Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Author: Peter Landsman
High Speed Quad Coming to 49 Degrees North

The largest ski resort in the United States without a detachable lift is taking the plunge. 49 Degrees North today announced Doppelmayr will build a base to summit high speed quad chair this summer replacing the Bonanza #1 double. This transformative project will bring Washington’s second largest ski area into the 21st century. “An undertaking of this magnitude has been years in the making and we are excited to finally be able to share this news,” said Rick Brown, Director of Skier and Rider Services. “We want to thank our guests for their continued support and enthusiasm throughout the years and look forward to continuing to provide truly memorable mountain experiences for all.”
The detachable quad will span 6,644 feet, making it the longest chairlift in Washington State. It will rise approximately 1,850 vertical feet to Chewelah Peak with a ride time of just six and a half minutes. The yet-to-be-named lift will be installed with 900 horsepower, making it one of the largest projects in the country this year.
49 North’s new lift is expected to be completed in advance of the 2021/22 season, at which time Montana’s Discovery will become the largest US ski area without a high speed lift.
News Roundup: Exceptional Ride
- Blue Mountain provides younger guests with a two minute introduction to how lifts work.
- Soldier Mountain’s major midseason repair is a success.
- Whaleback gets its summit lift operational for the season after replacing bullwheel bearings.
- A crowdfunding campaign seeks to purchase Big Tupper out of foreclosure.
- Drone video shows the damage to Eaglecrest’s Ptarmigan chair (now back open).
- Two class action lawsuits proceed regarding gondola incidents at Mont-Sainte-Anne last winter.
- The girl who fell from a Sugarloaf chairlift last week makes the network morning show rounds.
- Another video shows a perfect catch of a six year old who fell from a Crested Butte triple chair.
- A boy is also uninjured after landing in a net at Diamond Peak.
- Utah legislators weigh funding a Little Cottonwood Canyon gondola amid a long list of wish list projects.
- Speaking of LCC, proponent Chris McCandless joins the Ski Utah podcast to talk gondolas.
- North America’s largest city looks to build a fourth urban gondola line in 2022.
- Bousquet Mountain debuts the Yellow triple following a delay due to six towers needing to be moved.
- Doppelmayr prepares to ship 80 containers worth of lift components from Austria to the White Mountains of New Hampshire.
- Italy’s ski reopening is postponed just hours before lifts were set to spin.
- In Wisconsin, a T-Bar ski area opens for the first time in 25 years.
- Aspen Skiing Company puts the Ajax Pandora’s expansion back on the front burner.
- The first riders ascend Mission Ridge on the Wenatchee Express.
- Developers at Moosehead Lake look for up to $135 million in financing.
- For the second time this winter, the Purgatory Express is down due to technical problems.
- Two more resorts get set to join the Indy Pass next week.
- The Forest Service seeks public comments on Arapahoe Basin’s proposal to replace Lenawee with a detachable quad or six pack in 2022.
- Snow Valley blogs about its lift history and claims the world’s fastest fixed grip quad.
- Magic Mountain provides the below update on progress towards opening a third chairlift.
On the Black Quad lift front, there always seems to be something. And, the engineering firm who designed the lift has come back with quite a few changes that need to be implemented by Pfister Mountain Services, including changing out some sheave assembly wheel combinations at a few towers and a major overhaul of tower 13 cross arm and uphill sheave assembly. None of this is a quick fix at this point in our construction phase and comes as unwelcome news. And, of course, tower 13 is in a very difficult spot to get to, especially for what equipment will be needed to execute the cross arm changes. No timetable or budget as been provided as of yet. We will continue to keep you posted as news warrants. Certainly frustrating after all this time as we’d like to see our money put to good use for you. All I can say is that the Quad will be a part of our future here at Magic so we can expand uphill capacity and lift redundancy as we grow.
Instagram Tuesday: First Light
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Chair Pileup Shutters Big Squaw
Multiple chairs slipped this afternoon at Maine’s Big Squaw Mountain, necessitating a rope evacuation of the Donaher triple. Pictures show at least three groups of chairs spaced at abnormal intervals on the light side of the lift. Sam Shirley was on the triple chair at the time and provided me with the below account and pictures.
“I was riding the triple at Big Squaw around 1:00 when I noticed chairs coming down which had slid into each other. About two minutes later, the lift stopped. We were told that there was a partial derailment on the downhill side near the summit (likely tower 9 or 10). I’m not sure what caused the chairs to slide into each other or why the lift didn’t stop immediately. Maybe they were catching in something or hitting a tower. Everyone was evacuated by rope within an hour and the staff did a great job. They had three different teams evacuating people. We were given vouchers to use later in the season.”
Sam Shirley
Donaher is a 1986 Borvig triple rising 587 vertical feet. An organization called Friends of Squaw Mountain operates the lift on a nonprofit basis. Back in 2004, another chair-slipping incident caused multiple injuries on the Thompson double. In that case, one of the chairs fell to the ground rather than remaining on the rope. The Stadeli-built lift never reopened but a Louisiana-based investor recently joined with a Maine developer in hopes of revitalizing the mountain with new lifts, a hotel and summer activities.
Thankfully there were no injuries reported today. It was only the mountain’s fourth day operating this season due to snow conditions and the lift opened later than normal because of cold temperatures. Big Squaw will remain closed at least through the holiday weekend.
News Roundup: So Close
- Soldier Mountain loses its only out of base lift for one weekend and possibly longer due to a mechanical issue.
- Grizzly at Montana Snowbowl gets rope evacuated following a power outage.
- Approaching a year without its gondola, Mont-Sainte-Anne says any new lift remains years away and the resort is not for sale.
- A unionization effort at Whistler Blackcomb suffers a setback.
- From Colorado to Ohio, Maine North Carolina and New Hampshire, skiing is booming.
- Green Mountain Valley School officially dedicates its new Leitner-Poma T-Bar.
- Most Ontario resorts are cleared to reopen.
- Searchmont won’t open this season but will complete an expansion for next winter.
- Italian ski resorts begin to reopen.
- With so many Colorado resort workers living in groups, communities consider whether to offer them vaccine priority.
- Showdown Montana passes from one generation to another.
- Yet another new haul rope arrives at the Sea to Sky Gondola.
- Tampa issues an RFP for a formal gondola study.
- A girl falls 20-25 feet from Snubber at Sugarloaf.
- Canada will invest billions per year on transit which could jump start the Burnaby Mountain 3S project.
- Steamboat announces what will replace the existing village gondola station.
- Chair 8 reopens at Dodge Ridge, one month after a crazy wind storm damaged it.
- The City of Edmonton recommends planning continues for a five station urban gondola.
- More than 50 entities formally oppose the Forest Service’s planned approval of the Snow King Mountain gondola and expansion.
- Arapahoe Basin looks to replace the Lenawee Mountain triple.
- Eaglecrest’s Ptarmigan chairlift is closed indefinitely after two chairs become caught in a tower on startup.
Instagram Tuesday: Quad Knob
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
News Roundup: Middle of Winter
- Blue Hills reopens following inspections and a meeting of the Massachusetts Recreational Tramway Board.
- A Swiss study finds the risk of catching the coronavirus on a 12 minute gondola ride with windows open is a thousand times less than at an indoor meal with eight people.
- Saddleback teases another new lift coming next winter.
- This will be cool: a gondola which loads over water.
- Idaho’s Soldier Mountain and Pomerelle both join the Indy Pass.
- A hotel management company takes over operation of King Pine Ski Area.
- Japan’s first urban gondola opens April 22nd.
- Atlantic Canada’s only gondola remains on track to launch in July.
- Doppelmayr USA is hiring construction team members for multiple roles.
- Doppelmayr is also looking for an Electrical Panel Production and Install Technician.
- Sugarbush shows from the air how lift lines this season are shorter than they appear.
- Take a drone flight over a deserted Blue Mountain, Ontario.
- This month’s Smithsonian Magazine features the story of James Curran, the non-skier who invented the chairlift.
- With Black Line under construction and the Red Chair out of service, Magic Mountain is left without summit access for at least a few days.
- Attorneys for families of two skiers killed on Colorado lifts want the state’s Supreme Court to overturn a recent lower court ruling limiting resort liability.
- With minimal skier compaction, some French lifts are getting hit by avalanches.
Instagram Tuesday: Six More Weeks
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Trollhaugen Announces Lift Replacement & Terrain Expansion
Wisconsin’s Trollhaugen was the first resort in the nation to open a chairlift for skiing and riding this season and has been busy ever since. “This season has sparked an interest in snowsports and outdoor winter recreation like we’ve never seen in our 70 year history,” notes the ski area, which caters mostly to the Minneapolis market. “Our mission has always been to continuously reinvest in your experience while remaining true to the Mom & Pop Midwest Ski Area vibe that makes Trollhaugen feel like home to so many of you. To make the most of this unprecedented season, we will be embarking on a 3-Phase, multi year terrain expansion project this summer to better service our skiers and snowboarders of every ability level.”
A brand new Partek quad chair will replace Chair 1 this summer, boosting uphill capacity on the east side of the mountain by 33 percent. The following year, three new trails will be finished on the east side of the mountain, complete with snowmaking and night lighting. A triple chair is tentatively planned to be installed in 2023 to service the new terrain.
The quad is the first complete lift contract for New York-based Partek in two years. The firm typically builds a lift or two each year in addition to supporting hundreds of Borvig and Partek lifts in operation. With today’s announcement, at least four different lift manufacturers have confirmed installation projects in the United States for 2021.




