- As Vail Resorts shakes up management in the northeast, outgoing Mt. Sunapee GM Jay Gamble reflects on 20 years of growth including four new lifts and 110,000 annual skier visits.
- Vail also says goodbye to Sunapee’s Duckling double after 55 years.
- The owner of Mt. Washington, British Columbia; Ragged Mountain, New Hampshire; Wisp, Maryland and Wintergreen, Virginia takes over operations at Powderhorn, Colorado.
- Propelled by five major projects in Colorado, Leitner-Poma says 2018 is it biggest year ever in the United States.
- The $2 billion Salesforce Transit Center in San Francisco, which features a short aerial tramway, is mired in problems unrelated to the lift.
- Construction begins in Switzerland for the world’s second longest 3S with the most towers – seven.
- With new six and eight passenger lifts, Big Sky Resort shifts away from the double/triple/quad lift lingo.
- Alterra names KSL veteran Adam Knox Senior Vice President of Strategy and Corporate Development to lead the company’s acquisitions and resort partnership group.
- Due to the amount of lift work needed after seven shuttered years, Cockaigne, NY won’t reopen this winter after all.
- One of the longest Riblets retired from Snowmass turns up in the Pakistani town where Osama bin Laden was killed.
- A freshly cut lift line is spotted in the Spanish Peaks development adjacent to Big Sky Resort, probably for the planned Highlands chair.
- The Berkshire Eagle looks at Catamount’s $5 million fall.
- A judge quashes spending for lift maintenance at the Hermitage Club, which remains in foreclosure. A new lawsuit against the ski area alleges breach of contract and consumer fraud.
- Another aerial tramway cabin crashes in Europe, this time on the one year old Bartholet jigback Staubernbahn. No one was hurt as the cabin that hit the ground was empty.
- The Boston Globe talks with Mainers about a fourth winter without Saddleback.
- In New Zealand, The Remarkables is set to build the inaugural D-Line in the southern hemisphere and Coronet Peak announces a Leitner Telemix.
- The new Bretton Woods trail map indicates the gondola may not be called Presidential Bahn after all.
- As Copper Mountain and Leitner-Poma crews work hard to finish two big lifts, opening weekend shifts to Super Bee.
How Many Lifts Could Vail Resorts Announce Next Month?
With four recent additions, Vail Resorts Inc. now operates just over 10 percent of American and Canadian lifts, more than any other company. Vail prides itself on investing heavily in its mountains and the average lift at an Epic resort is three years newer than the rest of the industry. The company’s lifts now number 305 in the United States, Canada and Australia with an average age of 24.6 years. If we assume the average lift lasts 35 years, Vail would now need to replace an average of about nine lifts per year just to turn over its fleet.
A little less than a year ago, a smaller VR unveiled plans for seven new lifts as part of a $150 million annual capital plan, the largest in the company’s history. Back in 2016, Vail committed to building three six-packs as part of $103 million in capital spending for 2017 (VR later added a fourth detachable to that year’s class, the Red Buffalo Express at Beaver Creek.) In December 2015, the Broomfield-based company announced a high-speed quad for Vail Mountain and in 2014, it was $50 million in improvements including three new lifts at Park City plus another six pack at Vail. Over the last five years, more resorts have consistently led to more revenue and more capital investments. The company said it will invest $35 million at the four new mountains in the next two years, making it possible this December’s announcement will be the most valuable ever.
Colorado
Going resort by resort, the most obvious projects are ones already in the pipeline, namely the Game Creek Express #7 replacement and Golden Peak race lift at Vail. But VR could go bigger like it did this summer at Whistler Blackcomb, spending $52 million to package four lift replacements together. On Vail Mountain, additional aging lifts likely to be up-gauged to six-packs eventually are Orient Express #21, Born Free Express #8 and Wildwood Express #3. The mothership mountain has the third largest and third newest lift fleet in the company and I expect investment to continue at Vail following this year’s pause.

On average, the newest lifts within Vail Resorts are at Beaver Creek, which opened decades later than its peers. A major expansion was approved in September – McCoy Park – which may be implemented in 2020. In advance of those two new lifts, the Strawberry Park Express could be updated in 2019 to a higher capacity gondola. The oldest lift at Beaver Creek is the 1988 Arrow Bahn Express, which eventually will be replaced by a newer detachable. Probably not this year though.
Sticking in Colorado, Breckenridge is usually the first or second most visited resort in America and did not see a new lift in 2018. I say a Riblet gets replaced here in 2019 and my vote would be 6-Chair with a high speed quad. My second guess would be C-Chair followed by 5, A, E and Rip’s Ride. If Vail decides to continue replacing older high speed quads instead, Beaver Run SuperChair is the logical candidate.

Keystone has both expansion possibilities and lifts that could be upgraded. The project everyone’s been clamoring for is a detachable lift from The Outback to replace Wayback. Peru Express is the oldest high speed lift at Keystone and a core workhorse, making it likely to be replaced with a six pack soon. Outback Express is one year newer and in a similar situation. Another possible replacement is Argentine, a 1977 Lift Engineering double that the 2009 Keystone Master Development Plan proposed replacing with a two stage detachable. The new lift would load near Peru, have an angle station above Lower Schoolmarm and continue all the way to the ridge of Dercum Mountain. The Keystone MDP also outlines major expansions that I expect we will hear more about over the next decade. They include a Ski Tip gondola, Bergman Bowl lift, Independence Bowl lift, Windows lift and Outback surface lift. Whatever Vail chooses, I am hopeful for a new lift or two at Keystone in 2019.

Crested Butte is the new kid on the block and Vail may wait a year or more to do anything lift wise. The mountain’s Teocalli II expansion is still moving through the Forest Service NEPA process. The Mueller family invested heavily in the Triple Peaks resorts over the years and I don’t see a whole lot needed near-term at CBMR. Replacing original Teocalli with a high speed quad would be a nice way to burn some of the promised $35 million.
Instagram Tuesday: Putting it Together
Utah Olympic Park Details Expansion Plans
The number of chairlifts at Utah Olympic Park will double within two years if the foundation that operates the Olympic venue successfully raises $11 million in donations. Located near Canyons Village, the park debuted with a CTEC double in 1992 and added its second chairlift in 1999. The Utah Legacy Foundation was founded in 2002 and created a model for post-Olympic sustainability, adding an alpine slide, two museums, zip lines and more to the facility. Utah Olympic Park still hosts hundreds of athletes for training in multiple disciplines and the proposed ski expansion would better support them.

A $2.7 million phase one expansion would see Deer Valley’s Homestake lift re-purposed for intermediate training near the shorter ski jumps. The 1999 Garaventa CTEC quad chair would have a mid load station and be installed next summer in order to open by late 2019. This lift will be around 1,200 feet long with a vertical rise of 400′. An even more ambitious project would add 30 acres of skiing on West Peak near the Olympic bobsled and luge track at a cost of $5.8 million. At 3,280′ x 1,200′, this lift would be roughly comparable in size to Jupiter at nearby Park City Mountain. The West Peak project is tentatively scheduled for 2020.

Utah Olympic Legacy Foundation President and CEO Colin Hilton told the Park Record this week that donations are off to a solid start. “Through the fundraising efforts, we feel pretty good that we are going to secure the first $3 million of the $11 million campaign to be able to progress. That’s why the Homestake lift is in the parking lot.”
News Roundup: More Maps
- As Aspen Mountain considers a Telemix combination lift, the Aspen Daily News looks back at other unique lifts in Pitkin County history.
- Purden Ski Village in BC is for sale at $1.7 million USD ($2.2 million CAD). The area operates two doubles and a T-Bar, all built by Mueller.
- Snowbird’s Chickadee has a new tower that hangs from a bridge.
- The final Disney Skyliner towers rise from a lake and one station gets a mural.
- Peak Pass sales are pacing ahead of last year by 19 percent in units and 22 percent in dollars despite increased northeast competition from Vail and Alterra.
- The shut down Hermitage Club expects to close on $25-30 million in financing around Thanksgiving. One potential reopening complication: the chairlifts haven’t been touched by mechanics since March.
- A new trail map shows the locations of Killington’s three new lifts.
- Beech Mountain is rocking two new quad chairs this winter and an all new trail map.
- Taos has an updated map to go along with its high speed quad.
Meet Big Sky’s Innovative New Lifts
Ramcharger 8 at Big Sky Resort is both the first eight passenger chairlift and first Doppelmayr D-Line lift in North America. I headed to Montana yesterday for an update on this exciting project and a related one, the new Shedhorn 4. Touring Ramcharger, it became clear the decision to purchase this lift was not just about the eight passenger chairs, heated seats or loading carpet. D-Line has numerous small innovations made with mechanics and operators in mind that combine to create a new generation of Doppelmayr detachable. A few features I noticed: Every grate and cover is designed to easily open and close for quick access to moving parts. Belts that connect station tires each have individual tensioners. Stairs lead into the terminals rather than ladders. Many spots where metal meets metal are lined with rubber for noise and vibration dampening. Doppelmayr says D-Line has more than 200 improvements overall.
The massive Doppelmayr Direct Drive motor is in place at the top terminal and will be water cooled. It will quietly and efficiently spin at just 13 revolutions per minute. Because a gearbox and related shafts have been removed from the equation, all braking will be directly on the bullwheel. There is a single diesel evacuation drive rather than separate evacuation and standby engines. The west side of the top terminal features a 7,500 square foot parking facility for the chairs in two rows. Part of the floor opens up to an equally-sized basement where bike carriers can be hoisted onto chair hangers come summer. The outside of the barn is being wrapped in plastic for this winter and will be completed next spring.
The first four chairs and hangers arrived during my visit at the end of a long journey from Austria by ship, train and truck (the entire lift came over in containers, not just the chairs.) The 64 carriers are emblazoned with Ramcharger 8 logos, feature heated seats and sport blue bubbles. They are so large that only four fit in each shipping container!
Steel will be set at the bottom tension station over the next 7-10 days, which we will be able to watch live. This terminal’s legs, loading conveyor and gates are already in place. Operators will be able to raise and lower the deck on demand for children to board and capacity will be 3,200 people per hour to start. The 54 mm haul rope is also on site after its trip from Fatzer in Switzerland. The comm line for this lift is completely underground as is apparently common in Europe.
Leitner-Poma & Skytrac to Build New Lifts in Outback Bowl at Schweitzer
The beloved Snow Ghost double will be retired from Schweitzer Mountain Resort next spring after 47 winter seasons, the mountain confirmed today. In its place, two new chairlifts will service Outback Bowl in improved alignments. A Leitner-Poma high speed quad will climb through the Kaniksu Woods area with a Skytrac fixed-grip triple servicing the Lakeside Chutes vicinity above. “Overall, we expect the two chair arrangement to complement our existing lift system and provide better access to some of the most popular terrain at Schweitzer,” says Tom Chasse, CEO of the north Idaho mountain. Schweitzer completed a similar project on the front side in 2007, replacing 5,500 foot Chair 1 with the Basin Express and Lakeview lifts.

The detachable quad chair will offer a capacity of 2,400 skiers per hour and rise 1,447 feet in just over five minutes. The triple chair capacity will be 1,800 per hour with a vertical of 1,360 feet and an 8 minute ride time. “We’ve seen over the years how a similar two lift system in the South Bowl has been beneficial when we have weather challenges,” said Chasse. “By having the two lifts serving different aspects of the North Bowl, our hope is to combat similar challenges on the backside of the mountain.” As part of the project, Schweitzer will add gladed terrain and four new runs surrounding the new lifts, which have yet to be named.
Instagram Tuesday: Game Time
Every Tuesday, I feature my favorite Instagram photos from around the lift world.
New York State Goes Lift Shopping

Only a handful of ski mountains in the United States are government owned and operated. The largest public ski outfit by far is New York’s Olympic Regional Development Authority, which runs Belleayre, Gore Mountain, Whiteface and the Olympic Ski Jumping Complex at Lake Placid. All but one of these properties are likely to see new lifts in 2019. Because the mountains are funded in part by taxpayers, potential lift projects are subject to competitive procurement. Over the last month, the Authority has opened requests for proposals for a new high speed quad at Gore Mountain, a quad chair at Whiteface and a surprise gondola at the ski jump.

Back on September 17th, ORDA opened bidding for a chairlift replacement project at Gore Mountain. “Gore Mountain Ski Resort will be replacing their existing triple chair lift with a high speed detachable quad chair lift,” notes the New York State Contract Reporter. “This would be a turnkey project where the winning bidder would provide all materials, labor and equipment to build and install the lift.” This is almost certainly the approved upgrade of Hudson, a 2010 Partek build. Bids were due last Tuesday and the term is 12 months. Leitner-Poma of America built the last three detachable lifts at Gore, so I’d argue it is their contract to lose.
Next up is an RFP for a new Bear Den quad at Whiteface, the largest ski mountain in the east by vertical. The current Riblet triple in the Bear Den base area will become one of many late model Riblet lifts to be replaced recently. I assume this one will be fixed grip but the contract reporter website does not specify. Bids are due on Monday, November 26th. Doppelmayr would seem to have the edge at Whiteface, having built the mountain’s three newest lifts.

News Roundup: Decisions, Decisions
- With approvals inked, Steamboat considers whether to build a second gondola or the Pioneer Ridge expansion first.
- The Kohlmaisbahn in Saalbach, Austria becomes the first gondola spotted with Omega V cabins.
- The Hermitage may miss Christmas.
- Catch a glimpse of the new Winter Park gondola cabins. Killington too!
- The eight urban gondolas in La Paz transported a 318,532 riders last Wednesday – a crazy new single day record.
- Thanks to community support, Antelope Butte is poised to reopen with two chairlifts.
- After having its summer camp shut down by the state of New Hampshire, Granite Gorge likely won’t open for downhill skiing this winter.
- The ex-Gore Mountain employee who claimed he was left on a lift overnight last winter is convicted of making a false statement to police and ordered to pay a $1,000 fine.
- Mont Gleason, Quebec will build a fixed grip quad with loading carpet next summer.
- The Iron Mountain Tramway in Glenwood Springs is carrying its final riders next Sunday as Leitner-Poma mobilizes to build an improved gondola this winter.
- Thanks to Jared Emerson for taking me around the newest North American lift by LST Ropeways at Waterville Valley. She’s a beauty!



