News Roundup: Gondola Tax

Anakeesta Announces New Gondola

Tennessee mountaintop theme park Anakeesta will debut a detachable gondola next year, part of a $100 million expansion called Making More Magic. The high-speed, six place lift will replace Anakeesta’s fixed grip chondola, which has carried millions of guests from downtown Gatlinburg to the park over the past nine years. The current lift moves only 200 feet per minute, leading to long ride times and limited capacity. Leitner-Poma designed the new gondola to move more people with 56 Diamond Evo cabins featuring floor-to-ceiling windows and glass floors. “Designed to offer panoramic, 360-degree views of the Great Smoky Mountains, each cabin transforms a simple ride into an unforgettable experience,” said Anakeesta. “As guests glide gently upward during the four-minute ascent, the world unfolds beneath the cabin—lush forests, native wildlife and the charming skyline of downtown Gatlinburg.” This will be the first true gondola in Gatlinburg, a bustling town with no fewer than five scenic chairlifts and an aerial tramway.

Construction will begin this month and the existing lift will spin through the Christmas holiday period. Anakeesta will close completely on January 5th and reopen in March with alternative transportation. The upgraded gondola will follow later in the spring alongside a reimagined mountaintop village and expanded treetop skywalk.

News Roundup: Apple Harvest

News Roundup: Last Tram

Steelhead Systems Responds to Ski Bluewood Lawsuit

Bluewood lift maintenance staff re-hang chairs on the Skyline Express, a Borvig triple once scheduled to be replaced by a used detachable quad this year. Photo credit: Ski Bluewood

British Columbia-based Steelhead Systems Inc. (SSI) has responded to a lawsuit filed by Ski Bluewood, Washington over a delayed lift project. As I detailed last month, the two parties initially agreed to bring a used detachable quad to Bluewood in June 2024. The 1993 Doppelmayr lift would replace a base-to-summit triple chair and dramatically reduce ride time. SSI would act as a broker between Pro-Alpin Ropeway Services of Austria and Bluewood, bringing the lift from Sölden to Washington at significant saving versus a new lift. SCJ Alliance would engineer the lift and Bluewood would complete much of the installation work itself. Bluewood announced in late June 2024 the lift was expected to open for the 2025-26 season.

The deal soured this summer when disagreements arose over shipping costs, timelines, the number of shipping containers needed, exchange rates and more. In its claim filed in the Supreme Court of British Columbia, Bluewood alleged breach of contract, negligent misrepresentation and unjust enrichment by SSI. In its Response to Civil Claim, SSI’s attorney denies many of Bluewood’s claims, including that shipping costs and exchange rates were fixed upon contract signing. SSI alleges only after Bluewood stopped making payments did it stop shipping containers across the Atlantic. “Pursuant to [the agreement], all responsibility and risk with respect to the equipment, including transportation, rests with the Buyer,” the filing notes. “This responsibility includes any changes to shipping costs or exchange rates, which are matters outside the control of the Defendants.” SSI argues three outstanding invoices total $587,548.

SSI also alleges its principal, Zrinko Amerl, told Bluewood in 2024 that fall 2025 completion was an optimistic timeline. The complaint alleges Bluewood failed to provide accurate survey data in a timely manner. Steelhead Systems says SCJ Alliance’s engineer requested a 16th tower, which SSI agreed to provide at below market price. Finally, SSI alleges “ProAlpin insisted that there be a garage system put in place for maintenance and storage of chairs, however [Bluewood] refused to follow this recommendation.” On October 26th, I received word that SCJ did not request a 16th tower and that line was in the process of being corrected in the Response to Civil Claim.

To date 23 containers have been delivered to Bluewood containing chairs, terminal elements and towers. Four containers’ worth of equipment remains in Austria. Alarmingly, Pro-Alpin indicated to SSI that all remaining parts, including bullwheels and the haul rope, not picked up by September 8th, 2025 would be scrapped. “As of today’s date, SSI is unaware if any action has been taken with respect to this,” the filing notes.

Shortly after filing the response, SSI countersued Bluewood’s owners, alleging the lawsuit, associated press release and media coverage have damaged its reputation. The filing specifically mentions Lift Blog’s coverage and reader comments impacting SSI’s ability to sell lifts within the broader mountain resort industry. “As a result of the defamatory statements made by [Bluewood], SSI has suffered and continues to suffer losses to its business,” the suit says, alleging statements made by Bluewood will cause an estimated loss of approximately $10 to $15 million in revenue. The company seeks payment of outstanding invoices plus interest, damages and other costs.

Bluewood officials declined to comment beyond their initial press release, citing pending litigation. The ski area has been busy re-hanging chairs on the Skyline Express, the 1978 Borvig once set to be replaced.

News Roundup: Chairlift Ban

Killington to Replace Snowdon Triple

Killington Resort’s new, independent owners plan to spend $22 million on improvements next year, including construction of a new chairlift. Projects will include the fixed grip quad replacing the Snowdon triple, a lodge expansion, $2 million in snowmaking improvements and $2 million for new snowcats. The news comes at the end of a $38 million summer with Killington replacing the Superstar Express, installing new cabins on the Skyeship Gondola and rebuilding Skyeship’s cabin parking facility this offseason. By this time next year, The Beast’s new owners will have invested $60 million since purchasing Killington and Pico from Powdr in 2024.

The $6.5 million Snowdon Quad will load in a slightly different spot but follow roughly the same line as the outgoing triple, a Heron-Poma dating back to 1973. “The lift will feature fixed-grip chairs as opposed to detachable ones to help it stay operational during tougher weather events,” Killington noted. “This is part of a long-term strategy to maintain our network of fixed-grip lifts, ensuring reliable lift access to all areas of the mountain, even during inclement New England weather.” From the top of Snowdon, guests can access both the North Ridge Quad and Canyon Quad even if the nearby K-1 Gondola and Snowdon Six Express are closed. A manufacturer for the new lift was not announced though Doppelmayr built the new Superstar six pack this summer. Otherwise Killington operates an extensive fleet of Leitner-Poma equipment.

New Sigma Diamond cabins for the Skyeship Gondola awaiting installation.

Construction will begin in the spring and the Snowdon Quad is expected to open for the 2026-2027 ski season.