Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Author: Peter Landsman
21 Rescued From Sandia Peak Tramway
The new year started with a long, cold night for a group of Sandia Peak employees. Late on New Year’s Eve, the resort’s aerial tramway stopped midway through a trip due to icing of cables from precipitation and high winds. Twenty passengers in cabin 2 and an attendant in cabin 1 were stuck until early this afternoon. The tram cars are not heated but rescuers were able to climb tower 2 and provide one of the cabins with food, water and emergency blankets. By 2:00 pm, a number of passengers had been lowered down from that cabin and taken off the mountain by helicopter.
The other cabin was not at a tower and the lone occupant took longer to rescue. “We are happy to report that at this time all people needing rescue from the Tram cars have been rescued and are safely at base,” the Bernalillo County Fire Department tweeted just before 4:00 pm. “We still have rescue personnel on the mountain who are hiking out due to difficulty in making access with the helicopter.” Much of the rescue operation was broadcast live on Facebook by the Bernalillo County Sheriff’s Office.
The tram was built by Bell in 1965 and is the fourth longest ropeway in North America. It travels over extremely rugged terrain with no road access for most of its length. The system also stranded riders for a number of hours in August 2020 and dozens of people spent more than 24 hours on the tram in a 1973 mishap.
The ski area, tramway and restaurant announced will remain closed at least until Monday.
Celebrating a Year of Resilience
As clocks roll over to 2022, 42 new lifts stand tall across North America. Lift manufacturer and resort employees accomplished a lot – operating through the pandemic and adding 13 more lifts than the year before despite supply chain bottlenecks and record low unemployment. Nearly all pandemic-postponed projects from 2020 were completed thanks to skiers, mountain bikers and sightseers flocking outside this year.
The 2021 lift class ranges from used T-Bars to the East’s first eight place chairlift and three new gondolas. Vail Resorts purchased the most new lifts of any single customer with seven projects across five mountains. Okemo moved a bubble detachable quad from Jackson Gore to the summit and added a six pack in its place. At Beaver Creek, a high alpine expansion will soon debut with two new quad chairs. Just as Vail’s construction projects entered the home stretch in September, the company shocked the industry and announced 19 new lifts would be built across its network in 2022. That number grew even further this month with the addition of two more projects in Pennsylvania as part of the Epic Lift Upgrade.
Boyne Resorts moved forward with two signature Doppelmayr D-Line lifts at Loon Mountain and Big Sky Resort. Boyne also worked to open a new peak at Sunday River dubbed Merrill Hill, serviced by a Sunday River Red triple chair. Seeing how smoothly its pandemic-postponed projects went, Boyne went ahead and announced three 2022 lifts early for Boyne Mountain, Loon Mountain and Sunday River.
No new lifts debuted at Alterra mountains this year but the growing company’s pause won’t last long. Leitner-Poma completed the towers and terminal foundations for the Base-to-Base Gondola, which will be one of the most unique lifts in America when complete next year at Palisades Tahoe. The project includes four stations, three haul ropes, more than 30 towers and a cabin storage facility. Alterra also has grand plans for new lifts at Steamboat including North America’s longest gondola.

This year’s projects were dispersed all across the US and Canada with particular strength in the traditional Rocky Mountain and Northeast markets.

2021 saw a roughly even split between fixed and detachable lifts with both increasing from last year. Gondolas took a slight pandemic pause again but will be back in a big way next year with Palisades Tahoe, Steamboat, Whistler all planning large installations. No resorts built aerial tramways in 2021 but two new surface lifts debuted.
Fifteen years ago, around half of new lifts were for expansions while the other half replaced older ropeways. The share of replacement equipment has only grown, making up nearly three quarters of all projects this year. We said goodbye to many lifts from defunct manufacturers in 2021 with 12 Halls, 6 Borvigs and 3 Heron-Pomas being retired this year.
The detachable business split right down the middle with Leitner-Poma and Doppelmayr each completing eight lifts. Things will get interesting next year when MND Ropeways completes its first US detachable at Waterville Valley in partnership with Swiss manufacturer Bartholet. The last time three firms competed in the detachable space Amazon only sold books.


The fixed grip side of the business also split roughly evenly with Skytrac edging out Doppelmayr. Skytrac fabricated eight complete lifts plus two retrofit Monarch drive terminals, the most projects ever in one year for the company. Doppelmayr’s Alpenstar model continued to be popular with seven installations.

We saw the ski industry recover faster from the pandemic than other segments of the travel and tourism world. Only two installations were at places other than ski areas in 2020 and 2021, both gondolas at the Icy Strait Pont cruise port in Southeast Alaska.
The percentage of lifts installed used remained low this year with just seven reinstallations. Most customers opted for brand new machines from four different manufacturers.
Doppelmayr won the total project count with 18 installations while the Leitner-Poma/Skytrac duo installed 16. Partek completed a new quad chair at Trollhaugen, Wisconsin after a on-off year with no projects in 2020.
Projects in 2021 were incredibly diverse, from the tiniest platter at a new Club Med in Quebec to Big Sky’s Swift Current 6, the longest D-Line chairlift in the world. The below chart shows Leitner-Poma and Skytrac roughly split their business of large lifts and small lifts while Doppelmayr covered the entire gamut of Vertical Transport Feet per Hour under one roof.
The lift companies enjoyed a great year and so did Lift Blog. A record 617,000 people visited this website in 2021 and viewed 3.6 million pages. Next year I should finally finish visiting every US ski area, a milestone I’ve been chasing since I was four years old. There’s so much to look forward to in the lift world in 2022 and I hope you follow along as I do my best to cover it all. Happy New Year!
News Roundup: Epic Lift Update
- Leitner-Poma expects US lift sales to reach $300 million in 2022.
- The lift-served real estate development called Flat Iron at Big Sky moves forward.
- PyxisAI goes live with its artificial intelligence lift monitoring software on Winter Park’s Prospector Express and Gemini Express.
- The latest from Moosehead Lake, formerly Big Squaw.
- Mt. Hood Meadows provides an update on its six pack ambitions.
- Deer Valley reveals what broke on the Carpenter Express last week.
- Arizona Snowbowl posts an explainer on rime ice and detachable lifts.
- A minor gondola collision makes the news in Whistler.
- The Disney Skyliner’s longest section will close for scheduled maintenance next month.
- Magic Mountain finally gets the Red Chair open; within hours an empty chair hits a tower and falls off.
- 18,000 people sign a petition asking Vail Resorts to improve operations at Stevens Pass.
- The first ski runs at Valemount Glacier will be logged in January.
Instagram Tuesday: Snowflake
Every Tuesday, I feature my favorite Instagram photo from around the lift world.
News Roundup: Merry Christmas
- Mad River Glen introduces a new James Niehues trail map.
- White Pass shareholders vote to sell Washington’s fifth largest ski area.
- Sun Peaks expects business to decline 50 percent this season due to extended road closures.
- Sierra at Tahoe tracks toward a limited reopening in Spring 2022.
- Magic Mountain apologizes to customers for not having a summit lift operational.
- Searchmont, Ontario reopens with a new chairlift after a 645 day Covid closure.
- It may be months before Kimberley’s main lift is operational; Revelstoke and Kicking Horse provide people-moving snowcats.
- Stevens Pass apologizes for severe staffing shortages resulting in only five open lifts.
- Deer Valley rope evacuates 167 people from the Carpenter Express.
Instagram Tuesday: Ready to Go
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Fire Breaks Out at Kimberley Lift
For the second time in less than a year, the community of Kimberley, British Columbia faces weeks without a lifeline ski lift. A fire ignited at the Northstar Express early Saturday morning, burning the top operator hut. While outbuildings next to lifts are usually small, they typically contain electrical components critical to operation. Thankfully, the lift was not operating at the time and no one was injured.

The resort’s website shows the last image from the lift shack taken at 1:20 am, just before the fire was reported. While fires have occurred by accident at chairlifts in the past, police are investigating to determine the cause of the blaze. The town of Kimberley was already on edge due to another early morning fire which destroyed the Kimberley Gymnastics Club on December 14th and was deemed suspicious in origin. Police have yet to make any public statements about the cause of the Northstar Express fire.
The timing of ignition the morning after opening day and just before the key Christmas period is incredibly unfortunate if not suspicious. “Our hearts also go out to everyone in Kimberley who makes a living dependent on tourism and the operation of the ski resort, including the owners of many of the businesses in town, and the great staff who work for them,” the resort said in a statement. “Please know that our main focus right now is continuing to give locals and visitors access to the great skiing and riding, and to make visiting the resort as fun and enjoyable as we can.”
The Northstar Express is the only lift servicing the front side of the mountain and providing access to backside lifts. At one point, Resorts of the Canadian Rockies (RCR) operated four different parallel lifts on this part of the hill including a triple chair, double and T-Bar. All but the quad were removed in the early 2000s to save labor and maintenance costs associated with lifts deemed redundant. A string of setbacks now again leave the resort with two functioning chairlifts on the back of the mountain with no easy access.
There is precedent for the workhorse Northstar being out of service. On January 2nd last year, the Leitner-built quad was rendered inoperable by a gearbox failure. Kimberley lift maintenance and Leitner-Poma worked on repairs, which were completed in just over two weeks. In the meantime, the resort stayed open with uphill hiking allowed to access the backside Easter and Tamarack lifts. A similar operation is planned this time around with the addition of ski/snowboard transportation for those hiking. “Our main focus of course is getting the Quad chair up running again as soon as we possibly can,” said Kimberley. “We are working hard to source any parts we can from around the world to try to replace what was lost.” In the meantime, season passholders are invited to ski at other RCR mountains including Kicking Horse and Fernie.
The Kimberley RCMP is requesting anyone with any information that could assist the investigation to please contact them at (250) 427-4811.
News Roundup: American Rescue Plan
- Moosehead Mountain’s redevelopment is pushed back to 2023 at the earliest.
- Deer Valley moves toward replacing the Silver Lake Express, possibly with a gondola.
- A proposed development adjacent to Big Sky Resort includes a pulse gondola and two platter lifts.
- Whiteface’s new quad is named Warhorse.
- Snow King’s new gondola opens tomorrow but not for skiing.
- The first pieces of Waterville Valley’s Bartholet/MND six pack arrive stateside.
- A new map shows where Caberfae Peaks’ East Peak triple will go.
- Attitash permanently closes the West Double Double to “prep for it being replaced.”
- Mountain Capital Partners unveils a concept plan for 19 new lifts across thousands of acres at Brian Head.
- The Forest Service green lights construction of Mt. Hood Meadows’ first six pack.
- Breckenridge celebrates 60 years of massive growth.
- Bartholet plans to build its first RopeTaxi with cabins departing on demand in 2022.
- Cannon will seek American Rescue Plan funds for tram overhaul/replacement, possibly as early as 2023.
- Blacktail Mountain joins the Indy Pass.
- A video shows a loaded lift roll back in Kyrgyzstan.
Instagram Tuesday: Last Load Tests
Every Tuesday, I feature my favorite Instagram photos from around the lift world.


















