With a new gondola costing up to $22 million after a two to three year wait, Eaglecrest looks at purchasing a used 15 passenger pulse gondola from Austria.
An interesting tidbit from the Colorado Passenger Tramway Safety Board: a suspected bullet damaged the haul rope of Game Creek Express at Vail, requiring a repair.
Steamboat considers a fourth gondola connecting the base area to town, Greenhorn Ranch will include a chairlift and eight passenger chairs are in play for future lift replacements.
Maine’s Bigrock Mountain fundraises to purchase a Doppelmayr quad.
Vail Resorts today announced it will pump $320 million into its mountains coming out of the pandemic, building a whopping 19 new lifts next year. The company’s largest-ever annual investment will include a new gondola at Whistler Blackcomb, the firm’s first North American eight person chairlift at Park City and expansion into Bergman Bowl at Keystone. Vail properties across the Northeast and Midwest will also see new lifts. “Our mission at Vail Resorts is to provide an Experience of a Lifetime to anyone who visits our resorts – and delivering on that mission requires constant re-imagination and investment into the guest experience,” said Rob Katz, Chairman and Chief Executive Officer of Vail Resorts. “Our teams have been hard at work identifying significant opportunities to improve the guest experience and have produced an initial list of exciting lift upgrades, a restaurant expansion and projects that expand access to incredible terrain for next season, with more to be announced.”
Subject to government approvals, lift projects planned ahead of the 2022-23 season include:
British Columbia, Canada
Whistler Blackcomb, Creekside Gondola: A new 8-person gondola, replacing the existing 6-person gondola, will significantly improve wait times and increase out-of-base uphill capacity by 35% in the Creekside area, especially on high-volume days.
Whistler Blackcomb, Big Red Express: The replacement of the existing high-speed 4-person lift with a high-speed 6-person chair will increase uphill capacity by nearly 30% and enhance and modernize the guest experience mid-mountain out of the Creekside area.
Colorado
Keystone Resort, Bergman Bowl: Enhancements to Bergman Bowl will include a new high-speed 6-person chairlift, increasing lift-served terrain by 555 acres. Additional enhancements include 16 new trails, a ski patrol facility and snowmaking infrastructure. This project unlocks access for novice and intermediate guests and provides expanded entry to expert terrain in Independence and Erickson Bowls.
Vail Mountain, Sun Down Lift: The installation of a new high-speed 4-person chair in the Sun Down Bowl from the base of Chair 5 (High Noon Express) to the Wildwood restaurant will materially reduce wait times on peak days at Chair 5 and create the opportunity for skiers and riders to much more conveniently access the trails in Sun Down Bowl.
Vail Mountain, Game Creek Bowl: Skiers and riders will see improved reliability and capacity in this popular bowl with the replacement of the current 4-person chair with a new high-speed 6-person lift, increasing capacity by nearly 50%.
Breckenridge Ski Resort, Rip’s Ride Lift: The beginner/ski and ride school experience will be enhanced at the highly utilized Peak 8 base area by replacing the current fixed-grip double with a high-speed 4-person chair, increasing uphill capacity by nearly 70% and improving out-of-base circulation.
Utah
Park City Mountain, Eagle Lift: A high-speed 6-person chair with a new mid-station will replace the existing Eagle lift, significantly reducing crowding and wait times, and improving the guest experience, especially for beginner skiers and ski and ride school guests.
Park City Mountain, Silverlode 8-Person Lift: Vail Resorts’ first-ever high-speed 8-person chair, replacing an existing 6-person chair, will increase uphill capacity by 20% and reduce wait times at a critical spot to circulate guests on mountain.
Lake Tahoe, California & Nevada
Northstar California, Comstock Lift: A new high-speed 6-person chair will replace the existing mid-mountain 4-person chair and is designed to reduce wait times at one of the mountain’s most popular lifts and increase uphill capacity by nearly 50%.
Heavenly Ski Resort, North Bowl Lift: The replacement of an existing fixed-grip triple with a high-speed 4-person chair will increase uphill capacity by more than 40% and reduce the combined ride time of the Boulder and North Bowl lifts, which is expected to reduce wait times at the Stagecoach and Olympic lifts.
Vermont & New Hampshire
Stowe Mountain Resort, Mountain Lift: The replacement and extension of the existing fixed-grip triple to a high-speed 6-person lift will increase uphill capacity by 100%, eliminate the steep hike to the base of the lift, improve reliability on windy days and offer beginner and intermediate guests with better access to lower-level terrain choices.
Mount Snow, Sundance/Tumbleweed Lift: The replacement of the Sundance and Tumbleweed triples with one high-speed 6-person lift will improve access to underutilized terrain and alleviate pressure on other lifts in the main base area, increasing uphill capacity by nearly 70%.
Guess who is getting new lifts ahead of the 2022/2023 season? Hint: It’s us. A new high-speed quad will replace the fixed grip Sunbrook Quad, and a new high-speed six-pack will replace the fixed grip Tumbleweed and Sundance triples. #EpicLiftUpgradehttps://t.co/oWNtDv0AOQpic.twitter.com/JnDU0KJKZb
Mount Snow, Sunbrook Lift: A new high-speed 4-person chair to replace the existing fixed-grip quad will significantly decrease the current 14-minute ride time by approximately 30% and result in better utilization of the Sunbrook terrain.
Attitash Mountain Resort: The replacement of the East and West Double-Double chairs with one fixed-grip 4-person chair will improve reliability and enhance the overall guest experience.
Pennsylvania & Ohio
Jack Frost/Big Boulder: The replacement and consolidation of multiple lifts at both resorts will improve reliability and enhance the overall guest experience. Jack Frost will receive two new fixed-grip 4-person chairs (one to replace the B & C lifts and the other to replace the E & F lifts) and Big Boulder will receive a new fixed-grip 4-person chair to replace the Edelweiss Triple.
Boston Mills/Brandywine: At Boston Mills, the resort will get a new fixed-grip 4-person chair replacing the Lift 5 double. At Brandywine, a new fixed-grip 4-person chair will replace the Lift 3 triple.
Including this latest capital plan dubbed the Epic Lift Upgrade, Vail Resorts’ total investment is expected to reach approximately $2.2 billion over 15 years. The move comes as Vail enjoys brisk season pass sales. Epic Pass adoption through September 17, 2021 for the upcoming 2021/2022 North American winter season increased approximately 42 percent in units and approximately 17 percent in sales dollars as compared to the same period in the prior year. Compared with pre-pandemic 2019, Epic Pass sales increased an incredible 67 percent in units and 45 percent in sales dollars.
Although no manufacturers were identified for the 19 new lifts, an initiative of this size is likely to include multiple suppliers.
Starting next year, most Big Sky Resort lift tickets, season passes, Ikon and Mountain Collective passes will no longer include access to the Lone Peak Tram.
Cape Smokey provides an update on Canada’s only new gondola this year.
Schweitzer introduces a new logo and brand identity.
Despite losing a significant portion of the season, another Ontario ski area still plans to complete a new chairlift for next season.
Doppelmayr France is selected to build and maintain a five station urban gondola in Paris.
Doppelmayr also will build the first urban gondolas in Guatemala.
Another postponement: the Goldenhorn surface lift at Aspen Highlands, now scheduled to be built next year.
Carvatech, an independent manufacturer of gondola and tramway cabins, launches a cool new website.
Mexico’s Grupo Vidanta updates customers on COVID-19 and includes awesome footage of its future gondola system.
As tax revenues fall, a new chairlift for Great Bear may be one of the first items to go from the City of Sioux Falls’ 2021 budget.
Jon Schaefer, the first US ski area owner to close due to the coronavirus and creator of Goggles for Docs, turns his attention to getting resort employees back to work.
Aspen Skiing Company delays updating plans for the Pandora’s expansion due to COVID-19.
Citing favorable financing conditions, Zermatt Bergbahnen AG commits to spending $62 million on lifts over the next two years, including a D-Line gondola and the Alpine Crossing 3S.
The last North American ski area still operating, Lookout Pass, closes for the season.
Leitner-Poma is hiring installers for projects at Arapahoe Basin, Arizona Snowbowl, Aspen Snowmass, Breckenridge, Keystone and Okemo.
A group of 150 former members buys the Hermitage Club and its five chairlifts for the bargain price of $8.06 million.
Arapahoe Basin lays off 430 seasonal employees and cuts the hours of year round staff.
Children of the man who died on a Vail chairlift earlier this season retain a Denver law firm for possible litigation.
In addition to virtually all ski resorts worldwide, coronavirus shuts down urban gondolas including La Paz’s Mi Teleférico, Medellín’s Metrocable, Santo Domingo’s Teleférico and London’s Emirates Air Line.
Here are details on the upcoming Hermitage auction including removal deadlines, the proposed asset purchase agreement with Boyne and the original lift quote.
Sugarloaf’s General Manager and VP of Mountain Operations joinWSKI TV to break down Sugarloaf 2030 and plans for a D-Line lift.
A man dies in a terrible accident involving the Skyline Express at Vail. A preliminary investigation suggests he slipped through a chair’s seat, was caught by his jacket and asphyxiated.
Former Vail Resorts mountain division head Chris Jarnot becomes a consultant for the upcoming Mayflower Mountain Resort in Park City.