More information on other improvements announced today can be found here.
Future lift upgrades are planned for Meadows, Super Bowl, Victor, Boyneland and the Mountain Express, which will create the Midwest’s most advanced lift system.

Instagram Tuesday: Crafted
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Instagram Tuesday: Upward
Every Tuesday, I feature my favorite Instagram photos from around the lift world.