Eight Seater Coming to Sunday River’s Jordan Bowl

Doppelmayr will build the fastest eight place chairlift in North America for the 2022-23 season, a Sunday River Red bubble chair in Jordan Bowl. Dubbed Jordan 8, the lift will feature the world’s first red-colored bubbles along with heated seats, a loading conveyor and direct drive. Jordan 8 will spin a blazing 6 meters a second, shaving a minute off the ride time of the current Jordan Bowl Express and transporting 3,200 skiers per hour. “We are proud as a team and so excited to bring the latest Doppelmayr technology to Sunday River,” said Stephen Kircher, CEO of Boyne Resorts. “With each milestone in the Sunday River 2030 plan, Boyne Resorts is enhancing the experience across the board with major investments in infrastructure.”

The current Jordan high speed quad will be refurbished to replace the Barker Mountain Express for winter 2023-24. Some may wonder why Jordan for a D-Line lift rather than Sunday River’s original peak with an older detachable quad. The answer lies in Jordan Bowl’s popularity with guests, the amount of wind and snow it sees as well as the fact Sunday River owns thousands of acres next door. The Jordan/Oz peaks and future terrain beyond will be known henceforth as the Western Reserve. “The Jordan 8 is a significant jumping off point for the Western Reserve, creating a portal that could double our skiable terrain in the coming decades,” said Dana Bullen, President of Sunday River. “This lift also acts as an immediate catalyst for upcoming renovations to the Jordan Hotel, new activities and amenities.” Both Jordan 8 terminals will feature glass weather protection, allowing all 60 chairs to be parked without a separate storage building. Each chair weighs 2,262 pounds, making the lift wind resistant during storms.

Jordan 8 is the third major lift project announced by Boyne Resorts for 2022. Also in New England, the company is relocating the former Kancamagus detachable quad at Loon Mountain to replace Seven Brothers. Last week, Boyne Mountain unveiled plans for Disciples 8, the Midwest’s first eight passenger chairlift. When Disciples 8 and Jordan 8 open next winter, Boyne Resorts will operate eight seat chairlifts at four of its nine mountains and 80 percent of all the eight seaters in the United States.

Telluride Outlines Four Planned Lift Projects

Telluride Ski & Golf owners Chuck and Chad Horning hosted a community meeting tonight, outlining a nine figure capital plan for the next five to ten years. While no lift contracts have been signed, Telski officials revealed they are close to a deal with Doppelmayr for a new detachable quad and are working on three additional projects to be built in seasons to come. Telluride also outlined new employee housing and hotel initiatives which are key to supporting future growth.

The first new chairlift in 14 years will likely be a detachable quad replacing Plunge, Lift 9. The triple chair’s ride time exceeds 13 minutes and the $8 million quad would carry 1,800 skiers per hour, up from 1,200. The Hornings said they would like to ink a deal with Doppelmayr in the next few weeks but that plan may depend on community support for tourism in two November 2nd ballot questions regarding short term rentals.

The second project Telski officials discussed was an up-gauge of the Village Express to a six place. This out-of-base workhorse would likely feature wider chair spacing than the current detachable quad, allowing for fewer stops and more efficient loading. Also on the roadmap for replacement is Sunshine Express, once the longest high speed quad in the world. A modernized chairlift would run $9 or 10 million but the resort is considering building an even more costly multi-stage gondola. Like many of its competitors, Telluride wants to shift ski school operations to the upper mountain, which would require a beginner-friendly gondola. If built as a gondola, Lift 10 would likely include an intermediate station at The Market and Mountain Village parking garage. The lower section of the gondola could run independently in the summer to complement the existing three section gondola operated by the town of Mountain Village. Discussions are ongoing about that project and the future of the aging Telluride-Mountain Village gondola system in general. Finally, Lift 7 is on the radar to be replaced with a higher capacity fixed grip lift at a cost of around $3 million.

All told, the Hornings are looking at spending $35 million on lifts. Ownership said Telluride will remain a Doppelmayr mountain with fixed grip, UNI-G and D-Line options all under consideration. They noted global steel and copper demands are impacting lift prices but both parties are eager to make a deal.

Arapahoe Basin to Build First Six Pack

Arapahoe Basin has reached a deal with its longtime lift supplier Leitner-Poma to replace the Lenawee Mountain triple next year. The mountain’s first six place chairlift will increase throughput from 1,800 skiers per hour to 2,400. “In addition to 6-packs being more stable in high winds, we felt this lift would do the best job of increasing capacity,” wrote Chief Operating Officer Al Henceroth on his always informative blog. “Through our planning we felt the need to upgrade the capacity of Lenawee from 1,800 people per hour (pph) to 2,400 pph. While this could technically be achieved with a quad chair, we felt that in actual use, the 6-pack would be far more effective achieving that goal of 2400 pph,” he continued.

Other new lifts planned for Colorado next year include the first section of Steamboat’s new Wild Blue Gondola, a Rip’s Ride replacement at Breckenridge, Bergman Bowl Express at Keystone and two new detachables at Vail. Copper Mountain, Loveland and Winter Park all have Forest Service approval to build lifts as well, though timelines have not been announced for those projects.

Major Lift Realignment Underway at Michigan’s Bittersweet

Bittersweet in Michigan is making way for a second detachable chairlift in 2022. The mountain’s current high speed quad, the Sweet Express, will move northwest to replace the Poison Ivy triple this season. That late model Hall has been moved the other direction to replace the Chickory double. Along the way, Chickory will be upgraded with a brand new Skytrac drive terminal.

The lift shuffle come as Bittersweet owner Wisconsin Resorts expands to include six mountains in Michigan, Wisconsin and Ontario. Throughout its history, the company has invested heavily in both lift and snowmaking infrastructure.

The new Sweet Express is the third lift announced for the state of Michigan in 2022. On Wednesday, Boyne Mountain unveiled plans for the region’s first eight passenger chairlift. Caberfae Peaks also plans to add a new lift next year.

News Roundup: Planning Ahead

No Injuries Reported in Courchevel Tram Crash

Both cabins on a 120 passenger aerial tramway collided into stations earlier today in Courchevel, France. The Saulire Cable Car was undergoing tests at the time and no one was injured. “During an annual regulatory check carried out at the technical limits of the device, an incident severely damaged the two cabins,” read a statement from the Société des 3 Vallées, operator of the tramway. “An expert report will determine the causes of the incident and the S3V will do everything in its power to restore the ropeway in complete safety.”

The Saulire tramway was the world’s largest when built by Poma in 1984. At that time its cars carried up to 160 passengers each. Both cabins were renovated in 2013 at a cost of €300,000.

Courchevel makes up one part of Les 3 Vallées, the largest ski complex in the world with 183 lifts.

Boyne Mountain to Launch Midwest’s First Eight Seat Chairlift

Boyne Resorts’ commitment to modernizing lift infrastructure across its properties will continue in 2022. The company today announced construction of Disciples 8, an eight place chairlift replacing Disciples Ridge and Disciples II at Boyne Mountain. The Doppelmayr D-Line system will feature a direct drive, auto locking safety bars and a loading conveyor, though no bubbles due to its 3.2 minute ride time. D8 will be Boyne Resorts’ third eight passenger chairlift following installations at Big Sky Resort in 2018 and Loon Mountain this year.

Boyne Mountain has been a center of lift innovation ever since it opened with the Midwest’s first chairlift in 1948.  From there, Boyne introduced the world’s first quad in 1964 and installed America’s first high-speed six person chairlift in 1992. “Boyne Mountain started our company’s 75 year journey in the ski and resort business, and we are excited to again build on its incredible foundation of innovative industry firsts with the next generation of attractions and our heritage of elevating the Midwest resort experience,” said Stephen Kircher, CEO and president of Boyne Resorts. More information on other improvements announced today can be found here.

Future lift upgrades are planned for Meadows, Super Bowl, Victor, Boyneland and the Mountain Express, which will create the Midwest’s most advanced lift system.

Storm Damages Gallix Chairlift in Quebec

Heavy rains caused the drive terminal of a Northern Quebec ski resort’s only chairlift to collapse Sunday night. Photos from the scene show all four terminal legs and the operator house out of position with the motor room hanging precariously. The lift involved is a 1998 Doppelmayr fixed grip quad with a slope length of 2,660 feet.

“The Gallix station team is working hard to secure the perimeter of the lift pending the arrival of the supplier inspectors,” the mountain said in a statement. “During this time, we ask the public not to visit the scene because of the extreme danger of soil stability and chairlift structure. It’s still too early to conclude anything about the 2021-22 season. Thank you for your words of encouragement and understanding,” the mountain added.

The chairlift cost CA$1.5 million when it was installed. A meeting is scheduled for Wednesday between the ski area and its insurance company.