Big Sky to Transform Base-to-Summit Lift Experience

The final chapter of Big Sky 2025 will be the largest yet, with a new gondola and tram connecting Big Sky Resort’s Mountain Village to Lone Peak. This multi-year project will cement Big Sky as a leader in lift technology among North American resorts.

Big Sky embarked on the 2025 initiative six years ago to enhance the mountain experience with a focus on lifts and dining. Boyne Resorts partnered with Doppelmayr to bring North America’s first eight place and fastest six place chairlifts to Big Sky in 2018 and 2021 and now the companies will build two more signature lifts leading up to 2025.

A new Explorer Gondola will load at the north end of the village and replace Big Sky’s last remaining original Heron-Poma lift which turns 50 next year. Together with Ramcharger 8 and Swift Current 6, three high capacity D-Line lifts will all load in the village. An intermediate gondola station will house a new ski school center and underground parking for cabins. This station will also include a direct drive powering both gondola haul ropes via a double-grooved bullwheel. Cabins will turn 22 degrees before ascending to a second new lodge near the top of Big Sky’s original Gondola One. Unlike Boyne Resorts’ five other D-Line lifts, the Explorer Gondola will feature squared glass enclosures, matching the style of the new tram stations and Bowl restaurant. The architecture alone will be unlike anything else in North American skiing.

Garaventa will build the reconfigured Lone Peak Tram, which will start at the new mid-mountain hub and operate year round. Large cabins will pass one tower before arriving at a glass-enclosed terminal at 11,166 feet. The new tram will be nearly twice as long as the current one but also faster and more capable.

“The new lift system from the base area to the summit of Lone Peak will revolutionize the way we access ‘America’s Matterhorn’ in both winter and summer,” said Big Sky Resort president and COO Taylor Middleton. “In creating this must-do experience accessible to all, we will offer the premier high-alpine experience on Montana’s highest scenic overlook.” Although tram cabins will be able to accommodate more passengers at once than the current 15 person tram, Big Sky plans to carefully manage throughput depending on conditions and season.

“We couldn’t think of a more significant and emblematic series of initiatives to close out the transformation we’re accomplishing with the Big Sky 2025 vision,” noted Stephen Kircher, CEO and president of Boyne Resorts. “Coupling a truly world-class tram experience with the most architecturally thoughtful on-mountain food and beverage and Mountain Sports facilities will set a new standard for mountain communities in North America. This innovative project will kick off an exciting new chapter in transforming the future of tourism in Big Sky and across southwest Montana, and sets the stage for planning Big Sky’s next steps.”

Construction will begin this summer although a project of this size will take multiple construction seasons to complete. The current Lone Peak Tram and Explorer lifts will remain in service throughout the process with the new tram set for completion in Fall 2023.

News Roundup: Olympic Infrastructure

Sugar Mountain to Construct Third Detachable

The Oma’s Meadow zone at Sugar Mountain will sport a shiny Doppelmayr high speed quad next season. The upgrade from a double to quad will be Sugar Mountain’s fifth lift installation in seven years and ride time will improve from the current nine minutes to under three. The project caps off nearly $20 million in recent improvements. Last year Sugar Mountain and Doppelmayr partnered to install the Big Birch quad and the mountain’s two existing detachable lifts were built in 2015 and 2019. No other North Carolina ski resort operates even one detachable lift. “Not only is the speediness a welcome upgrade but the detachable feature of the chairs slowing upon entering the base and summit stations makes for an easy and gentle loading and unloading experience for all levels of skiers and riders,” said Sugar Mountain Resort owner Gunther Jochl.

The 2,225 foot long Oma’s express quad will carry 2,400 passengers per hour and increase the resort’s overall uphill capacity from 11,660 passengers per hour to 13,460.

News Roundup: Ramping Up

Six Pack Coming to Holiday Valley

Holiday Valley Resort in Western New York plans to debut its first six place chairlift in 2023. The Doppelmayr detachable will be built over two years and replace the Mardi Gras Xpress, pictured above. The new flagship will transport up to 3,000 riders per hour, increasing the resort’s total uphill capacity to 25,650 people hourly.

“The Holiday Valley lift system has been recognized by our guests as one of the best in the East,” said Holiday Valley President and General Manager Dennis Eshbaugh announcing the new lift. “The Yodeler Quad Express lift built in 2021 raised the bar. The Mardi Gras 6-pack will give skiers and snowboarders an exciting new experience, with quicker access to the top of the mountain.” The project will be completed in two stages, starting with foundations for 11 new lift towers in summer 2022. The balance of construction will be completed in 2023.

Sterling Vineyards to Debut New Gondola in 2023

The one-of-a-kind gondola at a California winery will not run again, Sterling Vineyards has announced. The 1972 Hall installation, which travels in a triangle alignment, was closed in 2020 due to Covid and subsequently damaged by a wildfire. In its place, Sterling and Doppelmayr USA will partner to construct a detachable eight place gondola running in a similar historic alignment. “Over the past twelve months, our team has been working diligently to safely assess and stabilize the property and fully scope this major project,” the company wrote. “We are excited to share that we are now moving into reconstructing the winery in preparation of a re-opening in Spring 2023.”

“After careful assessment, it was determined that our beloved and historic Aerial Tram must be replaced,” the statement continued. “The Aerial Tram has been, and will continue to be, central to our visitor experience, as well as an iconic feature of the winery. We anticipate a full year of hard work ahead of us, to bring this special property back to you safely and beautifully.”

The new lift will be as modern as the old one was quaint, becoming the first D-Line lift in California and featuring Omega V cabins from CWA. The one way journey will remain similar with three stations and drive/tensioning systems located at the valley station. There will of course still be a glass of wine waiting for each rider at the first angle station. “We welcome you to join us behind the scenes as we give you sneak peeks through photos and videos of the site during construction and watch Sterling Vineyards literally rise from the ashes, regaining its historic splendor, and bouncing back to once again be one of the most visited sites in the Napa Valley.”

News Roundup: Consolidation

Celebrating a Year of Resilience

Atlantic Canada’s first gondola debuted in the Fall to rave reviews.

As clocks roll over to 2022, 42 new lifts stand tall across North America. Lift manufacturer and resort employees accomplished a lot – operating through the pandemic and adding 13 more lifts than the year before despite supply chain bottlenecks and record low unemployment. Nearly all pandemic-postponed projects from 2020 were completed thanks to skiers, mountain bikers and sightseers flocking outside this year.

Holiday Valley debuted its fourth detachable quad this season.

The 2021 lift class ranges from used T-Bars to the East’s first eight place chairlift and three new gondolas. Vail Resorts purchased the most new lifts of any single customer with seven projects across five mountains. Okemo moved a bubble detachable quad from Jackson Gore to the summit and added a six pack in its place. At Beaver Creek, a high alpine expansion will soon debut with two new quad chairs. Just as Vail’s construction projects entered the home stretch in September, the company shocked the industry and announced 19 new lifts would be built across its network in 2022. That number grew even further this month with the addition of two more projects in Pennsylvania as part of the Epic Lift Upgrade.

Okemo’s new Quantum Six, a partnership between Leitner-Poma and Vail Resorts.

Boyne Resorts moved forward with two signature Doppelmayr D-Line lifts at Loon Mountain and Big Sky Resort. Boyne also worked to open a new peak at Sunday River dubbed Merrill Hill, serviced by a Sunday River Red triple chair. Seeing how smoothly its pandemic-postponed projects went, Boyne went ahead and announced three 2022 lifts early for Boyne Mountain, Loon Mountain and Sunday River.

Merrill Hill at Sunday River awaits its inaugural season.

No new lifts debuted at Alterra mountains this year but the growing company’s pause won’t last long. Leitner-Poma completed the towers and terminal foundations for the Base-to-Base Gondola, which will be one of the most unique lifts in America when complete next year at Palisades Tahoe. The project includes four stations, three haul ropes, more than 30 towers and a cabin storage facility. Alterra also has grand plans for new lifts at Steamboat including North America’s longest gondola.

The existing Steamboat Gondola received a new bottom terminal in 2021 to make room for a second, longer gondola to be built nearby in 2022.

This year’s projects were dispersed all across the US and Canada with particular strength in the traditional Rocky Mountain and Northeast markets.

While large ski areas went big on lifts, small ski areas invested too. This new Skytrac belongs to the Steamboat town hill.

2021 saw a roughly even split between fixed and detachable lifts with both increasing from last year. Gondolas took a slight pandemic pause again but will be back in a big way next year with Palisades Tahoe, Steamboat, Whistler all planning large installations. No resorts built aerial tramways in 2021 but two new surface lifts debuted.

Loon Mountain’s new flagship eight place bubble, dubbed Kancamagus 8.

Fifteen years ago, around half of new lifts were for expansions while the other half replaced older ropeways. The share of replacement equipment has only grown, making up nearly three quarters of all projects this year. We said goodbye to many lifts from defunct manufacturers in 2021 with 12 Halls, 6 Borvigs and 3 Heron-Pomas being retired this year.

The detachable business split right down the middle with Leitner-Poma and Doppelmayr each completing eight lifts. Things will get interesting next year when MND Ropeways completes its first US detachable at Waterville Valley in partnership with Swiss manufacturer Bartholet. The last time three firms competed in the detachable space Amazon only sold books.

The fixed grip side of the business also split roughly evenly with Skytrac edging out Doppelmayr. Skytrac fabricated eight complete lifts plus two retrofit Monarch drive terminals, the most projects ever in one year for the company. Doppelmayr’s Alpenstar model continued to be popular with seven installations.

Snow King Mountain transformed this summer with a new gondola, backside expansion and summit learning center.

We saw the ski industry recover faster from the pandemic than other segments of the travel and tourism world. Only two installations were at places other than ski areas in 2020 and 2021, both gondolas at the Icy Strait Pont cruise port in Southeast Alaska.

The percentage of lifts installed used remained low this year with just seven reinstallations. Most customers opted for brand new machines from four different manufacturers.

Doppelmayr won the total project count with 18 installations while the Leitner-Poma/Skytrac duo installed 16. Partek completed a new quad chair at Trollhaugen, Wisconsin after a on-off year with no projects in 2020.

The new Cannon Valley Quad at Minnesota’s Welch Village.

Projects in 2021 were incredibly diverse, from the tiniest platter at a new Club Med in Quebec to Big Sky’s Swift Current 6, the longest D-Line chairlift in the world. The below chart shows Leitner-Poma and Skytrac roughly split their business of large lifts and small lifts while Doppelmayr covered the entire gamut of Vertical Transport Feet per Hour under one roof.

The lift companies enjoyed a great year and so did Lift Blog. A record 617,000 people visited this website in 2021 and viewed 3.6 million pages. Next year I should finally finish visiting every US ski area, a milestone I’ve been chasing since I was four years old. There’s so much to look forward to in the lift world in 2022 and I hope you follow along as I do my best to cover it all. Happy New Year!

News Roundup: Many Uses

News Roundup: Black Friday Edition