Every Tuesday, I feature my favorite Instagram photos from around the lift world.
New Lift Coming to Kelly Canyon
For the first time in decades, Kelly Canyon is getting a new chairlift. The fixed grip triple chair is the first new lift announced in the state of Idaho for 2021. The lift will service new terrain above the current lift-served summit with an exact location to be announced later.
With six complete lift projects and multiple retrofits already confirmed, Salt Lake City-based Skytrac is gearing up for one of its busiest construction seasons ever.
Kelly Canyon will run a contest on social media to name the new lift.
Mont-Sainte-Anne Gondola to Reopen
367 days since technical problems forced its closure, L’Étoile Filante is reopening at Mont-Sainte-Anne. The gondola suffered not one but two incidents in February and March of 2020 before Covid paused skiing globally. Over the past many months, the resort, Doppelmayr and the Government of Quebec have worked to resolve unspecified technical challenges.
“We have just received approval from the Régie du bâtiment du Québec, which has given the green light for an official reopening,” said Maxime Cretin, Vice President and General Manager, Eastern Region for Resorts of the Canadian Rockies. “This approval was received following the security and compliance clearance obtained from the contract engineers. It confirms that the ski lift is safe and fully functional. We would like to sincerely thank you for your patience, understanding, resilience and loyalty through this difficult time. We know the wait has been long and the journey has been strewn with disappointments. Today, we are happy to share this good news with you and to finally be able to turn the page. We would also like to thank all of the employees and stakeholders for their continued collaboration in this very complex case.”
For the rest of this season, the gondola will operate with 50 percent of its cabins (45 of 90) with Covid loading protocols in place.
News Roundup: More Than a Mountain
- Mission Ridge is named its community’s Business of the Year for pressing forward with an ambitious lift replacement project using local labor during the pandemic.
- An auction gets underway for Howelsen Hill’s retiring double chairs.
- More than 28,000 non-union Vail Resorts employees will see end of season bonuses.
- Looking to cut costs, Six Flags axes one of its last three remaining VonRoll gondolas in Georgia.
- Silverton, Colorado weighs building a traditional ski resort to complement the non-traditional Silverton Mountain.
- Another child slips out of a chair but this time hangs on all the way to the top.
- Vail Resorts announces a better than expected 28.4 percent decrease in revenue for the quarter ended January 31st. Season to date through March 7th, skier visits are down 8.2 percent, lift revenue is down 8.9 percent, ski school revenue down 43.2 percent, dining revenue down 56.9 percent and retail/rental revenue down 31.6 percent.
- A report prepared by SE Group suggests $23 million worth of improvements to Spirit Mountain including a replacement Gandy lift. Under the plan, Double Jaw and Summit would be removed without replacement.
- Great Bear begins construction of its new Skytrac quad.
- A strategic plan for Arctic Valley includes T-Bar replacement.
- Blue Knob performs a night rope evacuation of the Route 66 double.
- The former owner of Showdown Montana floats developing a small ski area atop an EPA superfund site near Great Falls.
- The Jackson Hole Aerial Tram will shut down for maintenance all summer but two gondolas and a chairlift will spin instead.
- Leitner introduces an online ropeway configurator tool.
- A new lost Northeast ski area video series begins with an episode on Hogback Mountain.
- Virginia could become home to an even larger indoor ski area than New Jersey.
- Big Sky and Bridger Bowl skier visits trend lower than last year.
- Mt. Sunapee will auction chairs from the Duckling double to benefit the EpicPromise Foundation.
Utah’s Sundance Announces Two New Lifts
The new owners of Sundance Mountain Resort have ordered two lifts to replace the mile-long Ray’s quad. A three station detachable quad will service Mandan Summit from the base village and a fixed grip quad will provide return access from the backside of the mountain. Both lifts will be manufactured by Doppelmayr USA and installed in advance of the 2021-22 winter season.
Built in 1995, Ray’s currently serves many purposes with a whopping four separate loading/unloading zones. An up and over lift, Ray’s follows a straight line between the base area and Red’s lift, thus not reaching the true Mandan Summit. Both new lift alignments will top out on the peak to better distribute skiers. The new high speed lift will also feature a mid-unload station for beginners. A ride from base-to-summit will last just seven minutes, down from 12+ without stops on Ray’s. The second lift returning from the backside will primarily be used for summer activities.
“I have wonderful memories of skiing the beautiful terrain of Mandan Summit on the old chairlift before 1995,” commented Chad Linebaugh, President and General Manager of Sundance. “We are thrilled for the addition of a new high-speed quad that will restore access to these amazing runs and views.” Other projects slated for this summer include additional snowmaking and parking.
Two private equity firms, Broadreach Capital Partners and Cedar Capital Partners, purchased Sundance Resort from Robert Redford in December 2020.
Berkshire East and Catamount Plan Three New Lifts
Schaefer Resorts will invest heavily in its Massachusetts and New York mountains coming out of the pandemic. In a letter to guests dated yesterday, Jon Schaefer remarked on this season’s success and looked toward the future. “This year skiing got its groove back,” he noted. “This wasn’t just at our mountains, but across the board, skiing in the United States switched from something people did or went on vacation to do and became the wintertime covid escape mechanism. In November, I wondered how everyone would survive and worried about what the sport would lose, and in March, it’s obvious that at least on the mountain, people and the sport are thriving.”
As previously announced, Catamount’s Glade double will be replaced with a used fixed grip triple or quad. Although most of the ski area lies in Massachusetts, this new lift will be located entirely in New York State. A second used lift is planned to service unspecified new terrain. One used Poma lift has already been delivered to Catamount for installation.
Berkshire East will move forward with an eastward expansion “immediately,” including a new lift ending near the top of Mohawk with a base terminal located just above the Deerfield River. This project has been in the works for a number of years with permitting in place. Both Berkshire East and Catamount will also see major snowmaking upgrades.
Instagram Tuesday: Panoramic
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
Devil’s Head to Build New Beginner Quad
Wisconsin’s Devil’s Head Resort will add a sixth fixed grip quad this summer, continuing a major reinvestment plan executed over the past ten years. The new Doppelmayr lift will replace two Hall chairlifts dating back to 1971 and 1975. Devil’s Head notes the new lift is just the beginning of a multi-year expansion plan to enhance the on-mountain experience for beginners.
Many Upper Midwest resorts experienced plentiful snowfall and high demand for skiing and snowboarding this winter and are looking to the future. The Devil’s Head project is the second lift addition announced by a Wisconsin resort for 2021-22. Trollhaugen also plans to add a new fixed grip chairlift to replace a Hall double.
News Roundup: Grab Bag
- Timberline Lodge evacuates 42 guests from the new Pucci detachable quad by rope.
- Another late day evac happens on Castle Mountain’s Tamarack chair.
- Mt. Spokane considers upgrading two 60 year old chairlifts.
- The seemingly cursed Gold chair at Nakiska goes down for a week (now back in action).
- Under new ownership, Sundance Resort eyes an out-of-base detachable.
- Bogus Basin plans expansion and lift upgrades in a new master plan coming later this spring.
- Dakota at Big Sky has been down since March 1st.
- The first of its kind Leitner 2S gondola undergoes testing in Germany.
- Ischgl, an early pandemic hot spot last year, gives up on opening this season.
- Vancouver’s transit authority picks a preferred alignment for the Burnaby Mountain Gondola.
- The Seattle Times profiles Washington’s first bubble chairlift.
- A transportation bill which includes Little Cottonwood funding heads to the Utah Governor’s desk.
- Once slated to close, Sleeping Giant now considers adding more lifts.
- Zincton Mountain Village, a proposed resort in BC, announces the purchase of a late model Riblet quad.
- Facing capacity challenges, Crystal Mountain eliminates unlimited access on the Ikon Base Pass.
- Magic Mountain needs some mid-’80s vintage Poma sheave assemblies to complete the Black Line quad. Give them a shout if you can help!
- Winter Park’s proposed lift replacements I mentioned last week are a Pioneer Express six place and Lariat conveyor.
- On a podcast, Indy Pass creator Doug Fish says more resorts are coming, including in Canada (along with a price increase.)
- During recent historic snow, the Portland Aerial Tram ran for 114 consecutive hours while other transit modes shut down.
- When the Disney Skyliner stops for a bit, you better believe it will make the news.
- Nitehawk looks for funding to replace its landslide-destroyed chairlift.
Instagram Tuesday: Glazed Over
Every Tuesday, I feature my favorite Instagram photos from around the lift world.








