- Doppelmayr USA’s Katharina Schmitz joins the Ski Utah podcast to talk lift technology, next year’s projects and more.
- According to Forest Service documents, Alta plans to replace Sunnyside and Albion this summer with a single six place chairlift.
- Sierra at Tahoe President John Rice takes SAM podcast listeners through the harrowing Caldor Fire disaster and recovery effort.
- White Pine, Wyoming is sold to new owners.
- Kimberley announces the Northstar Express will be inoperable for the entire season following last month’s fire.
- Vail Resorts says Stevens Pass faces its most acute staffing problems, replaces the General Manager the same day as a Seattle Times front page story comes out.
- Nine people successfully catch a child who fell from a chair at Mt. Washington.
- Big White seeks more parking at the Black Forest base in advance of two planned lift installations.
- Steamboat repairs the Sunshine Express; Storm Peak Express lives up to its name.
- Mt. Bachelor will be without the Skyliner Express for an indefinite period.
- Keystone closes the River Run Gondola for three days of maintenance (now back open).
- Redevelopment of the Meadows parking lot at Steamboat could include replacing the Wildhorse Gondola with a higher capacity detachable.
- BigRock Mountain’s quad chair fundraising gets off to a strong start.
- Vail Resorts and Park City ski patrollers reach a tentative contract agreement, likely avoiding a strike.
- Despite the headlines, Vail Resorts’ skier visits are actually down from the last two seasons as of January 2nd. Ski school, dining and retail/rental revenue are all up from last year but still down significantly from pre-Covid 2019-20.
Doppelmayr
Celebrating a Year of Resilience
As clocks roll over to 2022, 42 new lifts stand tall across North America. Lift manufacturer and resort employees accomplished a lot – operating through the pandemic and adding 13 more lifts than the year before despite supply chain bottlenecks and record low unemployment. Nearly all pandemic-postponed projects from 2020 were completed thanks to skiers, mountain bikers and sightseers flocking outside this year.
The 2021 lift class ranges from used T-Bars to the East’s first eight place chairlift and three new gondolas. Vail Resorts purchased the most new lifts of any single customer with seven projects across five mountains. Okemo moved a bubble detachable quad from Jackson Gore to the summit and added a six pack in its place. At Beaver Creek, a high alpine expansion will soon debut with two new quad chairs. Just as Vail’s construction projects entered the home stretch in September, the company shocked the industry and announced 19 new lifts would be built across its network in 2022. That number grew even further this month with the addition of two more projects in Pennsylvania as part of the Epic Lift Upgrade.
Boyne Resorts moved forward with two signature Doppelmayr D-Line lifts at Loon Mountain and Big Sky Resort. Boyne also worked to open a new peak at Sunday River dubbed Merrill Hill, serviced by a Sunday River Red triple chair. Seeing how smoothly its pandemic-postponed projects went, Boyne went ahead and announced three 2022 lifts early for Boyne Mountain, Loon Mountain and Sunday River.
No new lifts debuted at Alterra mountains this year but the growing company’s pause won’t last long. Leitner-Poma completed the towers and terminal foundations for the Base-to-Base Gondola, which will be one of the most unique lifts in America when complete next year at Palisades Tahoe. The project includes four stations, three haul ropes, more than 30 towers and a cabin storage facility. Alterra also has grand plans for new lifts at Steamboat including North America’s longest gondola.

This year’s projects were dispersed all across the US and Canada with particular strength in the traditional Rocky Mountain and Northeast markets.

2021 saw a roughly even split between fixed and detachable lifts with both increasing from last year. Gondolas took a slight pandemic pause again but will be back in a big way next year with Palisades Tahoe, Steamboat, Whistler all planning large installations. No resorts built aerial tramways in 2021 but two new surface lifts debuted.
Fifteen years ago, around half of new lifts were for expansions while the other half replaced older ropeways. The share of replacement equipment has only grown, making up nearly three quarters of all projects this year. We said goodbye to many lifts from defunct manufacturers in 2021 with 12 Halls, 6 Borvigs and 3 Heron-Pomas being retired this year.
The detachable business split right down the middle with Leitner-Poma and Doppelmayr each completing eight lifts. Things will get interesting next year when MND Ropeways completes its first US detachable at Waterville Valley in partnership with Swiss manufacturer Bartholet. The last time three firms competed in the detachable space Amazon only sold books.


The fixed grip side of the business also split roughly evenly with Skytrac edging out Doppelmayr. Skytrac fabricated eight complete lifts plus two retrofit Monarch drive terminals, the most projects ever in one year for the company. Doppelmayr’s Alpenstar model continued to be popular with seven installations.

We saw the ski industry recover faster from the pandemic than other segments of the travel and tourism world. Only two installations were at places other than ski areas in 2020 and 2021, both gondolas at the Icy Strait Pont cruise port in Southeast Alaska.
The percentage of lifts installed used remained low this year with just seven reinstallations. Most customers opted for brand new machines from four different manufacturers.
Doppelmayr won the total project count with 18 installations while the Leitner-Poma/Skytrac duo installed 16. Partek completed a new quad chair at Trollhaugen, Wisconsin after a on-off year with no projects in 2020.
Projects in 2021 were incredibly diverse, from the tiniest platter at a new Club Med in Quebec to Big Sky’s Swift Current 6, the longest D-Line chairlift in the world. The below chart shows Leitner-Poma and Skytrac roughly split their business of large lifts and small lifts while Doppelmayr covered the entire gamut of Vertical Transport Feet per Hour under one roof.
The lift companies enjoyed a great year and so did Lift Blog. A record 617,000 people visited this website in 2021 and viewed 3.6 million pages. Next year I should finally finish visiting every US ski area, a milestone I’ve been chasing since I was four years old. There’s so much to look forward to in the lift world in 2022 and I hope you follow along as I do my best to cover it all. Happy New Year!
News Roundup: Many Uses
- Cranmore announces an over $1 million overhaul of the Skimobile Express to take place next summer.
- Granite Gorge’s owner says he’s unlikely to reopen skiing.
- Catamount and Berkshire East owner Jon Schaefer explains his strategy of relentless capital improvements.
- Park City Canyons Village skiers get stuck for a few hours when the Red Pine Gondola goes on wind hold.
- In Japan, a gondola lift doubles as a device to cure salmon.
- Carrabassett Valley Academy seeks to raise $1.6 million to build a T-Bar at Sugarloaf next summer.
- In other Sugarloaf news, pieces of Big Sky’s former Swift Current reportedly begin arriving.
- Telluride confirms it has ordered a Doppelmayr detachable quad to replace Plunge/Lift 9 in 2022. The existing triple will be sold to another resort.
- Chairs for Welch Village’s new Cannon Valley Quad arrive after a delayed journey from Asia through Canada.
- Alyeska’s tram will remain closed through December due to ongoing maintenance.
- Doppelmayr says its global market share stands at 55 percent.
- The gondola at Busch Gardens Tampa Bay will reopen in Summer 2022 after a more than two year Covid closure.
- An interesting tidbit from the Colorado Passenger Tramway Safety Board: a suspected bullet damaged the haul rope of Game Creek Express at Vail, requiring a repair.


- Vail Resorts sells more than 2.1 million season pass products, 700,000 more than last year.
- The 2022 Epic Lift Upgrade expands from 19 to 21 projects with additional lifts announced for Jack Frost and Big Boulder.
- Indy Pass will add yet another Western resort next week.
- Former Palisades Tahoe President Andy Wirth signs on to advise Alpine-X.
- Sundance says the Outlaw Express opening is delayed until December 22nd due to weather and construction timing.
- Doppelmayr flies towers in December for Juniper at Lake Louise, set to open in January.
- Steamboat considers a fourth gondola connecting the base area to town, Greenhorn Ranch will include a chairlift and eight passenger chairs are in play for future lift replacements.
- Maine’s Bigrock Mountain fundraises to purchase a Doppelmayr quad.
- Les Otten partners with Provident Resources Group to revive the Balsams redevelopment (same firm involved in reopening Big Squaw, Maine.)
- Boyne Highlands becomes The Highlands at Harbor Springs with lift improvements planned, starting with the southern end of the mountain.
News Roundup: Black Friday Edition
- It’s official: Sun Peaks retires the West Bowl T-Bar with planning underway for future lift access.
- A chondola is proposed to replace Dreamcatcher at Grand Targhee Resort.
- Mount Snow’s 2022 detachables will cost a combined $11.8 million and be constructed by Doppelmayr.
- Walt Disney World reveals it studied nine different layouts with up to four different lines before it built the Disney Skyliner.
- Bousquet debuts an all-new trail map. Nordic Valley too.
- Doppelmayr faces supply chain delays at Sundance; another resort will loan used chairs for the Outlaw Express until new ones arrive in January.
- Catamount also cites supply chain delays and expects to open its two used chairlifts around Christmas and Martin Luther King weekends, respectively.
- Crotched Mountain renames Park lift to Rover.
- Belleayre changes Tomahawk to Lift 8.
- Utah’s Eagle Point eyes building a 5,500 foot connector lift.
- Sunrise Park will reopen its summit lodge this season and plans to reactivate the Cyclone triple next winter.
- Whistler Blackcomb’s replacement of the Creekside Gondola is now a 10 place rather than the originally announced eight.
Utah Olympic Park to Add High Speed Quad

The fourth chairlift at Utah Olympic Park will be its largest to date, spanning 3,300 feet and utilizing detachable technology. Utah Olympic Legacy Foundation Chief Operating Officer Calum Clark announced the exciting news at Park City Ski & Snowboard’s annual meeting Tuesday. Clark said a deposit has already been paid to Doppelmayr, noting lift manufacturers are already very busy and early contract signing secures a favorable spot in the 2022 production queue.

The Uni-G detachable will rise approximately 1,170 vertical feet and service two trails to start. The new West Peak terrain will feature state of the art snowmaking from SMI and LED lighting. Construction is slated to begin in the spring with completion targeted for December 2022.
Ski Wentworth Announces New Chairlift
Nova Scotia’s largest ski area will debut a second base-to summit quad chair late next year in partnership with Doppelmayr Canada. The mountain currently features a 1987 quad chair and a 1960s-era Poma T-Bar. “This is a game changer,” said Leslie Wilson, Ski Wentworth President and General Manager. “It’s been a long time coming, but the timing was right now to make a major investment and take Ski Wentworth to the next level, setting the stage for potential four season development.” The fixed grip quad will rise approximately 750 feet over a nearly 4,000 foot slope length.
A little-known fact is Ski Wentworth had two quads throughout the 1990s. One of them was later sold and moved to Morin Heights, Quebec. Therefore it’s particularly fitting that the ski area will once again feature two chairlifts. “Now is the time to continue to the next phase of Ski Wentworth’s development as the region moves towards the post-pandemic era,” said the resort. “As a result of a renewed focus on promoting local tourism to Nova Scotians and Maritimers, a burgeoning tourism shoulder season mountain biking, development of new tourism products and an increasing awareness of healthy, outdoor lifestyles, Ski Wentworth is primed for the future.”
News Roundup: Life Behind Lifts
- Gunstock teases a multi-lift expansion with details to come in December.
- Magic Mountain won’t have summit access until at least December 18th due to ongoing lift projects.
- A CBS primetime reality show features an hour of ski area maintenance!
- Kirsten Lynch takes over as CEO of Vail Resorts.
- Sierra-at-Tahoe eyes an early 2022 reopening.
- A Mayflower construction update.
- Doppelmayr releases a new Wir magazine.
- The Cascade Skyline Gondola proposal gains a key endorsement.
- The final logging take place for the Eagle Peak expansion at Lookout Pass.
- Whistler Blackcomb highlights this summer’s big ticket lift maintenance projects.
- Sundance names two new quads Outlaw Express and Stairway.
- MND reports improved results with lift and snowmaking sales up 32 percent.
- Alberta Parks says it will open Hidden Valley this season in the absence of a private operator.
- Hickory, NY looks likely to reopen after six seasons.
- Big Sky’s new map is out showing Swift Current 6.
Eight Seater Coming to Sunday River’s Jordan Bowl
Doppelmayr will build the fastest eight place chairlift in North America for the 2022-23 season, a Sunday River Red bubble chair in Jordan Bowl. Dubbed Jordan 8, the lift will feature the world’s first red-colored bubbles along with heated seats, a loading conveyor and direct drive. Jordan 8 will spin a blazing 6 meters a second, shaving a minute off the ride time of the current Jordan Bowl Express and transporting 3,200 skiers per hour. “We are proud as a team and so excited to bring the latest Doppelmayr technology to Sunday River,” said Stephen Kircher, CEO of Boyne Resorts. “With each milestone in the Sunday River 2030 plan, Boyne Resorts is enhancing the experience across the board with major investments in infrastructure.”
The current Jordan high speed quad will be refurbished to replace the Barker Mountain Express for winter 2023-24. Some may wonder why Jordan for a D-Line lift rather than Sunday River’s original peak with an older detachable quad. The answer lies in Jordan Bowl’s popularity with guests, the amount of wind and snow it sees as well as the fact Sunday River owns thousands of acres next door. The Jordan/Oz peaks and future terrain beyond will be known henceforth as the Western Reserve. “The Jordan 8 is a significant jumping off point for the Western Reserve, creating a portal that could double our skiable terrain in the coming decades,” said Dana Bullen, President of Sunday River. “This lift also acts as an immediate catalyst for upcoming renovations to the Jordan Hotel, new activities and amenities.” Both Jordan 8 terminals will feature glass weather protection, allowing all 60 chairs to be parked without a separate storage building. Each chair weighs 2,262 pounds, making the lift wind resistant during storms.
Jordan 8 is the third major lift project announced by Boyne Resorts for 2022. Also in New England, the company is relocating the former Kancamagus detachable quad at Loon Mountain to replace Seven Brothers. Last week, Boyne Mountain unveiled plans for Disciples 8, the Midwest’s first eight passenger chairlift. When Disciples 8 and Jordan 8 open next winter, Boyne Resorts will operate eight seat chairlifts at four of its nine mountains and 80 percent of all the eight seaters in the United States.
Telluride Outlines Four Planned Lift Projects
Telluride Ski & Golf owners Chuck and Chad Horning hosted a community meeting tonight, outlining a nine figure capital plan for the next five to ten years. While no lift contracts have been signed, Telski officials revealed they are close to a deal with Doppelmayr for a new detachable quad and are working on three additional projects to be built in seasons to come. Telluride also outlined new employee housing and hotel initiatives which are key to supporting future growth.

The first new chairlift in 14 years will likely be a detachable quad replacing Plunge, Lift 9. The triple chair’s ride time exceeds 13 minutes and the $8 million quad would carry 1,800 skiers per hour, up from 1,200. The Hornings said they would like to ink a deal with Doppelmayr in the next few weeks but that plan may depend on community support for tourism in two November 2nd ballot questions regarding short term rentals.

The second project Telski officials discussed was an up-gauge of the Village Express to a six place. This out-of-base workhorse would likely feature wider chair spacing than the current detachable quad, allowing for fewer stops and more efficient loading. Also on the roadmap for replacement is Sunshine Express, once the longest high speed quad in the world. A modernized chairlift would run $9 or 10 million but the resort is considering building an even more costly multi-stage gondola. Like many of its competitors, Telluride wants to shift ski school operations to the upper mountain, which would require a beginner-friendly gondola. If built as a gondola, Lift 10 would likely include an intermediate station at The Market and Mountain Village parking garage. The lower section of the gondola could run independently in the summer to complement the existing three section gondola operated by the town of Mountain Village. Discussions are ongoing about that project and the future of the aging Telluride-Mountain Village gondola system in general. Finally, Lift 7 is on the radar to be replaced with a higher capacity fixed grip lift at a cost of around $3 million.
All told, the Hornings are looking at spending $35 million on lifts. Ownership said Telluride will remain a Doppelmayr mountain with fixed grip, UNI-G and D-Line options all under consideration. They noted global steel and copper demands are impacting lift prices but both parties are eager to make a deal.
Boyne Mountain to Launch Midwest’s First Eight Seat Chairlift

Boyne Resorts’ commitment to modernizing lift infrastructure across its properties will continue in 2022. The company today announced construction of Disciples 8, an eight place chairlift replacing Disciples Ridge and Disciples II at Boyne Mountain. The Doppelmayr D-Line system will feature a direct drive, auto locking safety bars and a loading conveyor, though no bubbles due to its 3.2 minute ride time. D8 will be Boyne Resorts’ third eight passenger chairlift following installations at Big Sky Resort in 2018 and Loon Mountain this year.
Boyne Mountain has been a center of lift innovation ever since it opened with the Midwest’s first chairlift in 1948. From there, Boyne introduced the world’s first quad in 1964 and installed America’s first high-speed six person chairlift in 1992. “Boyne Mountain started our company’s 75 year journey in the ski and resort business, and we are excited to again build on its incredible foundation of innovative industry firsts with the next generation of attractions and our heritage of elevating the Midwest resort experience,” said Stephen Kircher, CEO and president of Boyne Resorts. More information on other improvements announced today can be found here.
Future lift upgrades are planned for Meadows, Super Bowl, Victor, Boyneland and the Mountain Express, which will create the Midwest’s most advanced lift system.






















