Every Tuesday, I feature my favorite Instagram photos from around the lift world.
https://www.instagram.com/p/B220keslhpI/
https://www.instagram.com/p/B27dxnHFcix/
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
https://www.instagram.com/p/B220keslhpI/
https://www.instagram.com/p/B27dxnHFcix/
An in-station collision on the Epcot line of the Disney Skyliner caused a stop that left people stuck in gondolas for more than two hours Saturday night and led to a partial evacuation.
https://twitter.com/RedChaos217/status/1180650096234565633
The first tweet about the situation at Walt Disney World Resort appeared at 8:43 pm eastern time, followed by pictures of stacked cabins in one of the outgoing sections of the Riviera Resort angle station. Riviera is the second of four stations on the longest Skyliner line, which links Disney’s Caribbean Beach Resort to Epcot’s International Gateway.
https://twitter.com/galxty/status/1180653572045905921
The unfortunate incident happened just a week after the gondola system opened to the public. Crews practiced repeatedly in the months prior to launch for such a scenario. Each cabin is equipped with two way communications, emergency supplies and water.
As of 9:30, Reedy Creek Fire Department trucks and specialized lifts were being used to evacuate people from a few cabins. The Epcot line passes over a narrow body of water plus multiple roads and buildings, necessitating a variety of rescue equipment. The shorter Hollywood Studios and Pop Century/Art of Animation lines were unaffected but unloaded as a precaution.

The Interstate 93 corridor in New Hampshire could soon be a hotbed of lift construction. Four exciting projects appeared on the White Mountain National Forest proposed actions page this week. In what would be a major move, Loon Mountain is seeking to replace the Kancamagus detachable quad with an eight seater chairlift. Next, the Seven Brothers triple would be replaced with a detachable quad, presumably utilizing equipment removed from the Kanc. This project would be similar to one Loon’s owner Boyne Resorts completed last year at Big Sky. There, the Ramcharger detachable quad was replaced by North America’s first eight passenger chairlift and the old machine moved to replace a Heron-Poma double.

Just to the south at Waterville Valley, the White Peaks Express is proposed to be replaced by a six passenger detachable lift. The current machine was built in 1988 and shortened to its current length in 1996. In a second project, the Sunnyside triple would be swapped for a fixed-grip quad and the Northside double removed. Both of these lifts were built decades ago by Stadeli. Waterville Valley has been independently owned and operated by a local group of investors since 2010. They recently replaced another aging Stadeli lift with an LST T-Bar.

It is unknown whether any of these new lifts will feature bubbles and/or heated seats, which have become popular across New England. The Forest Service expects to make decisions on whether to approve the projects in December.

When the family that operates Timberline Lodge & Ski Area bought nearby Summit Ski Area last year, an interconnect immediately entered the realm of possibility. The Forest Service recently accepted RLK and Company’s new Summit Master Development Plan, which includes a 10 passenger gondola from the Summit base area in Government Camp to historic Timberline Lodge. The combined resort would feature a vertical drop exceeding 4,500 feet, longest in the United States with all lifts open.
A Timberline Gondola would span 12,952 feet with a vertical ascent of 1,890′. It would require a boundary expansion of 228 acres between the top of Summit’s Homestead double chair and the bottom of Timberline’s Jeff Flood Express. Importantly, the Summit base area would become a transit and parking hub for both mountains, reducing congestion and parking demands at higher elevations. An approximately 30,000 square foot base lodge would replace the existing one at Summit. Guests from Portland would save almost 12 miles of driving each day, instead enjoying an 11 minute flight from Government Camp to the base of Timberline’s Magic Mile quad. “The gondola would not only provide direct, aerial access to Timberline from the Summit’s base area, for both guests and employees, it would also alleviate the congestion on Oregon Highway 173 and re-prioritize the need for additional parking at the bottom of Timberline’s Molly’s Chairlift,” notes the master plan, which was prepared by SE Group. The gondola would travel up to 1,200 feet per minute with a capacity of 2,400 passengers per hour in each direction. It would operate approximately nine hours per day in both winter and summer, serving skiers, snowboarders, sightseers and mountain bikers.
Additionally, the plan prescribes replacing Summit’s 1980 Riblet double with a fixed grip quad called Summit Pass. This lift would parallel the gondola for 1,933 feet and terminate at 4,290 feet in elevation. “By upgrading the existing chairlift conveyance, the overall guest experience would improve by having updated lift technology, allowing ski school and parties of four or less to ride the chairlift together,” the plan notes. Capacity would increase from 1,200 per hour to 2,000. A new carpet lift would also be installed.
The Forest Service’s acceptance of the master plan does not constitute approval of individual projects and, if approved, gondola construction is likely still years away. Timberline’s immediate next lift project is set to be a detachable replacement for Pucci, benefiting beginner and intermediate skiers. The gondola link would be even more impactful with major environmental and guest service benefits year round.
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Nearly 300 gondolas joined the transport fleet at the world’s most visited resort this morning, commencing an exciting new era for the U.S. ropeway scene. The milestone comes more than two years since construction began and almost 50 years from when a simpler VonRoll gondola system first opened at Walt Disney World Resort.
Crews fired up all three Skyliner lines pre-dawn, giving guests their first opportunities to skip bus rides and explore multiple parks in one day. Connecting Epcot and Hollywood Studios with four resort hotels, the system is sure to become among the most-ridden gondolas in the world.
This is the second D-Line detachable system from Doppelmayr to open in the Americas following Big Sky Resort’s Ramcharger 8 launch last December. Although the Austrian builder maintains a strong presence as maintenance contractor for the Skyliner, you won’t find the Doppelmayr name and logo prominently displayed here.
The cabins are highly customized CWA Omega IV models seating up to ten passengers. About half of them feature wraps with characters from Disney, Pixar and Marvel movie franchises.
Every Tuesday, I feature my favorite Instagram photos from around the lift world.