- A video shows the Kicking Horse incident was exacerbated by running the damaged hanger to a tower, causing the lift to de-rope. The gondola will be closed at least a week and likely longer; the resort will allow guests to hike or skin to Stairway to Heaven.
- The snowboarder who died after falling from Red Lodge Mountain’s Triple Chair on Monday is identified as 37 year old Jeffrey Zinne of Billings in an incident described as a “malfunction.”
- A child was airlifted to Denver after falling 35 feet from the Purgatory Village Express the same day as the Kicking Horse and Red Lodge incidents.
- Leitner-Poma posts jobs for ski lift installers at Bretton Woods, Loveland, OZ Trails Bike Park, Powder Mountain, Snowmass, Snowbasin, Taos and Wasatch Peaks Ranch.
- New York State wins its case against a ski resort owner for buying Toggenburg to close it and reduce competition.
- Snowbasin to sell chairs from the Becker lift for charity.
- Loup Loup, Washington ends its season early due to a required motor repair.
- Vail’s Riva Bahn Express has been closed all week due to a gearbox issue requiring a rebuild.
- Vail Resorts reports solid results with season-to-date skier visits down 2.5%, lift ticket revenue up 4.1%, ski school revenue up 3.0%, dining revenue 3.1% and retail/rental revenue down 2.9%. Net income for the quarter ended January 31st increased 11.9%.
- Tenney Mountain, New Hampshire still plans to reopen the Hornet some time this winter following a gearbox issue.
- Another lawsuit is filed against the Little Cottonwood gondola proposal.
- Attitash reopens the Flying Bear five weeks after a chair fell from the line. Draft minutes from the New Hampshire Passenger Tramway Safety Board suggest multiple damaged carriers were found and Attitash was approved to reduce capacity from 82 to 64 carriers. Update Monday 3/17: Vail PR sent me this statement, emphasis theirs: “During our inspection process, we made the decision to reinspect all our chairs and grips, haul rope, sheaves, terminals, and more. Following our inspection, we are taking the opportunity to replace parts on some chairs unrelated to the incident as a part of routine upgrades. These chairs will remain temporarily out of service until the parts arrive. This was a decision made by the resort, that the Passenger Tramway Safety Board unanimously approved at the March 3rd board meeting. We have been given permission to run the lift between the manufacturer’s minimum and maximum design specifications.”
- Ober Mountain, Tennessee opens the new Sky Village Express.
- Whistler Blackcomb completes a mid-season rope inspection and splice due to a broken haul rope strand on the Emerald 6 Express.
- WB also pulls the plug on summer skiing due to glacial recession and its impact on lift access.
- A community co-op effort was unable to submit a bid for Mt. Bachelor.
- Vista Ridge, Alberta closes both its chairlifts indefinitely to conduct a review following several evacuations.
- Alpental will close two weeks early so crews can work to build the new Chair 2 over snow in a roadless area.
- Ditto for Explorer at Big Sky as it’s replaced with a gondola.
- After running on diesel generators for a decade, the Sea to Sky Gondola‘s upper terminal is connected to grid power for the first time.
- Whaleback, New Hampshire says it needs to raise $250,000 to fund off season maintenance and chairlift repairs.
- Titcomb Mountain looks to retire and replace T-Bar 2.
- Powder Mountain to build a private, homeowner only Leitner-Poma detachable quad this summer.
- Snowbird’s Mineral Basin reopening is further delayed due to “unforseen additional issues“.
- The Forest Service approves Alta to replace Supreme with a new lift and no eight degree bend.
- Pending approval of its members, Bryce Resort plans to install a third Skytrac on the backside of the mountain this summer.
Vista Ridge
News Roundup: Shortest and Longest
- Vista Ridge, Alberta rope evacuates the Wilson quad.
- Lutsen rope evacuates the Caribou Express (*despite what the link says, customers did receive lift ticket vouchers)
- Summit Express at Keystone has been down since last Saturday.
- Both Snowcat and Bobcat are inoperable at Wildcat, New Hampshire.
- The problem with Blackcomb’s Glacier Express is gearbox-related; WB airlifts a new electric motor into the Big Red Express terminal by helicopter with minimal down time.
- A number of lifts are also inoperable at Seven Springs, PA.
- A minor holder of Vail stock calls for executive firings and publishes a detailed presentation why.
- A teenager is injured and airlifted after hitting a lift tower at Mohawk Mountain.
- Killington has looked at replacing Ramshead with a bubble lift.
- Burke Mountain removes its J-Bar from the snow report entirely.
- Sitzmark, Washington won’t open this season.
- The Forest Service green lights Brighton to replace Milly Express and shorten Explorer.
- Looming tariffs on both Canada and the European Union could impact both lift manufacturers and their customers.
- The world’s shortest T-Bar – with no towers and just five carriers – begins spinning tomorrow.
- The world’s longest gondola reaches 60 percent completion with 290 workers on site.
News Roundup: Big Week

- Cloudchaser construction begins July 1 at Mt. Bachelor.
- La Paz’s gondola network sets a new daily ridership record – 180,000 passengers on three lines last Monday.
- Poma signs three year partnership with the World Wildlife Fund to promote environmentally-friendly urban cable transport.
- Doppelmayr sponsors exhibition at the Vienna Technical Museum showcasing ropeways in cities.
- Vista Ridge lost a carpet lift and might have to do some extra NDT but came away from the Fort McMurray wildfire relatively unscathed.
- It’s still not entirely clear when Vermont’s only aerial tram will reopen.
- The first LST lift in North America is under construction at Cannon Mountain.
- Local paper gives a progress report on Wilmot Mountain’s Vail makeover.
- Powdr announces Woodward Park City with lift-served downhill mountain biking and terrain parks to be built on 126 acres at Gorgoza Park.
- Powdr also commits to building a new lift at Eldora next summer, most likely the Cannonball six-pack.
- Laurel Mountain hosts a tower flying party.
- The President of Simon Fraser University puts the Burnaby Mountain Gondola back on the table in hopes of replacing 25,000 daily bus trips between campus and Vancouver’s SkyTrain Millenium Line with a 3S.
News Roundup: Skyline
- Two men want to build an iconic gondola called Skyline along the Chicago Riverfront.
- Sandia Peak unveils new tram cabins for its 50th anniversary.
- Sugarloaf updates the public on its summer lift maintenance projects.
- BMF wins contract for its first 10-passenger gondola to be built next year in Switzerland.
- The owner of Gletscherjet 3+4 built last summer in Austria say it has already carried 3 million passengers, believed to be a record for a winter lift. The system is an 8/10 combination lift interlining with a 10-passenger gondola.
- Poma’s 2015 Reference Book is now online highlighting last year’s projects from around the world.
- Are Vail Resorts and Powdr Corp. bidding on Eldora?
- A New Zealand developer will test whether a Whistler-style bike park with its own high speed quad can stand alone without skiing.
- Doppelmayr and its contractors take responsibility for a construction accident at one of the terminals under construction in La Paz that injured ten people on Saturday.
