- Mt. Hood Meadows, Skytrac and Timberline Helicopters fly Buttercup towers in just 45 minutes.
- Vail Resorts schedules annual meeting for Wednesday, December 6th, where multiple new lift projects are likely to be revealed.
- Aspen Skiing Company, the City of Aspen, private landowners and the public collaborate towards building a long-sought detachable Lift 1.
- Latest LST detach update: chairs are back at the factory being reworked and the Envers lift is expected to be up and running around Christmas.
- Revelstoke adds 24 new gondola cabins, Crystal Mountain gets five more.
- Navajo Nation leadership soundly rejects Grand Canyon Escalade gondola in 16-2 vote.
- SkiCo and the Aspen Valley Ski & Snowboard Club plan to build a platter surface lift on the skier’s right side of Golden Horn at Aspen Highlands next summer.
- There’s an unconfirmed rumor that the Cyclone at Sunrise Park, AZ won’t operate this winter. The 1983 Yan is North America’s longest triple chair at 7,982′ with 32 towers and 352 chairs. I’ve reached out to Sunrise for comment and will update if I hear anything.
- Montana Snowbowl’s TV Mountain expansion won’t open this season.
- After building three new lifts in a row, the Hermitage Club finds itself in a cash flow crunch.
Vail Resorts
News Roundup: Dire
- Hemlock Mountain, BC re-brands as Sasquatch Mountain and eyes a high-speed quad to replace Skyline.
- Vail Resorts’ fiscal 2017 net income rose 40.6 percent and skier visits 20.1 percent over 2016 with Epic Pass pass sales trending 17 percent higher for 2017-18.
- Och-Ziff sells Mountain High back to previous ownership group.
- Frost Fire, ND won’t open this winter, citing the “dire” condition of its triple chairlift. The nonprofit mountain estimates $1.35 million is needed to buy a replacement. The statement makes no mention of the mountain’s other lift, a double chair with Poma components.
- Sugarloaf’s five year plan would turn the SuperQuad into a SuperSix in 2019, move the CTEC Stealth to Timberline and add a T-Bar to Brackett Basin in 2021.
- Kevin Mastin paints a new trail map for Whiteface.
- Belleayre’s gondola will feature a new rack design for snowboards and skis of different sizes.
- Steamboat Resort won’t operate Howelsen Hill.
- Resorts grapple with whether service dogs should ride chairlifts.
- Allen Peak Tram’s new tower is in at Snowbasin.
- Doppelmayr’s latest Wir magazine features Oakland’s new gondola and more.
News Roundup: Selloff
- Owing $3.8 million to creditors, Deer Mountain, SD to be sold to the highest bidder in a sheriff’s sale today. The mountain has two Riblet chairlifts.
- Curbed counts down 11 gondolas changing the way people move through cities.
- Steamboat sells off triple chairs from Four Points in 28 minutes (the lift got new Doppelmayr ones in 2012.)
- Taos offloads 200 chairs from lifts 5 and 6 for $200 each with proceeds going to hurricane relief. As of this writing, 37 remain.
- Leitner Ropeways’ new gondola at the world’s largest hotel transported 3.5 million passengers in its first eight months.
- Aspen Mountain installs Bluetooth speakers in Silver Queen Gondola cabins.
- China Peak completes its first quad chair, the old Elkhead from Steamboat.
- The Burnaby Mountain Gondola is back on the table.
- Leitner-Poma of America inks contract to build a US$7.1 million high-speed quad at Falls Creek in Australia.
- Vail Resorts launches interactive website with lift downtime and wait time data for last season at Vail, Beaver Creek, Breckenridge, Keystone and Park City.
- Belleayre’s gondola cabins arrive from across the pond. Unfortunately, the name of the lift is spelled wrong on all of them.
- Ski Magazine predicts the KSL-Aspen duo will benefit skiers with a second Epic-style season pass and major resort upgrades.
- Skytrac and Timberline Helicopters fly towers for the new East Rim lift at Whitefish. Thanks Buzz D. for these cool photos.
Will Vail Resorts Build Big in 2018?

If you follow the ski industry, mark your calendar for four months from now, the week of December 4th. Very early one morning that week, the largest mountain resort operator in the world will release its fiscal 2018 first quarter results and, more importantly to this audience, outline capital expenditures for 2018. Last year, this is the moment Vail Resorts committed to building three six-packs as part of $103 million in capital spending for 2017 (the company later added a fourth detachable to this year’s class, the Red Buffalo Express at Beaver Creek.) In December 2015, MTN announced a high-speed quad for Vail Mountain and in 2014, $50 million in improvements including three new lifts at Park City plus another six-pack at Vail. So, what might be on the likely $120+ million agenda for 2018?
Vail Mountain
- Game Creek Express #7 six-pack. The current 1985 version of Game Creek is the oldest operating lift on Vail Mountain and one of three remaining CLD-260 style Doppelmayr detachables there. It is likely to be replaced with a six-pack, increasing capacity by at least 25 percent in popular Game Creek Bowl. Of the recent six-pack upgrades at Vail, two were built by Doppelmayr (Avanti #2 and Mountaintop #4) and one by Leitner-Poma (Northwoods #11.)

- Orient Express #21 six-pack. Three years newer than Game Creek but still with DS grips, Orient Express serves some of the most popular terrain in Vail’s famous Back Bowls below the equally popular Two Elk Lodge. A six-pack upgrade would be the first such lift in the Back Bowls or Blue Sky Basin.
- Wildwood Express #3 six-pack. A 1995 CTEC, Wildwood is not as old as other detachables recently replaced at Vail, but it serves a high-traffic pod between Mid-Vail and its namesake Wildwood. Parts from this lift could be used as spares for Riva Bahn/Pride Express and Cinch, Bachelor, Grouse Mountain and Strawberry Park high-speed quads at Beaver Creek.
- Born Free Express #8 replacement. Born Free is the 1988 sister ship to Orient and runs parallel to the Eagle Bahn Gondola, built 1996. Vail could opt to address both lifts in the coming years with a gondola like Keystone’s or replace only Born Free with a new high-speed quad or six-pack.
- Golden Peak Race lift. In April, Vail submitted a master plan amendment to add a third lift on Golden Peak above the Riva Bahn mid-station. This short fixed-grip chairlift or surface lift would primarily serve an extended race course.

Beaver Creek
- Arrow Bahn Express replacement. Beaver Creek doesn’t see nearly the traffic that Vail does and has seen ten new lifts since 2000. However, Arrow Bahn Express is by far the oldest lift at Beaver Creek, built in 1988 to serve a separate Arrowhead ski area. A CLD-260 like Game Creek, Orient and Born Free but with lower hours for its age, Arrow Bahn might make it a bit longer.

Nowhere to Go But Up: The Keystone Master Plan

Of the dozen North American skier visit champions, only one mountain operates fewer than 15 lifts. Number one Vail has 25, number two Breck 23. Whistler and Mammoth spin even more. But the fourth most-visited ski area on the continent has only 13 lifts. That mountain is Keystone, an intermediate skiing mecca under 100 miles from Denver International Airport.
In 2009, Vail Resorts and SE Group updated the resort’s master plan, a road map for expansion over the coming decades. With eight new lifts planned for Dercum Mountain, North Peak and The Outback, Keystone’s plan outlines significantly more growth than slated for Vail’s other Colorado resorts. Much of the expansion would come above current lift service, adding high-alpine terrain to attract a broader spectrum of skiers and snowboarders to Keystone.
Dercum Mountain
- Ski Tip Gondola. A new Ski Tip portal is planned with a 3,400′ x 1,154′ two-way gondola that could transition approximately 18 percent of skiers away from the crowded River Run and Marmot portals. Skiers would ride the gondola to a point above the River Run Gondola mid-station and return there at the end of the day to ride back down. Critics have suggested this gondola is merely a real estate play.
- Two-stage Argentine high-speed quad. A new high speed quad could replace Argentine and continue to a point near the Dercum summit with a mid-load angle station in the vicinity of the former Saints John and Ida Belle lifts. Three new trails would be cut between Peru and Montezuma. The mid-station would take pressure off the crowded Lower Schoolmarm trail and Peru Express.
- Summit Learning Center Lift. A new fixed-grip triple chairlift is proposed to connect the top of the new Argentine to the top of the mountain between Ranger and Montezuma. This would be the seventh lift to serve the summit of Dercum Mountain. With the new triple’s 1,000 skiers per hour, a whopping 16,800 people could theoretically unload at the Summit House in one hour.
News Roundup: Shuffle
- Bridger Bowl is sending Virginia City up to Teton Pass.
- Oakland Zoo’s California Trail gondola
opened Mondaywill open soon. - China Peak will replace Chair 2 with a Yan quad from Steamboat this summer.
- The Subway in the Sky celebrates three years.
- Alyeska is removing its oldest, longest and tallest lift with no replacement immediately planned.
- Eldora’s new six-place has a name: Eldo Express.
- Cranmore is moving the bottom terminal of the South Quad to make room for a real estate project.
- Intrawest shareholder sues to stop Aspen Skiing Co. and KSL purchase.
- Vail-Stowe deal closes.
- Vail Resorts says in its third quarter results that Epic Pass sales are up 10 percent over last year. The company typically announces new capital projects just after Epic Pass sales conclude in late November.
- The Indiana State Fair is getting a chairlift.
- Beartooth Basin’s two platters open for summer turns for the first time since 2014.
- Urban gondolas are changing the world.
- Leitner Ropeways finishes its newest urban gondola in Mexico.
News Roundup: Interalpin
- Revelstoke homeowners aren’t happy lift development has stalled for almost ten years now. The resort’s response identifies master plan lifts 1 and 11 as the highest priorities but notes construction of them is subject to market demand.
- In an interview, new Crystal Mountain owner John Kircher says he wants to build a second gondola to Campbell Basin.
- NY State Fair gondola continues to be targeted as an example of government waste.
- Whaleback’s T-Bar project is a go. The lift came from Plattekill, NY and will be installed by SkyTrans.
- New Gatlinburg Sky Lift looks to be almost finished.
- Poma reaches agreement to build new gondolas in Vietnam with the first next-generation Sigma Diamond EVO cabins introduced yesterday at Interalpin. The new cabins offer more natural light and feature doors that slide rather than opening out.
- Move over D-Line: the new Leitner Station is here.
- LST gets another detachable contract.
- Leitner launches urban gondola in Berlin.
- Skier visits at Vail Resorts were down 2.8 percent this season but lift ticket revenue increased 7.4 percent.
- Mi Teleférico opens $1.5 million Operations Control Center with 22 people monitoring 1,300 surveillance cameras on 66 screens and lightning detection system for four gondola lines.
- Purgatory will add a mid-station to its Needles triple this summer.
News Roundup: Colorado
- An in-depth look at the history of urban gondolas and what comes next.
- Buttermilk will open with full skier services and groomed runs April 8-9 but with no lifts.
- Hesperus reopens following two week closure to address deferred lift maintenance.
- Steamboat Ski & Resort Corporation proposes operating Howelsen Hill.
- Giants Ridge puts a Riblet up for sale in advance of new lift construction. Another will be scrapped. Buttercup at Mt. Hood Meadows is also for sale.
- Vail Resorts revenue up 27.5% year-over-year; no new lifts for Whistler-Blackcomb in 2017.
- New Stagecoach website says two Doppelmayr chairlifts now on track to open in late 2018.
- PCL Construction Services files notice of commencement for utility relocation and prep at six Walt Disney World sites widely believed to be gondola station locations with possible opening in 2019.
- Belleayre gondola likely a go for this summer.
- Wolf Ridge, NC closes for the season following lightning damage to 1988 Doppelmayr quad. The place has an interesting past; a 2006 Doppelmayr CTEC quad and 1980 Borvig were both abandoned after a 2014 fire and only two lifts remain.
- Mexico’s latest gondola gets cabins.
- Poma moving to new headquarters in France.
- Uinta-Wasatch-Cache National Forest approves Alta Supreme and Snowbasin Strawberry/Wildcat high speed quads.
- Moose charges lifties and guests at Alyeska, gets killed.
- Mi Teleférico’s blue line broke its own record last weekend carrying 64,275 passengers over two days.
- First look at a burned-out Christchurch Adventure Park shows some quad chairs were saved, haul rope was not.
- Another urban 3S idea pops up in metro Vancouver.
- Latest Aspen Mountain Lift 1A replacement plan to go before the City Council this month.
- Taos will apparently build three new lifts over the next two years, including a pulse gondola and high speed quad.

News Roundup: Inaugural
- The Aspen Times dives deep into lifty life.
- President of Peru inaugurates long Poma gondola to an ancient fortress.
- Mi Teleférico’s $75 million Blue line moved 41,000 passengers on opening day Friday.
- Mt. Lemmon’s main chairlift has been closed all season following tree damage from an early-season storm.
- Galaxy at Heavenly and High Country at Waterville Valley also see extended downtime.
- Emirates Air Line to close for annual week of maintenance.
- The most powerful man in skiing isn’t sold on bubble chairs (plus many other insights from Vail Resorts.)
- Whistler Blackcomb, Jackson Hole and Big Sky make CNN’s most extreme lifts.
- New Zealand’s first chondola on track to open this year.
- Permit filed Monday shows another probable station for rumored five-stage Disney World gondola system (updated potential alignment here.)
- Doppelmayr gets underway building the new Gatlinburg Sky Lift; aggressive timeline shoots for late April opening. Leitner-Poma is building a chondola across the street.
- Two-stage gondola in one of the world’s oldest cities looking more likely.
- Two skiers injured in fall after tree hits their gondola cabin.
- 130 rope evacuated after Italian chairlift de-ropes in crazy winds.
- Snowbasin and Sugarbush join the Mountain Collective, former member Whistler-Blackcomb goes Epic with Stowe to follow.
- Bogus Basin plans to replace Morning Star…in 2020.
News Roundup: Setbacks
- Oakland Zoo’s California Trail gets North America’s first safari-style Omega cabins.
- Vail purchase could mean replacements for Toll House, Lookout and Mountain at Stowe.
- Denver station reports new complaint filed against Ski Granby Ranch last week, though details are sparse.
- Hesperus Ski Area voluntarily closes, possibly for the season following unannounced visit by Colorado Passenger Tramway Safety Board inspectors. Hesperus similarly closed for a season in the mid-1990s after being found to be running the same lift without an operator.
- Cherry Peak finally opens Sundays, still has not completed promised Summit lift.
- Setbacks pile up for the Grand Canyon Escalade.
- Emirates Air Line ranked highest in customer satisfaction among Transport for London modes and is the only one to turn a profit.
- Sweden once had a material cableway that stretched 26 miles.
- Squaw Valley/Alpine Meadows, taking a beating on social media, explains why the Headwall lift has been closed all but 16 days so far this year.
- Mexican city of Zacatecas seeks to re-hang its old tramway cabins, further delay execution of its contract with Poma for a new gondola system.
- Urban gondola story makes the front page of the Seattle Times.
- The new urban aerial tram in Brest, France is a hit, seeing 6,000 rider days.
- Whistler Blackcomb’s Master Development Agreements renewed and Master Plan approved.
- Suit seeks at least $75,000 from Sugar Mountain, where a teenager apparently went around a bullwheel at closing time, became stranded and jumped from a chair overnight last season. edit: Resort says rescuers were close by when teen jumped.
- The Georgetown-Rosslyn Gondola idea lives to fight another day.
- Outside profiles James Coleman and his commitment to improving the ski experience at five Southwestern resorts.
- Snow King Mountain abandons plans for East side lift, will try for backside lift instead.


