Alterra to Build New High Speed Lifts at Alpine Meadows & Winter Park

Alterra Mountain Company will spend $181 million on capital improvements at its network of resorts this offseason, $32.3 million of which will go towards new lifts.  The announcement comes on the heels of competitor Vail Resorts’ proclamation that it will devote $139 to 143 million to capital projects in 2019, including new lifts for Crested Butte and Stevens Pass.

At Colorado’s Winter Park Resort, a new Leitner-Poma six-pack will replace the Sunnyside triple, increasing uphill capacity by 800 people per hour and reducing ride time from eight minutes to 3.8.  Sunnyside is a 1989 CTEC that provides egress from Parsenn Bowl and often experiences significant wait times.

img_5566
The Sunnyside triple is being retired but will likely find a new home due to its age.

In California, Squaw Valley Alpine Meadows will debut the first Leitner-Poma of America LPA detachable to feature an intermediate station.  The approximately 5,000 foot quad lift will follow the current Hot Wheels alignment with an offloading opportunity at the current top terminal site.  Chairs will continue one minute further to Sherwood Ridge for direct access to the backside of Alpine.  The first Leitner-Poma lift at Alpine Meadows will move a total of 2,400 skiers per hour between the three stations and cost approximately $10 million.  “The new lift will benefit the Alpine Meadows experience on many levels,” said Ron Cohen, president and chief operating officer at Squaw Valley Alpine Meadows. “Terrain currently served by Hot Wheels is frequently used by learners and ski and ride school as the next progression after the beginner terrain in the base area. A detachable lift will make loading and unloading much easier for these groups, and the ride time will be more than cut in half. Alpine Meadows is a fantastic place to learn how to ski, and I am proud that we are continuing to foster that quality.”  Squaw is also adding new rope tow and carpet lifts in the High Camp area to further improve beginner options and skier circulation.

IMG_8922
This photo, taken from near the new Hot Wheels top terminal location, shows what will become the first stage of a two stage high speed quad.

As announced at the beginning of the winter, Doppelmayr will complete the Steamboat gondola rebuild this summer, adding new towers, all new cabins and more.  With a speed increase, this key out-of-base lift will feature an increased capacity of 3,600 skiers per hour.

Another significant lift-related investment is RFID access gates and ticketing infrastructure at Deer Valley Resort.  Other Alterra properties are getting snow cats, expanded snowmaking capabilities, restaurant remodels and new bike trails.  “Alterra Mountain Company’s unique year-round mountain destinations offer skiers, riders and summer visitors of all ages from all over the world special, memorable experiences, and each aspect of our business plays a part in bringing the guest back year after year and inspiring a lifelong love of the mountains,” said Rusty Gregory, Chief Executive Officer of Alterra in a company-wide press release.  “We are committed to investing in everything from lifts to snowmaking to creative dining experiences, and technology that weaves it all together for a seamless visit.”  The privately-held firm has budgeted more than half a billion dollars for capital improvements through the 2022/2023 ski season.  All 13 Alterra destinations participate in the Ikon Pass, which starts at $649 and goes on sale tomorrow morning.

News Roundup: Rope Time

  • Searchmont, Ontario sells to Wisconsin Resorts, the firm behind Pine Knob, Mt. Holly and Ski Bittersweet in Michigan as well as Alpine Valley, Wisconsin.
  • Mike Solimano of Killington reveals what three lifts he would upgrade if given $100 million to spend at The Beast.
  • The new Winter Park gondola is creatively named Gondola.
  • Grand Junction’s NBC affiliate takes viewers inside the factory where Leitner-Poma lifts are created.
  • The two stage Blackcomb Gondola is almost finished; thanks Max for these pictures.
  • Next up for Ramcharger 8 at Big Sky: installation of an in-terminal video wall and the haul rope, which is going up right now.
  • Beech Mountain commissions its twin fixed grip quads.
  • Freeskier looks at Alterra’s whirlwind growth and future trajectory.
  • Rope pulling commences tonight at Walt Disney World, 24 years to the day since the Disneyland Skyway cable was taken down for good.
  • This week’s new trail map comes from Hunter Mountain.
  • In an act of sabotage, someone cuts into three haul ropes at a Pyrenees ski resort.

News Roundup: A World Away

  • As Vail Resorts shakes up management in the northeast, outgoing Mt. Sunapee GM Jay Gamble reflects on 20 years of growth including four new lifts and 110,000 annual skier visits.
  • Vail also says goodbye to Sunapee’s Duckling double after 55 years.
  • The owner of Mt. Washington, British Columbia; Ragged Mountain, New Hampshire; Wisp, Maryland and Wintergreen, Virginia takes over operations at Powderhorn, Colorado.
  • Propelled by five major projects in Colorado, Leitner-Poma says 2018 is it biggest year ever in the United States.
  • The $2 billion Salesforce Transit Center in San Francisco, which features a short aerial tramway, is mired in problems unrelated to the lift.
  • Construction begins in Switzerland for the world’s second longest 3S with the most towers – seven.
  • With new six and eight passenger lifts, Big Sky Resort shifts away from the double/triple/quad lift lingo.
  • Alterra names KSL veteran Adam Knox Senior Vice President of Strategy and Corporate Development to lead the company’s acquisitions and resort partnership group.
  • Due to the amount of lift work needed after seven shuttered years, Cockaigne, NY won’t reopen this winter after all.
  • One of the longest Riblets retired from Snowmass turns up in the Pakistani town where Osama bin Laden was killed.
  • A freshly cut lift line is spotted in the Spanish Peaks development adjacent to Big Sky Resort, probably for the planned Highlands chair.
  • The Berkshire Eagle looks at Catamount’s $5 million fall.
  • A judge quashes spending for lift maintenance at the Hermitage Club, which remains in foreclosure.  A new lawsuit against the ski area alleges breach of contract and consumer fraud.
  • Another aerial tramway cabin crashes in Europe, this time on the one year old Bartholet jigback Staubernbahn.  No one was hurt as the cabin that hit the ground was empty.
  • The Boston Globe talks with Mainers about a fourth winter without Saddleback.
  • In New Zealand, The Remarkables is set to build the inaugural D-Line in the southern hemisphere and Coronet Peak announces a Leitner Telemix.
  • The new Bretton Woods trail map indicates the gondola may not be called Presidential Bahn after all.
  • As Copper Mountain and Leitner-Poma crews work hard to finish two big lifts, opening weekend shifts to Super Bee.

Leitner-Poma & Skytrac to Build New Lifts in Outback Bowl at Schweitzer

DqXR5VkWwAABqMv

The beloved Snow Ghost double will be retired from Schweitzer Mountain Resort next spring after 47 winter seasons, the mountain confirmed today.  In its place, two new chairlifts will service Outback Bowl in improved alignments.  A Leitner-Poma high speed quad will climb through the Kaniksu Woods area with a Skytrac fixed-grip triple servicing the Lakeside Chutes vicinity above.  “Overall, we expect the two chair arrangement to complement our existing lift system and provide better access to some of the most popular terrain at Schweitzer,” says Tom Chasse, CEO of the north Idaho mountain.  Schweitzer completed a similar project on the front side in 2007, replacing 5,500 foot Chair 1 with the Basin Express and Lakeview lifts.

schweitzer 144
Snow Ghost is a very long Riblet double with more than 30 towers.

The detachable quad chair will offer a capacity of 2,400 skiers per hour and rise 1,447 feet in just over five minutes.  The triple chair capacity will be 1,800 per hour with a vertical of 1,360 feet and an 8 minute ride time.  “We’ve seen over the years how a similar two lift system in the South Bowl has been beneficial when we have weather challenges,” said Chasse. “By having the two lifts serving different aspects of the North Bowl, our hope is to combat similar challenges on the backside of the mountain.”  As part of the project, Schweitzer will add gladed terrain and four new runs surrounding the new lifts, which have yet to be named.

Loveland Takes the Detach Plunge with Chet’s Dream

IMG_6006

Two of the five biggest American ski areas without detachable lifts will leave the club this year.  They are Loveland and Taos, both coincidentally adding bright blue Leitner-Poma high speed quads to serve as out-of-base workhorses.  Along the Continental Divide at Loveland, the newly-named Chet’s Dream is the third chairlift to follow the Lift 1 line, carrying on the legacy of a Heron double and later a Lift Engineering triple.  Family-owned Loveland ordered this lift early as 1 is usually among the first in the country to open for skiing in October.  “It’s a big deal for both us and our guests,” Marketing & Communications Director John Sellers told me when I visited last week.  “This lift will be in operation for the next few decades and we are excited to offer the increased speed and reliability to our customers for years to come.”  With towers all flown  and the rope going up shortly, the project is right on schedule.

Chester “Chet” Upham, Jr. joined Loveland in the 1950s and was instrumental in building the original Lift One, the third chairlift in Colorado.  He bought out his partners in 1972 and the Upham family continues to own Loveland today.  Chet’s Dream is the work of former Loveland ski patroller Terry Henningson, who submitted the name as part of a contest this spring that received nearly 3,000 entries.  “Chet’s Dream stood out immediately as a way for us to honor a ski industry pioneer and the patriarch of Loveland Ski Area,” said John.  I’m told the most popular entry was Lift 1 followed closely by Lifty McLiftface.

Ride time will fall from eight minutes to three and the number of towers is down by four.  49 quad chairs will circulate on the bottom drive lift.  “Lift 1 was our workhorse and it had served us well for over 30 years. It was time for an upgrade and it was exciting to learn that our owners were considering a high-speed lift for its replacement,”  John told me.  Will it be the only high speed ride at Loveland?  “Lift 6 will be our next upgrade and that will remain a fixed grip.  As for future upgrades and any new potential lifts, we will have to wait and see what happens.”

At Arapahoe Basin, The Beavers Get a Lift

IMG_1235
Tower 12 of A Basin’s new Beavers lift will soon be flown to this foundation with a view.

Steep chutes, natural glades, a couple cruiser trails and wide open faces.  When Arapahoe Basin drops the ropes on The Beavers this year, there will be something for everyone.  Just under 350 new acres make it the largest lift-served terrain expansion on the continent for 2018-19, ahead of Mt. Spokane’s backside development and Hunter North.  The Beavers debuted for an earn-your-turns preview last season along with the Steep Gullies, totaling 468 acres of new terrain.  Installation of a Leitner-Poma fixed-grip quad chair, the Basin’s sixth chairlift, was in high gear when I stopped by yesterday.

A-Basin_1819_frontside

Topping out at 12,475′, The Beavers drainage is beyond beautiful and A Basin is taking great care to implement the project with as little disturbance as possible.  The quad drive terminal is the closest you can get by road and dozens of workers are readying the expansion by foot, helicopter and spider excavator.  Arapahoe Basin opted to do the development carefully over two years rather than rushing it in one, and it shows.  The two blue trails were traditionally cut while the rest of the new stuff is either above tree line or was thinned by hand.

Continue reading

The Gondola Era Arrives at Winter Park

Winter Park guests will soon enjoy direct gondola access to Sunspot in place of the Zephyr chairlift.

When holiday crowds catch a Cabriolet to The Village at Winter Park Resort this year, the second lift they’ll see is the resort’s first true gondola.  Capable of hauling 3,600 skiers per hour out of the base area, the new Zephyr lift replaces a 1990 high-speed quad that could do only 2,600 in a perfect hour.  Announced in March, the Leitner-Poma system will be similar to Vail’s Gondola One but with something totally new to the North American market: DirectDrive.

Sigma is fabricating 79 ten passenger Diamond cabins with the fresh Winter Park logo unveiled on Monday.  The $16 million gondola and new brand are just part of a $28.2 million capital drive this year in cooperation with Winter Park’s operator, Alterra Mountain Company.  Amazingly for a resort of WP’s size, this is the first new lift in ten years.  Snowmaking is also seeing mega upgrades and a new heated village plaza will lead seamlessly to the bottom gondola terminal.  The old Zephyr had 20 four passenger cabins used for restaurant access at night but the new version will be fully ADA accessible and operate day and night.

Continue reading

News Roundup: Color Choices

  • Some Alta land is withdrawn from a proposed land swap, maintaining the possibility of future expansion in Grizzly Gulch.
  • Killington goes blue with its bubbles.
  • Vail Resorts officially takes over Stevens Pass.
  • Massachusetts awards the current operators of Blue Hills a new three year contract.
  • Fatzer begins production of the first Compacta rope for the US lift market.  At 54 mm, any guesses where it’s headed?

News Roundup: Change of Plans

  • Mammoth seeks to replace the workhorse Canyon Express #16 with a detachable six place lift in a new alignment.
  • Plans for Battle Mountain Resort that once featured ten chairlifts and two gondolas near Vail no longer do.
  • Leitner-Poma’s self-driving mini aerial tramway in San Francisco will debut this summer.
  • A Grafton, Illinois gondola project faces a key vote with groundbreaking possible later this summer.
  • Partek will build a brand new quad chair this summer at West Mountain, New York.
  • Ghost Town – the defunct chairlift-accessed amusement park in North Carolina – may reopen in 2019.
  • A court rules in favor of plaintiffs in three Hermitage Club cases but is still considering next steps for the ski mountain foreclosure.
  • The latest Aspen Lift One meetings go well.
  • You probably heard Jerusalem in the news this week but not for the $56 million earmarked to build a four station gondola there.
  • Like the first one, the second Disney Skyliner terminal to go airborne has two distinct turnarounds.

Building a Better Lift One in Aspen

IMG_8222
The third time may be the charm as the Aspen community is set to weigh the future of the Shadow Mountain lift over the coming months.

Come November 6th, Aspen residents will vote for Governor, U.S. House, and likely whether a ski lift should return to the original base of Aspen Mountain.  SE Group and the City of Aspen today posted 61 pages of study on the new Lift One with a focus on where to site the bottom terminal, a question which has lingered since 1972.  Goals include retaining the historic structures of the first Lift One, threading the needle between two new developments, and improving skier flow.  An aggressive proposed timeline begins Tuesday with review by the City Council that could culminate with a new gondola-chair combination lift spinning by late 2019.  That would be 48 years after a shortened SLI-Riblet double dubbed 1A eliminated easy access for much of the town to Shadow Mountain.

img_8196
This is the primary lift for one of the few World Cup courses in America.

The current lift starts about four towers higher than the 1946 single chair did and, like its predecessor, has reached the end of its useful life following decades of service.  The International Ski Federation makes no secret the obsolete machine is a big reason why Aspen does not host World Cup skiing as often as some of its peers.

option1

But things are finally looking up – or actually down.  SE Group analyzed nine chondola, chairlift, surface lift and funicular options and ones dubbed Option 1 and Option 7 were identified for detailed study that commenced in February.  An A and B variation were added to alternative number 7, leaving four scenarios in play to bring the lift back into town.  Option 1, shown above, would put the bottom terminal level with Gilbert Street between the old Lift 1 terminal and the “new” one.  Because of space constraints with Aspen Skiing Company’s preferred Telemix (chondola in Poma parlance), the lift would likely be a straight gondola or possibly a detachable chairlift.  Skier access from above would be excellent but the public would have a 40-foot vertical climb to get to the load point from town.  Furthermore, the developer of the proposed Lift One Lodge would have to give up an entire building worth of units.  The historic lift terminal and remaining towers from the first Lift One could be retained, which is an important community objective.  This is deemed a viable, but not best option.

Continue reading