Snoqualmie Announces Holiday Quad Project

IMG_3961
This 1975 double at Summit Central is being retired in favor of a modern quad chair.

The Summit at Snoqualmie, operated by Boyne Resorts, is getting in on the new lift action.  One of eleven Riblets still operating at Washington’s most-visited resort will be replaced with a fixed grip quad over the summer.  The Holiday Quad will feature a height adjustable loading carpet and more than double hourly capacity on this section of Summit Central, which caters to beginners.  The 1,380 foot lift will rise 260 feet at a maximum speed of 450 feet per minute.  The most recent Summit master plan contemplated removing the Gallery lift alongside this project.

Trail Map inside

Notably, of the more than 35 chairlifts built at Snoqualmie over the decades, Holiday will be the first supplied by Doppelmayr.  “Going from a two-person to four-person chair and adding the easy loading conveyor will be a true game changer for Summit Central, particularly for our first-timers and kids,” stated Guy Lawrence, President & General Manager at The Summit in an online announcement.  Construction will begin in June and wrap up prior to the 2019-20 season.

News Roundup: Lots of Euros

Sugar Mountain’s Second Detachable to Enhance Beginner Experience

Fifty years after its trusty beginner chairlift opened, Sugar Mountain says the Brown Hall double has carried its last skiers and snowboarders.  Next winter, a Doppelmayr detachable quad chair will run up the Easy Street slope, more than doubling uphill capacity to 2,400 people per hour.  The new lift, tentatively dubbed the Silver Bullet, will also improve ride time from more than six minutes to two and a half while making loading and unloading more comfortable.

slopes

“Replacing the original Easy Street lift is not just an upgrade, it is example of the continued commitment to offering our guests an exceptional mountain experience,” said Sugar Mountain Resort owner Gunther Jochl in a statement.  “The majority of our guests are beginners who go on to develop skiing and snowboarding as a life-long, family activity.  Generation after generation lays roots right here on our beginner terrain.  This hasn’t changed in Sugar’s fifty year history.”  Sugar Mountain launched its first high speed lift, the Summit Express six pack, in 2015.

News Roundup: Heating Up

Brian Head Announces Navajo Express

ReeceBHRTrailMapFinalFINAL-2018-19-Marks-Bleed

The two longest chairlifts at Brian Head Resort will both be detachable quads by next season.  The Navajo triple chair will be retired this spring and replaced over the summer, enhancing beginner and family options at one of Utah’s highest elevation resorts.  The move comes five years after the installation of Brian Head’s first detachable lift, the Giant Steps Express.

img_5369

Lift Engineering constructed the current Navajo lift in 1980 to service almost exclusively beginner terrain.  The existing lift runs 3,900 feet and rises 620 vertical feet over nine minutes.  Brian Head lift maintenance is selling components from it including towers, sheave assemblies, pneumatic emergency and service brakes, grips and chairs.

The new lift will be built by Doppelmayr USA.

News Roundup: A Long Time Coming

Red Mountain Details Upcoming Topping Expansion

closeup

Western Canada’s oldest ski resort will continue to expand next summer with the addition of a new triple chairlift.  Red Mountain, situated along British Columbia’s famed Powder Highway, says the long sought Topping lift and terrain will debut for the 2019/20 season and bring the resort to 3,840 acres.  “This new triple chair is exciting on its own,” said Red CEO Howard Katkov in a statement. “But what’s truly exciting is how the Topping Chair continues our dedication to improving the adventure for our guests.  This new chair streamlines skier traffic around the resort beautifully.”  Guests will now be able to access Grey Mountain (opened in 2013) from the Silverlode lift (opened 2007) without needing to ride the extremely long Motherlode chair.  The 300 acre boundary expansion will also include six new intermediate trails approaching 1,000 vertical feet apiece.

IMG_1128
The new chairlift seen operating last winter at Big White.

The Mueller lift was purchased last year from Big White, where it operated for four decades as the Powder chair.  At Red, Topping will join an all fixed grip fleet of lifts built by Mueller, Doppelmayr, Poma, Lift Engineering and Thiokol.  With the confirmation of Red’s project, ski resorts across British Columbia have now committed to add at least four new lifts in 2019, more than any other Canadian province thus far.